Payment Terms | L/C, T/T |
Supply Ability | 10000 tons per month |
Delivery Time | 30 days |
Packaging Details | Gunny bags or cartons and wooden pallet |
Brand Name | Gnee Rail |
Model Number | CJWK Rail Clamp |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Excellent Clamping Force with E2055 Clip for Railway Fastening
Rail Fasteners for Railway Reconstruction E-type Clip
UIC54 Rail Tie Plate with QT500 Carben Steel
Railway Track Stability Rail Fasteners with Elastic Rail Clips for Secure Fixing
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 tons per month |
Delivery Time | 30 days | Packaging Details | Gunny bags or cartons and wooden pallet |
Brand Name | Gnee Rail | Model Number | CJWK Rail Clamp |
Certification | ISO | Place of Origin | China |
Product Features
1. The base plate is welded to the upper wing edge plate of the steel crane beam by two-sided side welding, which can ensure that the lateral force of the crane is transmitted to the crane beam smoothly and evenly, and avoid the defect of a large number of holes in the wing plate on the crane beam.
2. The base plate and the upper buckle plate are connected by a ball joint. Therefore, under the action of lateral force, deflection is allowed. It can reduce the harm of the lateral impact of the crane to the track, crane beam and braking system and other structures.
3. The base plate is welded to the bottom edge of the track about 1m/m, which plays a good role in limiting the left and right displacement of the track.
4. Special bolts make the force more reasonable and make the upper cover plate free to disassemble and assemble, providing extremely convenient conditions for construction, installation and maintenance.
5. The CGWK rail clamp is small in size, light in weight, strong in force, economical and beautiful.
Installation requirements
(1): Before installation, the track should be straightened according to the design requirements.
(2): Positioning the base plate. Arrange the base with a spacing of 500mm along the direction of the crane track, and position the center of the bolt in the vertical direction at the track center value (table). Or position the front edge of the base plate 1m/m away from the bottom edge of the track.
(3): Weld the base plate. 6mm fillet welds on both sides.
(4): Assemble the fasteners in the following order:
Bolt in place - upper cover - flat washer - spring washer - nut - tighten.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2008
Total Annual:
3000000-3500000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu... Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu...
Get in touch with us
Leave a Message, we will call you back quickly!