| Height | 0.3 meters |
| Main Frame Size | 1219 x 1930mm |
| Main Material | Steel |
| Supply Ability | 100000 |
| Hole Spacing | Precision 50mm centers |
| Adjustment Method | Threaded Shaft With Wing Collar |
| Hole Shape | Circular with Raised Bevel Edge |
| Payment Terms | T/T |
| Corrosion Resistance | High |
| Delivery Time | 15 |
| Loadtype | Static and dynamic loads |
| Certification | CE, ISO 9001 |
| Brand Name | xsh |
| Place of Origin | china |
View Detail Information
Explore similar products
Hotel / Villa Scaffolding Part Heavy Duty Scaffolding Metal Deck With Secure
Safety Perforated Scaffolding Metal Deck With Safe Connection Hook Hooks
EN1065 Scaffolding Part Industrial Scaffolding Walkboard With Perforated Working
Q235 Steel Anti Skid Scaffolding Walkboard Customized With Expanded Metal Deck
Product Specification
| Height | 0.3 meters | Main Frame Size | 1219 x 1930mm |
| Main Material | Steel | Supply Ability | 100000 |
| Hole Spacing | Precision 50mm centers | Adjustment Method | Threaded Shaft With Wing Collar |
| Hole Shape | Circular with Raised Bevel Edge | Payment Terms | T/T |
| Corrosion Resistance | High | Delivery Time | 15 |
| Loadtype | Static and dynamic loads | Certification | CE, ISO 9001 |
| Brand Name | xsh | Place of Origin | china |
| High Light | High Corrosion Resistance Scaffolding Prop ,Threaded Shaft With Wing Collar Adjustment Adjustable Steel Prop ,Precision 50mm Hole Spacing Construction Support Prop | ||
This adjustable steel scaffolding prop is designed for temporary support in construction scaffolding, formwork, and slab support applications. Its telescopic tube structure combines pin positioning with screw adjustment, allowing installers to set the working height according to project requirements.
The product images show multiple prop configurations, top and base plate options, color finishes, and bundled storage formats. Confirm the selected height range, tube specification, and support accessories before ordering.
The steel scaffolding prop utilizes an outer tube, inner tube, adjustment collar, locking pin, and support plates. The pin provides initial height positioning, while the threaded adjustment section enables finer leveling. This combined adjustment method supports practical installation and removal on changing work sites.
Steel construction provides a rigid support structure, while the plate design helps distribute contact at the upper and lower support points. Finish, tube diameter, plate shape, and accessory selection can be matched to the intended scaffolding system after technical confirmation.
Use the scaffolding prop as a temporary vertical support beneath formwork, beams, slabs, or other approved structural support arrangements. During installation, place the base plate on a firm, level, and adequately supported surface.
Extend the inner tube, insert the positioning pin, and rotate the adjustment collar until the required contact is achieved. The prop works by transferring vertical load through the top plate, steel tubes, adjustment mechanism, and base plate.
It must be installed according to an engineer-approved layout and must not be used beyond its confirmed capacity or outside its intended alignment.
| Item | Description |
|---|---|
| Product Type | Adjustable Steel Scaffolding Prop |
| Main Material | Steel |
| Adjustment Method | Screw adjustment with pin positioning |
| Top And Base Support | Steel top plate and base plate configurations |
| Finish And Colors | Painted or metallic finish options shown in the product images |
| Typical Applications | Construction support, formwork, slab support and temporary propping |
| Available Dimensions | Confirm required height range, tube size and plate configuration before order |
| Load Capacity | Confirm the tested capacity for the selected size and installation condition before use |
The main advantages include adjustable working height, practical screw leveling, reusable steel construction, several visible support-head configurations, and convenient bundled handling.
These characteristics make the scaffolding prop suitable for contractors, formwork teams, scaffolding rental companies, and construction-material distributors.
Before production or shipment, the supplier confirms dimensions, surface finish, color, plate style, packing method, quantity, and any project-specific inspection requirements. Technical communication and specification confirmation help reduce selection errors.
Production includes steel tube preparation, cutting, forming, welding, threading, plate assembly, surface finishing, inspection, and packing. Operators should inspect tubes, threads, pins, plates, and weld areas before use.
Keep the prop vertical, fully seated, and free from unstable gaps. Do not modify, overload, impact, or use a damaged prop. Remove the prop only after the supported structure has reached the required strength and an authorized professional has approved the sequence.
Quality control covers dimensions, weld integrity, adjustment operation, appearance, and packing condition.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
3000W-8000W
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Sichuan Xinshenghang Technology Co., Ltd Founded in 2010, we own 16+ years of professional experience in scaffolding R&D, automated production, domestic sales and worldwide export business. Our factory is equipped with CNC automatic welding production lines and hot-dip galvanizing treatment wo... Sichuan Xinshenghang Technology Co., Ltd Founded in 2010, we own 16+ years of professional experience in scaffolding R&D, automated production, domestic sales and worldwide export business. Our factory is equipped with CNC automatic welding production lines and hot-dip galvanizing treatment wo...
Get in touch with us
Leave a Message, we will call you back quickly!