China factories

Chat Now Send Email
China factory - Weifang Shihua Chemical Building Material Co., Ltd.

Weifang Shihua Chemical Building Material Co., Ltd.

  • China ,Shandong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt
China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt

  1. China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt
  2. China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt
  3. China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt
  4. China Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt

Creep Type Self Healing Bituminous Waterproof Coating Non Curing Rubber Asphalt

  1. MOQ: 1 metric ton
  2. Price: 737.7 US dollars per metric ton
  3. Get Latest Price
Composite Waterproof System ≥1.5mm,≥3mm (including membrane)
Packaging Details in drums
Node Treatment Comply with design requirements, lap joints sealed tightly,Visual inspection
Payment Terms T/T
Standalone Waterproof Layer ≥2mm,Approximately 2.6~2.8kg/㎡
Thickness Deviation Not exceeding -10% of design value,Needle method or sectioning method
Waterproof Effect No leakage after 24-hour water storage test or 2-hour water spray test,Water storage/spray test
Supply Ability 10000 metric ton
Adhesion Quality 100% full adhesion, no hollowing, peeling, or wrinkling,Visual inspection + tapping check
Model Number Non-curing rubber asphalt leak-proof coating
Brand Name shhous
Place of Origin China Waterproof Industrial Park
Certification ISO

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Composite Waterproof System ≥1.5mm,≥3mm (including membrane) Packaging Details in drums
Node Treatment Comply with design requirements, lap joints sealed tightly,Visual inspection Payment Terms T/T
Standalone Waterproof Layer ≥2mm,Approximately 2.6~2.8kg/㎡ Thickness Deviation Not exceeding -10% of design value,Needle method or sectioning method
Waterproof Effect No leakage after 24-hour water storage test or 2-hour water spray test,Water storage/spray test Supply Ability 10000 metric ton
Adhesion Quality 100% full adhesion, no hollowing, peeling, or wrinkling,Visual inspection + tapping check Model Number Non-curing rubber asphalt leak-proof coating
Brand Name shhous Place of Origin China Waterproof Industrial Park
Certification ISO
High Light rubber asphalt waterproof coating ,self healing bituminous waterproof coating ,bituminous waterproof coating non curing

Creep-type Self-healing Non-curing Rubber Asphalt Waterproof Coating

Product Overview

Non-curing rubber asphalt waterproof coating is an innovative creep-modified waterproof material formulated with high-quality petroleum asphalt as the base, reinforced by rubber powder, functional polymer modifiers, and proprietary additives via precision production processes.

Its defining feature is permanent viscoelastic paste state throughout its service life, eliminating curing-induced cracking and performance degradation common in traditional waterproof materials. As the industry-leading waterproofing solution, it can be applied as a standalone coating or combined with SBS/self-adhesive waterproof membranes to form a monolithic "skin-like" waterproof system, meeting the stringent requirements of National Class I Waterproof Grade.

Construction Advantages of Non-curing Rubber Asphalt Waterproof Coating

I. Construction Efficiency Advantages

1. Simplified processes, construction period shortened by over 30%

  • No need for substrate drying treatment, construction can be carried out as long as there is no standing water, eliminating the waiting period (usually 7~14 days) required for traditional waterproof materials to meet substrate moisture content standards
  • No curing required after coating application, waterproof membrane laying can be completed within 3 minutes. Composite system construction can be finished in a single day, reducing the construction period by at least 50% compared with the traditional SBS membrane + cold primer process
  • Mechanical spraying construction efficiency reaches 10001500 ㎡/day, 34 times that of traditional membrane construction, with particularly significant advantages for large-area projects

2. Strong scenario adaptability

  • Can be directly applied on damp and uneven substrates, eliminating the need for large-scale substrate leveling treatment and reducing base treatment costs
  • Detailed nodes such as internal and external corners, pipe roots, and deformation joints can be directly formed by scraping, no additional membrane cutting is required, reducing construction difficulty
  • Normal construction can be carried out in winter, and operation can be performed without special insulation measures in environments above -5℃, extending the annual construction cycle

II. Construction Quality Advantages

1. Eliminates water migration risk from the source

  • 100% full adhesion to the substrate, forming a "skin-like" waterproof structure, completely blocking the water channeling passage under the waterproof layer, solving the water migration problem caused by traditional membrane loose laying and point bonding
  • The coating automatically fills micro-cracks in the substrate, even if the substrate cracks 0.5~2mm, it will not affect the waterproof integrity
  • The membrane overlap joints can be filled with non-curing coating, with bonding strength more than twice that of traditional hot-melt lap joints, no leakage risk at lap joints

2. High construction fault tolerance

  • Insufficient local construction thickness can be supplemented at any time, no need for rework
  • Coating damage during construction can be automatically repaired without affecting the overall waterproof effect
  • Operation can be performed without professionally certified workers, manual scraping is simple and easy to learn, reducing the technical requirements for construction personnel

III. Construction Cost Advantages

1. Reduced direct costs

  • No need to apply cold primer, eliminating the cost of base treatment agent
  • Can be directly applied on the old waterproof layer, no need to remove the original waterproof base, reducing demolition costs by more than 80%
  • Material loss rate ≤5%, much lower than the 10%~15% loss rate of traditional membranes

2. Long-term cost advantages

  • Stable construction quality, post-maintenance rate is reduced by more than 70% compared with traditional waterproof systems
  • Leakage maintenance does not require large-scale demolition, only grouting for leakage points is needed for repair, reducing maintenance costs by 60%
  • Service life can reach more than 30 years, and the full life cycle cost is only 1/2 of that of traditional waterproof systems

IV. Construction Safety Advantages

  • Solvent-free, no volatile toxic gases, no gas mask required during construction, meeting green construction requirements
  • Non-flammable material, no fire risk during heating construction, can be safely constructed in confined spaces (such as basements, tunnels)
  • No open fire operation during construction, avoiding fire hazards of traditional SBS membrane hot-melt construction
  • Construction Technical Specification Requirements for Non-curing Rubber Asphalt Waterproof Coating

    I. Substrate Treatment Requirements

  • Inspection Item Technical Requirements Test Method/Description
    Substrate Condition Solid, flat, and clean No floating slurry, oil stains, or sharp objects
    Moisture Content ≤9% Plastic film coverage method: no condensation water within 24 hours
    Crack Treatment Cracks ≥0.3mm width require filling Fill and compact using polymer mortar
  • II. Construction Parameter Requirement

  • Construction Item Technical Parameters Precautions
    Heating Temperature (Scraping) ≥120℃ Open flame direct heating is prohibited
    Heating Temperature (Spraying) 140~175℃ Open flame direct heating is prohibited
    Membrane Laying Timing Complete within 3 minutes after coating Avoid surface skinning affecting adhesion
    Membrane Lap Width ≥100mm Ensure lap joint quality
    Roller Compaction 50kg+ pressure roller, roll 2~3 times Ensure tight adhesion at lap joints
    Construction Ambient Temperature ≥-5℃ Build insulation shed in low-temperature environments

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2000

  • Total Annual:

    17790000-17790000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Weifang Shihua Chemical Building Materials Co., Ltd. Founded in 1994, the company has a registered capital of RMB 100.86 million and covers a plant area of over 30,000 square meters. It mainly manufactures more than 100 types of products across five major series, including Shihua‑brand po... Weifang Shihua Chemical Building Materials Co., Ltd. Founded in 1994, the company has a registered capital of RMB 100.86 million and covers a plant area of over 30,000 square meters. It mainly manufactures more than 100 types of products across five major series, including Shihua‑brand po...

+ Read More

Get in touch with us

  • Reach Us
  • Weifang Shihua Chemical Building Material Co., Ltd.
  • Shouguang City, Shandong Province, China
  • https://www.shhous.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement