| Delivery Time | 80~120 days |
| Packaging Details | Steel frame |
| Material Of Fin | Q235B |
| Nde Requirements | 100% PT,100 RT,100% UT |
| Grade | A |
| Product Name | Boiler Water Wall Panel |
| Brand Name | Saneco |
| Certification | ASME, EN, GB, ISO |
| Place of Origin | China |
View Detail Information
Explore similar products
Carbon Steel Water Wall Panel/Alloy Steel Boiler Membranes Wall for Power Plant
ASME Approved Boiler Wall Membrane System for Chemical Industry
Submerged-Arc Welding Corrosion Resistant Boiler Membrane Wall For Welding
ISO Boiler Water Wall Panels For Sugar Mill Repair According ASME Section 1
Product Specification
| Delivery Time | 80~120 days | Packaging Details | Steel frame |
| Material Of Fin | Q235B | Nde Requirements | 100% PT,100 RT,100% UT |
| Grade | A | Product Name | Boiler Water Wall Panel |
| Brand Name | Saneco | Certification | ASME, EN, GB, ISO |
| Place of Origin | China | ||
| High Light | Power Plant water wall tube ,GB Standard water wall tube ,custom boiler membrane | ||
Boiler Water Wall Panel in GB Standard Made of Carbon Steel for Power Plant Boilers
Introduction
Water wall panels are used in modern industrial boilers to replace steam generating tubes. They are designed to absorb high temperature radiant heat given off by the flame in the fuel chamber, and reduce heat loss caused by the air tightness. We manufacture boiler tubes of the water wall panels in a variety of shapes and sizes to meet customer requirements, and all are processed using automatic fin to tube welding machines and large tube benders.
Materials for water wall panels
20# Steel, SA192, SA 106B, 15CrMoVG, 12Cr1MoV
Standards
ASME Code standard, GB Standard
Quality inspection
MT, RT, Hydraulic test
Application
| 1 | Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between. |
| 2 | These walls form the enclosure of the coal combustion chamber. |
| 3 | Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler. |
Note
| 1 | Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances. |
| 2 | Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation? |
| 3 | Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule. |
| 4 | The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost. |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...
Get in touch with us
Leave a Message, we will call you back quickly!