| Payment Terms | D/A, L/C, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 100TON |
| Delivery Time | 30-40days |
| Packaging Details | in bulk |
| Name | Customized Mining Machinery Parts For Underground Excavation |
| Brand Name | XC |
| Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
| Payment Terms | D/A, L/C, D/P, T/T, Western Union, MoneyGram | Supply Ability | 100TON |
| Delivery Time | 30-40days | Packaging Details | in bulk |
| Name | Customized Mining Machinery Parts For Underground Excavation | Brand Name | XC |
| Place of Origin | China | ||
| High Light | Customized Mining Machinery Parts ,Underground Excavation Mining Machinery Parts ,Customized Mining Machine Parts | ||
The "Absolute Advance" is a key measurement parameter in engineering and mining, representing the total distance advanced in tunneling, drilling, or excavation. Below are its key applications and technical aspects.
Absolute Advance (AA) = Total linear distance progressed in a given direction (e.g., tunnel boring, mining face advance, or drilling depth).
Measured in meters (m) or feet (ft).
Unlike relative displacement, AA is a cumulative value from a fixed reference point.
TBM (Tunnel Boring Machine) Progress Tracking
Records daily/weekly advance rates.
Used for project scheduling and delay analysis.
Support Installation Benchmarking
Determines when to install rock bolts, linings, or shotcrete.
Safety Monitoring
Correlates with convergence measurements to detect ground instability.
Longwall & Drift Mining
Tracks face advance for resource extraction planning.
Stability Assessment
Excessive advance rates may trigger roof collapse risks.
Core Drilling Depth Control
Ensures accurate sampling at target depths.
Directional Drilling Navigation
Used in oil/gas wells and geothermal projects.
Pipeline & Microtunneling
Monitors jacking force vs. advance distance.
Subway & Rail Tunnels
Integrates with GIS & BIM for digital twins.
1. High-Precision Monitoring
Real-time tracking of advance rate (m/day, m/shift) with ±1cm accuracy.
Integrated with LIDAR/Tachymetry for automated progress mapping.
2. Efficiency Optimization
AI-driven analytics to predict optimal advance speeds based on geology.
Reduces idle time by 15-30% through dynamic scheduling.
3. Safety Enhancement
Alerts for overbreak/underbreak risks during excavation.
Syncs with ground deformation sensors to prevent collapses.
4. Multi-Industry Adaptability
Compatible with:
✅ TBM tunneling (EPB/Slurry shields)
✅ Drill & blast mining (round length control)
✅ Directional drilling (oil/gas, geothermal)
5. Data Integration
Exports to BIM/GIS (e.g., Autodesk, Bentley)
API support for IoT platforms (e.g., Predix, MindSphere)
6. Regulatory Compliance
Meets ISO 22475-1 (geotechnical monitoring) & ITACET tunneling standards.
Typical ROI: 6-18 months via reduced downtime + improved resource allocation.
Need a customized solution for your project? Let’s discuss!
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1996
Total Annual:
50000000-80000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Founded in Jiaxing, Zhejiang Province—one of China’s central manufacturing hubs for mechanical hardware—Jiaxing Xinchuang Hardware Co., Ltd. is a professional manufacturer and exporter specializing in high-strength standard and non-standard fasteners, automotive hardware, and custo... Founded in Jiaxing, Zhejiang Province—one of China’s central manufacturing hubs for mechanical hardware—Jiaxing Xinchuang Hardware Co., Ltd. is a professional manufacturer and exporter specializing in high-strength standard and non-standard fasteners, automotive hardware, and custo...
Get in touch with us
Leave a Message, we will call you back quickly!