 
                            
                            
                         
                        
 
                                    
| Payment Terms | L/C, T/T | 
| Supply Ability | 1200 Ton/Tons per Month | 
| Delivery Time | 15~30 | 
| Packaging Details | In bulk or steel pallet or as your request | 
| Material | Q235B steel or Q345 steel | 
| Standard | SGS,CE | 
| Surface Treatment | Galvanized or Painted | 
| Delivery time | About 10-20 days after confirmation | 
| Packing | In bulk or steel pallet or as your request | 
| Production capability | 40 tons per day | 
| Factory location | Tianjin, China | 
| Brand Name | LiangMing | 
| Model Number | LOCK FRAME | 
| Certification | CE,SGS | 
| Place of Origin | CHINA | 
View Detail Information
Explore similar products
 
                            Steel Scaffolding Staircase Galvanized Ladder Scaffold System
 
                            Hot Dip Galvanized Scaffolding Staircase Q235 Scaffolding Step Ladder
 
                            HDG Carbon Steel Scaffolding Staircase Q235 Scaffolding Steel Ladder With Hooks
 
                            Q235 Scaffolding Staircase Painting Hot Dip Galvanized Scaffolding Crawling
Product Specification
| Payment Terms | L/C, T/T | Supply Ability | 1200 Ton/Tons per Month | 
| Delivery Time | 15~30 | Packaging Details | In bulk or steel pallet or as your request | 
| Material | Q235B steel or Q345 steel | Standard | SGS,CE | 
| Surface Treatment | Galvanized or Painted | Delivery time | About 10-20 days after confirmation | 
| Packing | In bulk or steel pallet or as your request | Production capability | 40 tons per day | 
| Factory location | Tianjin, China | Brand Name | LiangMing | 
| Model Number | LOCK FRAME | Certification | CE,SGS | 
| Place of Origin | CHINA | ||
| High Light | ce scaffolding staircase ,sgs scaffolding staircase ,ce scaffolding step ladder | ||
Frame scaffolding
Frame scaffolding is one of the most widely used scaffolding frame scaffolding has a simple
disassembly,good bearing performance,safety and reliability.Typically manufactured from round tubing, the frame scaffolding is available. The typical method of constructing frame scaffolding is to use two sections of the scaffold frame connected by two crossed sections of support poles arranged in a square configuration. Pins rising out of the corner poles of a section of frame scaffolding fit into recesses in the bottom of the corner poles of the section being stacked onto the lower section. Pin clips are placed through the connection to prevent the sections from coming apart. Boards or aluminum deck planks are placed across the completed frame scaffolding sections. The Frame system is divided into H frame and walkthrough frame. Mainly composed of mainframe, cross brace, catwalk, and base jack.
Frame scaffolding main application:
1.For the top branch building,halls,bridages,viaducts,tunnels and other forwork support within
the top.
2.Inside and outside the row grid scaffolding of high-rise building.
3.For active work platform of electrical installation,hull built and other renovation works.
4.For temporary dormitory,warehouse or shed.
5.For the erection of temporary grandstands and bleachers.
Fast Lock Frame(1.625"OD)
Box Frame
|  | Item Code | Width | Height | 
| WFLF001 | 3'(914.4) | 6'7"(2006.6) | |
| WFLF002 | 5'(1524) | 6'7"(2006.6) | |
| WFLF003 | 4'2”(1066.8) | 6'7"(2006.6) | 
Mason Frame
|  | Item Code | Width | Height | 
| WFLF004 | 5'(1524) | 3'1"(939.8) | |
| WFLF005 | 5'(1524) | 4'1"(1244.6) | |
| WFLF006 | 5'(1524) | 5'1"(1549.4) | |
| WFLF007 | 5'(1524) | 6'7"(2006.6) | 
Ladder Frame
|  | Item Code | Width | Height | 
| WFLF008 | 275/8”(701.675) | 3'1"(939.8) | |
| WFLF009 | 275/8”(701.675) | 5'1"(1549.4) | |
| WFLF010 | 275/8”(701.675) | 6'7"(2006.6) | |
| WFLF011 | 3'(914.4) | 5'1"(1549.4) | |
| WFLF012 | 3'(914.4) | 6'7"(2006.6) | 
Snap On Lock Frame (1.625"OD)
Box Frame
|  | Item Code | Width | Height | 
| WSF01 | 3'(914.4) | 4'(1219.2) | |
| WSF02 | 3'(914.4) | 20"(508) | |
| wSF03 | 3'(914.4) | 40”(1016) | |
| WSF04 | 5'(1524) | 20"(508) | |
| WSF05 | 5'(1524) | 40"(1016) | 
Mason Frame
|  | Item Code | Width | Height | 
| WSF06 | 5'(1524) | 4'(1219.2) | |
| WSF07 | 5'(1524) | 5'(1524) | |
| WSF08 | 5'(1524) | 6'8"(2032) | 
Ladder Frame
|  | Item Code | Width | Height | 
| WSF09 | 2'(609.6) | 5'(1524) | |
| WSF010 | 2'(609.6) | 6'8"(2032) | |
| WSF011 | 3'(914.4) | 6'8"(2032) | |
| WSF012 | 3'(914.4) | 5'(1524) | 
Flip Lock Frame (1.625"OD)
Box Frame
|  | Item Code | Width | Height | 
| WFF01 | 3'(914.4) | 5'1''(1549.4) | |
| WFF02 | 3'(914.4) | 6'7''(2006.6) | |
| WFF03 | 5'(1524) | 6'7''(2006.6) | 
Mason Frame
|  | Item Code | Width | Height | 
| WFF04 | 5'(1524) | 2'1"(635) | |
| WFF05 | 5'(1524) | 3'1"(939.8) | |
| WFF06 | 5'(1524) | 4'1"(1244.6) | |
| WFF07 | 5'(1524) | 5'1"(1549.4) | |
| WFF08 | 5'(1524) | 6'7''(2006.6) | 
Ladder Frame
|  | Item Code | Width | Height | 
| WFF09 | 3'(914.4) | 3'1"(939.8) | |
| WFF010 | 3'(914.4) | 4'1"(1244.6) | |
| WFF011 | 3'(914.4) | 5'1"(1549.4) | |
| WFF012 | 3'(914.4) | 6'7''(2006.6) | |
| WFF013 | 29"(736.6) | 5'(1524) | |
| WFF014 | 29"(736.6) | 6'7''(2006.6) | 
Drop Lock Frame (1.625"OD)
Box Frame
|  | Item Code | Width | Height | 
| WDF01 | 3'(914.4) | 5'(1524) | |
| WDF02 | 3'(914.4) | 6'4''(1930.4) | |
| WDF03 | 42"(1066.8) | 6'4''(1930.4) | |
| WDF04 | 5'(1524) | 6'4''(1930.4) | 
Mason Frame
|  | Item Code | Width | Height | 
| WDF05 | 5'(1524) | 3' (914.4) | |
| WDF06 | 5'(1524) | 4' (1930.4) | |
| WDF07 | 5'(1524) | 5' (1524) | |
| WDF08 | 5'(1524) | 6'4'' (1930.4) | 
Ladder Frame
|  | Item Code | Width | Height | 
| WDF09 | 2'(609.6) | 3' (914.4) | |
| WDF010 | 2'(609.6) | 5'(1524) | |
| WDF011 | 2'(609.6) | 6'4'' (1930.4) | 
Production and process


Factory and warehouse



Project and product use


Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller 
Year Established:
2009 
Total Annual:
10000000-50000000
Employee Number:
100~200 
Ecer Certification:
Site Member 
HUNAN LIANGMING METAL MATERIAL CO.,LTD was founded in 2009,which is a professional manufacturer and exporter of scaffolding material,steel pipes and pipe fittings.Its headquarter located in Changsha city,Hunan province and production base located in Daqiuzhuang town,Jinghai District,Tianjin. Our ... HUNAN LIANGMING METAL MATERIAL CO.,LTD was founded in 2009,which is a professional manufacturer and exporter of scaffolding material,steel pipes and pipe fittings.Its headquarter located in Changsha city,Hunan province and production base located in Daqiuzhuang town,Jinghai District,Tianjin. Our ...
Get in touch with us
Leave a Message, we will call you back quickly!