| Supply Ability | 6000 tons/year |
| Delivery Time | 80~120 days |
| Packaging Details | Steel frame |
| Production Technique | Hot Bending, Extrusion |
| Surface Treatment | Painted/Anti-corrosion Coating |
| Range Of Applications | Industrial / Power Station |
| Material | Carbon Steel |
| Brand Name | Saneco |
| Place of Origin | China |
View Detail Information
Explore similar products
Heat Recovery Feed Water Boiler Economizer Coils SA210M A1 Steel
High Strength Spiral Type Boiler Fin Tube Resistant Corrosion For Economizer
SA210A1 Tubes Boiler Economizer With Manifolds Header For Coal Fired Power Plant
Waste Heat Recovery H Fin Tube High Frequency Welding Industrial Boiler
Product Specification
| Supply Ability | 6000 tons/year | Delivery Time | 80~120 days |
| Packaging Details | Steel frame | Production Technique | Hot Bending, Extrusion |
| Surface Treatment | Painted/Anti-corrosion Coating | Range Of Applications | Industrial / Power Station |
| Material | Carbon Steel | Brand Name | Saneco |
| Place of Origin | China | ||
| High Light | ASME Standard economiser coils ,CS economiser coils ,CS finned tube economizer | ||
ASME Standard Boiler Economizer Coils Made Of Carbon Steel With Shields and Handcuffs
Product Introdution
Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.
The tubular economizer consists of a series of parallel serpentine tubes, which are made of seamless steel pipes with an outer diameter of 25 ~ 42 mm, and the pipes are usually arranged in a staggered arrangement.
Working Process of Boiler Economizer
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Parameters of Boiler Economizer
| Description | Boiler economizer |
| Material of Base Tube | SA210A1 |
| Material standard | ASTM |
| Dimension | Customization |
| Weight | Min: 10 ton Max.:1000 ton |
| Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
![]()
Company Profile
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from
design, manufacturing to installation and maintenance.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2024
Total Annual:
1000-2000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic... SuZhou Saneco boiler co.ltd is a high-tech enterprise specialized in producing of boiler spare parts, such as fin tubes, economizers, super-heater and re-heater, boiler water wall panels, boiler manifold headers, and boiler steam drums for industrial boilers. Company also provide turnkey servic...
Get in touch with us
Leave a Message, we will call you back quickly!