| Dimensions | 50 cm x 20 cm x 10 cm |
| Finish | Galvanized |
| Material | Steel bracing |
| Payment Terms | T/T |
| Edge Design | Flanged / Ribbed Safety Edges |
| Delivery Time | 15 |
| Platform Type | Metal Grate Platform |
| Pedal Length | 1880 mm |
| Available Lengths | 2000mm / 2400mm / 3000mm / 4000mm |
| Supply Ability | 100000 |
| Max Lifting Height | Customizable up to 8 meters |
| Certification | CE, ISO 9001 |
| Place of Origin | china |
| Brand Name | xsh |
View Detail Information
Explore similar products
Galvanized Steel Ringlock Scaffolding System with 25kN - 35kN Load Capacity and
Galvanized H Frame Scaffold with 10kN - 35kN Load Capacity and Quick Assembly
High-Tensile Steel Adjustable Scaffolding Steel Prop with Threaded Shaft and Hot
Galvanized Scaffolding Plank Steel Walk Board Perforated Metal Scaffold Plank
Product Specification
| Dimensions | 50 cm x 20 cm x 10 cm | Finish | Galvanized |
| Material | Steel bracing | Payment Terms | T/T |
| Edge Design | Flanged / Ribbed Safety Edges | Delivery Time | 15 |
| Platform Type | Metal Grate Platform | Pedal Length | 1880 mm |
| Available Lengths | 2000mm / 2400mm / 3000mm / 4000mm | Supply Ability | 100000 |
| Max Lifting Height | Customizable up to 8 meters | Certification | CE, ISO 9001 |
| Place of Origin | china | Brand Name | xsh |
| High Light | Galvanized Scaffolding Prop ,8 Meters Shoring Prop ,Ribbed Safety Edges Scaffolding Prop | ||
The Adjustable Steel Scaffolding Prop is a reusable temporary support component designed for formwork, slab work, ceiling support, renovation, and general construction scaffolding. It is built from an inner tube, outer tube, threaded collar, locking pin, handle, top plate, and base plate, allowing adjustable positioning on suitable indoor job sites. The prop is engineered for practical installation wherever temporary vertical support is required.
The adjustable scaffolding prop uses telescoping steel tubes with regularly spaced holes for coarse adjustment. The threaded collar provides fine height positioning, while the locking pin helps secure the selected setting. A top plate transfers contact to the supported timber or formwork member, and the base plate provides a stable interface with the floor. Available configurations may include different surface finishes, head types, and base plate styles. Confirm the exact configuration before ordering.
During installation, the outer tube is positioned on the floor and the inner tube is raised toward the supporting member. The locking pin is inserted through the aligned holes, then the threaded collar is rotated for final adjustment. The prop should be installed vertically on a firm, level base and used together with a complete temporary works design. Typical applications include indoor scaffolding, residential construction, commercial construction, concrete formwork, ceiling support, renovation, and construction scaffolding systems.
| Item | Information |
|---|---|
| Product Type | Adjustable Steel Scaffolding Prop |
| Main Components | Inner tube, outer tube, threaded collar, locking pin, handle, top plate, base plate |
| Adjustment Method | Hole positioning plus threaded collar adjustment |
| Surface Options | Painted or metallic finish; confirm required treatment |
| Head Options | Top plate, U head, or forkhead options may be available; confirm before order |
| Application | Indoor concrete construction, formwork, ceiling support, renovation, and scaffolding |
| To Be Confirmed | Adjustment range, tube diameter, wall thickness, working load, standard, and certification |
The main advantages are reusable steel construction, adjustable positioning, simple mechanical operation, multiple configuration options, and compatibility with temporary support work. Quality inspection should cover tube straightness, welds, thread movement, pin fit, plate alignment, surface finish, and packing. We can support product selection, configuration confirmation, packing coordination, and shipment preparation. Please provide the required adjustment range, application, quantity, destination, and technical standard for a quotation.
Inspect the prop before use, place it vertically on a firm level surface, select the correct hole position, install the locking pin, and tighten the threaded collar without over-adjustment. Do not use damaged tubes, bent plates, loose pins, unstable bases, or unapproved extensions. Do not exceed the confirmed working load.
Always install and use this prop in accordance with a complete temporary works design and applicable site safety requirements.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
3000W-8000W
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Sichuan Xinshenghang Technology Co., Ltd Founded in 2010, we own 16+ years of professional experience in scaffolding R&D, automated production, domestic sales and worldwide export business. Our factory is equipped with CNC automatic welding production lines and hot-dip galvanizing treatment wo... Sichuan Xinshenghang Technology Co., Ltd Founded in 2010, we own 16+ years of professional experience in scaffolding R&D, automated production, domestic sales and worldwide export business. Our factory is equipped with CNC automatic welding production lines and hot-dip galvanizing treatment wo...
Get in touch with us
Leave a Message, we will call you back quickly!