| Supply Ability | 1000000kg per Month |
| Application Method | Brush, roller and trowel application available |
| Product Feature | Combined rigid-flexible waterproof performance |
| Water Impermeability | Waterproof at 0.3 MPa for 30 min |
| Packaging Details | Pails+Bags |
| Construction Substrate | Applicable on damp substrate without standing water |
| Product Composition | Two-component, liquid component + powder component |
| Film Characteristic | Forms flexible waterproof film after curing |
| Solid Content | ≥70% |
| Low-temperature Flexibility | TypeⅠ no crack at -10℃ |
| Brand Name | shhous |
| Certification | ISO |
| Place of Origin | Shandong, China |
| Model Number | Type I ,Type II ,Type III |
View Detail Information
Explore similar products
JS Polymer Cement Waterproof Coating Liquid For Indoor Projects
Polymer Modified Cement Waterproofing Coating For Bathroom Kitchen Balcony
Non Toxic And Odor Safe Polymer Modified Cement Waterproofing Water Based
Oem Odm Js Polymer Cement Based Waterproof Coating -10°C No Cracks
Product Specification
| Supply Ability | 1000000kg per Month | Application Method | Brush, roller and trowel application available |
| Product Feature | Combined rigid-flexible waterproof performance | Water Impermeability | Waterproof at 0.3 MPa for 30 min |
| Packaging Details | Pails+Bags | Construction Substrate | Applicable on damp substrate without standing water |
| Product Composition | Two-component, liquid component + powder component | Film Characteristic | Forms flexible waterproof film after curing |
| Solid Content | ≥70% | Low-temperature Flexibility | TypeⅠ no crack at -10℃ |
| Brand Name | shhous | Certification | ISO |
| Place of Origin | Shandong, China | Model Number | Type I ,Type II ,Type III |
| High Light | composite polymer modified cement waterproofing ,composite acrylic modified cementitious waterproofing ,flexible rigid polymer modified cement waterproofing | ||
Flexible Rigid Composite Js Waterproof Coating
Substrate Preparation
The substrate shall be sound, flat and clean. Remove laitance, dust, oil stains and loose layers. Repair holes and cracks in advance. Fully wet the substrate before construction, keep it damp without standing water. Clean and polish vulnerable details such as corners, pipe penetrations and construction joints.
Two‑component Mixing
Follow the mixing ratio strictly. Add liquid component first, then powder component. Electrically stir for 2‑3 minutes until smooth lump‑free slurry is obtained. Mix on‑demand and use within pot life. Do not re‑mix expired slurry by adding extra water.
Detail Reinforcement
Apply a thin coat of JS slurry on leakage‑prone areas such as pipe roots, wall‑penetrating pipes, corners, construction joints and post‑pouring belts. Lay non‑woven or glass‑fiber fabric for positions with large deformation. Proceed to large‑area construction after reinforcement layer is fully dried.
Multi‑coat Large‑area Application
Apply 2‑3 cross‑direction coats by brush, roller or trowel. Apply next coat only when previous coat is dry and non‑sticky. Apply successive coats in perpendicular directions. Strictly control total film thickness, ensure uniform coating without missing or accumulation.
Curing & Curing Period
Suitable construction temperature: 5‑35℃. Stop construction in rainy, snowy and windy conditions. Conduct natural curing after surface drying. Prevent rain wash and direct strong sunlight. Keep good ventilation for full cross‑linking and curing.
Finished‑product Protection & Subsequent Work
Avoid foot traffic, impact and water immersion during curing period. After the coating achieves full performance, plastering, mortar leveling, tile laying and backfilling can be carried out directly without extra interface treatment.
| NO. | Precautions |
| 1 | Construction temperature shall be 5‑35℃. Outdoor construction is prohibited under rainy, snowy, foggy and windy conditions. |
| 2 | Substrate shall be sound and flat. Damp substrate is acceptable, but standing water is strictly forbidden. |
| 3 | Strictly follow liquid‑powder mixing ratio. Do not change ratio arbitrarily, and avoid adding extra water to dilute slurry. |
| 4 | Prepare slurry for immediate use. Finish application within pot life. Do not reuse expired slurry by adding water. |
| 5 | Apply multiple thin coats. The next coat can only be applied after previous coat is dry and non‑sticky. |
| 6 | Reinforcement treatment shall be done for vulnerable parts: corners, pipe roots and construction joints. |
| 7 | Reinforcing non‑woven fabric or glass‑fiber mat is recommended for areas with large structural deformation. |
| 8 | Type I product cannot bear long‑term direct UV exposure. Protective layer is mandatory for exposed application. |
| 9 | Avoid rain scouring, strong sunlight exposure, impact and foot traffic during construction and curing. |
| 10 | Do not carry out water immersion, backfilling or tiling before full curing of waterproof film. |
| 11 | Clean mixing and application tools timely to prevent slurry hardening on equipment. |
| 12 | Protect liquid component from freezing and powder component from moisture. Use within shelf‑life. |
![]()
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2000
Total Annual:
17790000-17790000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Weifang Shihua Chemical Building Materials Co., Ltd. Founded in 1994, the company has a registered capital of RMB 100.86 million and covers a plant area of over 30,000 square meters. It mainly manufactures more than 100 types of products across five major series, including Shihua‑brand po... Weifang Shihua Chemical Building Materials Co., Ltd. Founded in 1994, the company has a registered capital of RMB 100.86 million and covers a plant area of over 30,000 square meters. It mainly manufactures more than 100 types of products across five major series, including Shihua‑brand po...
Get in touch with us
Leave a Message, we will call you back quickly!