| Packaging Details | Carton |
| Delivery Time | 2-3 Weeks |
| Payment Terms | T/T |
| End Hole Caliber | 73mm |
| Feature | High Efficiency |
| Service | be pleased |
| Engine | Diesel or Electric Motor |
| Max Drilling Dia | 1.8m |
| Mud Pump | Max displacement 250L/min, max 10Mpa |
| Drilling Hole Dia | 75 mm |
| Splitter Stroke | :800-1000mm |
| Chuck | φ50-φ150mm / φ73-φ280mm |
| Feed Stroke | 3,450mm |
| Safety Features | Emergency shutdown, overload protection |
| Drill Weight | 1300kg |
| Pipe Dia | 50 OR 60 MM |
| Pullback Force | 215KN |
| Drill Pipe Specification | Ф89*4300 mm |
| Place of Origin | China |
| Brand Name | Xianfeng |
View Detail Information
Explore similar products
Jumbo Drilling Rig Hydraulic System Boring Rig For Tunneling And Mining XUB125
XUD125 Jumbo Hydraulic Drilling Rig Machine Dual Boom For Underground Mining
XCMG XTD3130 Hydraulic Drilling Rig Underground Jumbo Heavy Duty Three Arm
KJ321 Hydraulic Tunneling Jumbo Mine Machine Drilling Rig For Underground
Product Specification
| Packaging Details | Carton | Delivery Time | 2-3 Weeks |
| Payment Terms | T/T | End Hole Caliber | 73mm |
| Feature | High Efficiency | Service | be pleased |
| Engine | Diesel or Electric Motor | Max Drilling Dia | 1.8m |
| Mud Pump | Max displacement 250L/min, max 10Mpa | Drilling Hole Dia | 75 mm |
| Splitter Stroke | :800-1000mm | Chuck | φ50-φ150mm / φ73-φ280mm |
| Feed Stroke | 3,450mm | Safety Features | Emergency shutdown, overload protection |
| Drill Weight | 1300kg | Pipe Dia | 50 OR 60 MM |
| Pullback Force | 215KN | Drill Pipe Specification | Ф89*4300 mm |
| Place of Origin | China | Brand Name | Xianfeng |
| High Light | hydropower projects Hydraulic Drilling Rig ,102mm Hydraulic Drilling Rig ,45mm hydraulic crawler drilling rig | ||
The XUB135 hydraulic drilling jumbo is a high-performance underground drilling rig designed for tunneling, mining, and large-scale infrastructure projects. It is equipped with advanced hydraulic control systems, dual-boom configuration, and powerful rock drills, enabling fast and precise drilling even in challenging geological conditions. The rig is suitable for medium to large tunnel cross-sections and offers excellent stability, efficiency, and operator comfort.
Dual-boom design for efficient parallel drilling
High penetration rate with powerful hydraulic rock drills
Accurate boom positioning for optimized drilling coverage
Comfortable, ergonomic operator cabin with advanced controls
Durable structure for long service life in tough environments
| Parameter | Value |
|---|---|
| Number of Booms | 2 |
| Drilling Diameter | 45 – 102 mm |
| Hole Depth | Up to 5.5 m per hole |
| Rock Drill Power | 18 – 25 kW |
| Power Source | Diesel + Electric drive |
| Gradeability | 14° – 18° |
| Overall Dimensions | ~12,500 × 2,500 × 3,500 mm |
Tunneling for road, railway, and hydropower projects
Underground mining development and production drilling
Large-scale civil engineering construction
High drilling speed and positioning accuracy
Adaptable to various geological conditions
Stable operation with low maintenance requirements
Enhanced safety and operator comfort
Company Details
Business Type:
Manufacturer
Year Established:
2020
Total Annual:
5000000-10000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
/* Unique root container for style encapsulation */ .gtr-container-a1b2c3d4 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; box-sizing: border-box; max-width: 100%; ... /* Unique root container for style encapsulation */ .gtr-container-a1b2c3d4 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; box-sizing: border-box; max-width: 100%; ...
Get in touch with us
Leave a Message, we will call you back quickly!