| Raw material | PVC powder |
| Temperature Sensor | Omron |
| Packaging Details | NORMAL PACKAGE |
| Payment Terms | L/C,T/T |
| Supply Ability | 15 SETS PER MONTH |
| Delivery Time | 45 WORKING DAYS |
| Material of Screw | 38CrMoALA |
| Color | Customizable |
| Screw Design | conical twin screw |
| Delivery | Export film packing |
| Inverter | ABB |
| Original of place | China |
| name | PVC Pipe Extrusion Line |
| Brand | Langbo |
| Plastic | PVC |
| Application | pipe making |
| Brand Name | LB |
| Model Number | LB-65//132 |
| Certification | CE ISO |
| Place of Origin | ZHANGJIAGANG, JIANGSU, CHINA |
View Detail Information
Explore similar products
CE PVC Pipe Extrusion Line For Water / Waste Pipe Automatic Control
PLC Touch Screen PVC Pipe Extrusion Line Twin Screw Tube Making Machine
Durable Four PVC Pipes Manufacturing Machine 250KG/H / 350KG/H Capacity Double
Automated double PVC Pipe Extrusion Line 150KG/H / 250KG/HR Product Capacity
Product Specification
| Raw material | PVC powder | Temperature Sensor | Omron |
| Packaging Details | NORMAL PACKAGE | Payment Terms | L/C,T/T |
| Supply Ability | 15 SETS PER MONTH | Delivery Time | 45 WORKING DAYS |
| Material of Screw | 38CrMoALA | Color | Customizable |
| Screw Design | conical twin screw | Delivery | Export film packing |
| Inverter | ABB | Original of place | China |
| name | PVC Pipe Extrusion Line | Brand | Langbo |
| Plastic | PVC | Application | pipe making |
| Brand Name | LB | Model Number | LB-65//132 |
| Certification | CE ISO | Place of Origin | ZHANGJIAGANG, JIANGSU, CHINA |
| High Light | Plastic Conduit Extrusion Line ,40mm PVC Pipe Extrusion Line | ||
PVC pipes are widely applied due to their numerous advantages:
The pipe production process begins with raw material preparation. Customers can mix PVC powder with additives themselves. The mixture is fed into the extruder where it is plasticized and extruded into the mold. The material is shaped by the mold and emerges as pipe. The hot, soft pipe exiting the mold is calibrated and cooled in the vacuum calibration tank using a vacuum sleeve. Further cooling occurs in the cooling tank. A haul-off unit then pulls the pipe away from the extruder. Finally, the pipe is cut to defined lengths and packaged for transport.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler
Year Established:
2012
Total Annual:
4 million-7 million
Employee Number:
100~150
Ecer Certification:
Verified Supplier
.gtr-container-xyz789 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #222; line-height: 1.6; padding: 15px; box-sizing: border-box; overflow-x: hidden; } .gtr-container... .gtr-container-xyz789 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #222; line-height: 1.6; padding: 15px; box-sizing: border-box; overflow-x: hidden; } .gtr-container...
Get in touch with us
Leave a Message, we will call you back quickly!