China factories

China factory - Wuhan Visbull Machinery Co., Ltd.

Wuhan Visbull Machinery Co., Ltd.

  • China,Wuhan ,Hubei
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China 1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix
China 1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix

  1. China 1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix
  2. China 1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix

1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix

  1. MOQ: 1Set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms D/A, D/P, L/C, T/T, Western Union, MoneyGram
Supply Ability 500set per month
Delivery Time 25-30working days after received your payment
Packaging Details Nude packing in container.
Productivity 3-5 ton/h
Fuel Light Diesel Fuel
Discharge Temperature 120°-160°
Feed Port Capacity 0.2M3/barrel
Generator Output 380V / 50HZ
Oil Supply Pressure 1.2MPA
Wind Supply Pressure 280mmHg columniation (2.8kpa) Front combustor
Dimension 4000X1800X2800mm
Weight 3.8Tons
Diesel Engine 10KW
Brand Name Visbull
Model Number SLJ-5
Certification CE/SGS/ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms D/A, D/P, L/C, T/T, Western Union, MoneyGram Supply Ability 500set per month
Delivery Time 25-30working days after received your payment Packaging Details Nude packing in container.
Productivity 3-5 ton/h Fuel Light Diesel Fuel
Discharge Temperature 120°-160° Feed Port Capacity 0.2M3/barrel
Generator Output 380V / 50HZ Oil Supply Pressure 1.2MPA
Wind Supply Pressure 280mmHg columniation (2.8kpa) Front combustor Dimension 4000X1800X2800mm
Weight 3.8Tons Diesel Engine 10KW
Brand Name Visbull Model Number SLJ-5
Certification CE/SGS/ISO9001 Place of Origin China
High Light asphalt concrete plantasphalt processing plant

1.2 MPA Oil Supply Pressure Asphalt Mixing Plant , 5TPH Towed Bitumen Mix Concrete Batch Plant

 

5TPH Towed Bitumen Mixer SLJ - 5 With 10KW Diesel Engine 1 . 2 MPA Oil Supply Pressure

5Tons Per Hour Asphalt Mixer SLJ-5

 

Specifications:

 

1.MODEL                                  

SLJ-5

2.PRODUCTIVITY (T/H)                         

3-5 ton/h

3.FEED PORT CAPACITY(M3/  barrel)                     

0.2M3/barrel

4.SUITABLE FOR                

ASPHALT,CONCRETE,

ASPHALT MACADAM 

5.COMBUSTOR TECHNOLOGY 

PARAMETER

 

(1)FUEL                                

 LIGHT DIESEL FUEL

(2)CALORIC VALUE (kal/kg)                               

10000

(3)OIL SUPPLY PRESSURE

1.2MPA(Front nozzle)

(variable range 0.6-1.5MPA)

(4)OIL SUPPLY TEMPERATURE

 

     a,DIESEL               

ROOM TEMPERATURE

(FAT-DIESEL OIL HEATED)

b,CRUDE OIL (°)                 

60 °(Front nozzle)

(5)TEMPERATURE:

Room Temperature

(variable range From 10 to

 300 degree)

(6)WIND SUPPLY PRESSURE:

280mmHg columniation (2.8kpa) 

Front combustor

(7)FLAME SPEED:

80—90m/s(Max.Spray 

Speed150m/s)

(8)FLAME SHAPE:

Original shpae spread cone 

angle shape 10°

(9)FLAME LENGTH:

5 times as injection fire diameter

 (Range from 2 to 12 timees)

(10)IMPERFECT COMBUSTION:

less 0.1% charcoal and dust 

content lesss than 70 mg./M3 

(11)FLAME REFERENCE TEMPERATURE:

2060°

(12)BURN OIL/HOUR:

20kg(variable 15-25)

(13)PRODUCE THERMAL/HOUR:

20 ten thouands kcal.kilocalorie

6,SUPPORTING POWER:                     

rotate ratio(rotate/minute)

19.75kw    

MAIN ROLLER

3KW

 ASPHALT PUMP                                

2.2KW 

 

Operation and Function

 

The user should assign specific people who operate the machine and familiarize 

operation manual basically, and put the machine into project building after adjusting

 it to work regularly.

 

Testing and preparation work before use

 

a. Start cylinder motor, the tube is transferred, reverse cycle several times to check 

whether their operation is normal or any un-normal aspects.

b. Lift the hopper, raise and down it again and again to make sure each component 

of every engine flexible and reliable, up and down smoothly, the hopper door open 

and close freely and position fixedly.

c.Start all the ventilation blowers to inspect if there is any air leak inside the middle 

pipe.

d. Inspect all bolts fasten or not, especially the gasket ring, reducer bearings, 

furnace body bearings, supporting roller bearings, and other parts.

 

Whole set trial before production

 

a. Filled the hopper with the mineral, asphalt tank should fill with hot asphalt 

(asphalt temperature must above 160 ℃), the diesel oil tank filled with diesel oil.

b. Asphalt supply value adjustment:

Needed time=  needed time     X   60 (second)

c. Drying time set: due to temperature, moisture level of mineral aggregate, the 

impact of factors such as temperature and drying time required in a certain range 

adjustment may generally be adjusted in 200 to 260 seconds.

d. Mixing time settings: general mixing time set around 60 seconds, can be uniform

 mixing.

 

Natural operational procedure

 

Generator output 380V, 50HZ three phase alternating current 

Inspect each phase position of electric motor to evaluate if it is up to the mustard

Check the asphalt temperature reach 170 ℃ or not, so that asphalt pump can spray.

After inspection, start the dust abatement draft fan, burning draft fan, then start 

cylinder and keep it running at the parch direction.

Start lifter, pour inert solid into tube, discharge the hopper.

Start the diesel pump, then press the ignition start, open oil pipe switch, after a few

 seconds to see whether the firing was successful, if unsuccessful, start the blower 

fan button, if not succeed, close the diesel pump and oil pipe switch, after 3 minutes

 do it again. 

g. When drying time arrived, stop diesel pump, the asphalt electric motor start by

 itself at the same time. Put hot asphalt into the cylinder body, through asphalt time 

relay cut off electrical asphalt motor automatically.

h. When the setting of the mixing time over, the main motor cylinder cut off 

automatically. 

Then press out materials button, making the motor reversal, finished unloading 

materials until disposal to do so, a cycle ends here.

i. Second to re-mix the material, from the “d” item start for the next cycle.

 

Stands operation after the end of machine-team 

 

a. After the unit to make cylinder idling 3-5 minutes.

b. Flicking the oil back switch, absorb the residual oil in the pipeline.

c. Clean up the residual asphalt inside the asphalt pump

d. Clean Asphalt pump use diesel cycle, open outer oil absorb port and hand spray

 gun valve, other valves closed.

e. Close all motors and the diesel motor

f. Discharge all the asphalt remaining in the asphalt tank.

g. Release the dust in the Dust Collectors.

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    1990

  • Total Annual:

    8000000-10000000

  • Employee Number:

    500~600

  • Ecer Certification:

    Site Member

Since 1990, Wuhan Visbull Machiney Co., Ltd. has exported engineering machinery, Construction machinery and agricultural machinery machinery to international markets. Satisfying customers' stated and implied needs has always been the focus of business policy of Visbull. As a futher step to satis... Since 1990, Wuhan Visbull Machiney Co., Ltd. has exported engineering machinery, Construction machinery and agricultural machinery machinery to international markets. Satisfying customers' stated and implied needs has always been the focus of business policy of Visbull. As a futher step to satis...

+ Read More

Get in touch with us

  • Reach Us
  • Wuhan Visbull Machinery Co., Ltd.
  • Room 521 Building 3 Mingshiyihao Shucheng Road Hongshan District Wuhan 430070 China
  • https://www.roadconstruction-machine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement