Packaging Details | Wooden cases |
Delivery Time | 10 Work Days |
Payment Terms | T/T,Cash,L/C,Western Union,MoneyGram |
Supply Ability | 5 units per month |
warranty | 1 Year |
customized support | OEM, ODM, OBM, Software reengineering |
place of origin | Guangdong, China |
model number | CF9182 |
Keyword | IEC61215 Photovoltaic Modules Hail Machine |
Power supply | 220V 50Hz |
Impact area | 2000x1000mm |
Weight | 400kg |
Place of Origin | China |
Brand Name | CHENGFENG |
Certification | ISO,CE |
View Detail Information
Explore similar products
Non Combustibility Test Machine For Fireproof Building Materials
ASTM E1886-2005 Curtain Wall Building Material Testing Equipment Anti Wind
CF8785 Roof System Wind Resistance Testing Apparatus Used In Construction
6KW Construction Material Testing Equipment Fire Resistance Tester For Building
Product Specification
Packaging Details | Wooden cases | Delivery Time | 10 Work Days |
Payment Terms | T/T,Cash,L/C,Western Union,MoneyGram | Supply Ability | 5 units per month |
warranty | 1 Year | customized support | OEM, ODM, OBM, Software reengineering |
place of origin | Guangdong, China | model number | CF9182 |
Keyword | IEC61215 Photovoltaic Modules Hail Machine | Power supply | 220V 50Hz |
Impact area | 2000x1000mm | Weight | 400kg |
Place of Origin | China | Brand Name | CHENGFENG |
Certification | ISO,CE | ||
High Light | Photovoltaic Modules Hail Impact testing ,IEC61215 Hail Impact testing ,IEC61215 Impact testing Equipment |
Photovoltaic Modules
IEC61215 Standards Testing
Hail Machine
Impact Test Equipment
Impact Tester
IEC61215 Solar Panel Hail Impigement Testing Machine
Anti-Hail Impact Testing Machine
Hail Impact Testing Apparatus
Ice Ball Impact Testing Machine
Photovoltaic module hail impact testing machine use: to verify the ability of the module to resist hail impact, the artificial ice ball is used to simulate hail, and hit the module at a constant speed to simulate the impact of hail climate on the module.
1. Launching device
a. The power source is compressed air of the air compressor
b. Air pressure: 6~8bar
c. Ice hockey pucks are manually single-shot loaded
d. The length of the barrel is about 940mm
e. The barrel can be replaced
2. a mobile positioning device
a. The X-axis moving distance is about 2100mm
b. The Y-axis moving distance is about 1000mm
C. Positioning accuracy≤1mm
d. Impact area 2000x1000mm
e. The guiding mode is a high-quality imported guide rail
f. The driving mode adopts imported servo motor + synchronous wheel
j. The positioning control mode is the automatic positioning of the upper computer control
3. Speed measurement system and principle
a. By measuring the time when the puck passes through the infrared velocity sensor, and at the same time grabbing the time t when the infrared rays are blocked, the speed of the puck is calculated according to V=S/t
b. The speedometer adopts high-precision infrared speed sensor
C. The accuracy of infrared speed sensor ±5%
d. The speed grasping range is 0~40m/s
e. Ice hockey speed: 25mm diameter puck speed 23.0m/s±5%
35mm diameter puck speed 27.2m/s±5%
Diameter 45mm puck speed 30.7m/s±5%
4. Ice hockey preparation method and mold
a. Fill the ice hockey mold with water and put it in the refrigerator freezer, and after the water cools and freezes, take out the ice hockey ball separately and place it in the ice hockey storage box for later use.
b. The mold is made of special material that is not easy to expand and deform
c. The diameter of the inner cavity is 25mm<1%; 35mm<1%; 45mm<1%
d. 6 pucks in one mold; At least 2 sets of molds in one specification
e. The mold cavity processing technology is processed by high-precision CNC machine tools
f. The diameter of the ice hockey puck is 25mm<5%; 35mm<5%; 45mm<5%
g. The weight of the ice hockey is 7.53g<5%; 20.7g<5%; 43.9g<5%
h. Refrigerator -10 °C
Packaging & Shipping:
FAQ:
A:We are factory in Dongguan City, Guangdong Province,China.Near Shenzhen or Guangzhou.Q:Are you factory or trading company?
Q:What kind of certificate you have?
A:ISO9001 Certification, CE Certification.
Q:What is the lead time of the product?
A: Generally 7-15 days after getting the deposit.
Q:How about the payment term?
A: T/T, by cash, western union, or L/C.
Q:How about the warranty term?
A:1 year warranty,The engineer can teach the machine on the spot.
Company Details
Business Type:
Manufacturer
Year Established:
2004
Total Annual:
5000-8000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
CHENGFENG is a professional manufacturer of Building materials/ Wire/ Plastics/ Rubber Fire retardant testing equipment 1. Fire Testing Equipment 2. Building Material Fire Tester 3. Wire and Cable Fire Tester 4. Environmental Test Chamber 5. Textile Testing Equipment 6. Plastic T... CHENGFENG is a professional manufacturer of Building materials/ Wire/ Plastics/ Rubber Fire retardant testing equipment 1. Fire Testing Equipment 2. Building Material Fire Tester 3. Wire and Cable Fire Tester 4. Environmental Test Chamber 5. Textile Testing Equipment 6. Plastic T...
Get in touch with us
Leave a Message, we will call you back quickly!