China factories

Chat Now Send Email
China factory - SuZhou Saneco boiler co.ltd

SuZhou Saneco boiler co.ltd

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom
China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom

  1. China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom
  2. China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom
  3. China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom
  4. China Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom

Power Plant Water Wall Tube Panel Boiler Membrane GB Standard Custom

  1. MOQ: 20 tons
  2. Price:
  3. Get Latest Price
Delivery Time 80~120 days
Packaging Details Steel frame
Material Of Fin Q235B
Nde Requirements 100% PT,100 RT,100% UT
Grade A
Product Name Boiler Water Wall Panel
Brand Name Saneco
Certification ASME, EN, GB, ISO
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Delivery Time 80~120 days Packaging Details Steel frame
Material Of Fin Q235B Nde Requirements 100% PT,100 RT,100% UT
Grade A Product Name Boiler Water Wall Panel
Brand Name Saneco Certification ASME, EN, GB, ISO
Place of Origin China
High Light Power Plant water wall tubeGB Standard water wall tubecustom boiler membrane

Boiler Water Wall Panel in GB Standard Made of Carbon Steel for Power Plant Boilers

Introduction

 

Water wall panels are used in modern industrial boilers to replace steam generating tubes. They are designed to absorb high temperature radiant heat given off by the flame in the fuel chamber, and reduce heat loss caused by the air tightness. We manufacture boiler tubes of the water wall panels in a variety of shapes and sizes to meet customer requirements, and all are processed using automatic fin to tube welding machines and large tube benders.

 

Materials for water wall panels
20# Steel, SA192, SA 106B, 15CrMoVG, 12Cr1MoV

Standards
ASME Code standard, GB Standard

Quality inspection
MT, RT, Hydraulic test

 

Application
 

1 Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between.
2 These walls form the enclosure of the coal combustion chamber.
3 Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

Various Boiler Water Wall Panel Can Be Fabricated

  • Membrane boiler water wall panel: spot welds many rolled finned tubes into a sealed combined heating surface, which improves the airtightness of the furnace and reduces air leakage.
  • Studded water wall tubing: welds pins of 20 to 25 mm in length and 6 to 12 mm in diameter on the water wall tube, and then applies a chrome ore refractory plastic to reduce the water wall panel’s heat absorption, and increase the temperature in the combustion zone. It is appropriate for situations where it is difficult to set fire to the fuel, as well as specific slag tapping furnaces.
  • Plain tube boiler water wall panel: composed of a whole row of seamless steel pipes, the simplest structure.
  • Wall-attached boiler water wall tubing: embedded in the inner wall of the furnace wall, single-sided heat absorption.
  • Double-sided heated water wall panel: installed in the middle of the large boiler furnace, which is divided into two parts that are independent of each other, and both sides are heated.

Note
 

1 Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances.
2 Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation?
3 Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule.
4 The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2024

  • Total Annual:

    1000-2000

  • Employee Number:

    200~300

  • Ecer Certification:

    Verified Supplier

SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...

+ Read More

Get in touch with us

  • Reach Us
  • SuZhou Saneco boiler co.ltd
  • N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.sanecoboiler.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement