| Test | Prototype Test, Break Load Test, Safe Working Load Test, Operation Test |
| Operation System | Manual Release |
| Payment Terms | T/T, L/C |
| Usage | Mooring and Towing |
| Supply Ability | Customized production based on project requirements |
| Application | Harbor, Dry Dock, Floating Dock, Engineering Vessel, Tug Boat |
| Material | Mild Steel, C-Mn Steel |
| Surface treatment | sandblasting to S2.5 + one layer of epoxy shop primer |
| Classification Certificates | CCS, NK, BV, ABS, DNV, LR, KR, RINA, IRS, RS, Etc |
| Safe Working Load | 30 to 100ton |
| Packaging Details | Export standard pallet or customized packing |
| Delivery Time | Based on project requirements |
| Brand Name | Zhongyuan Marine Equipmen |
| Model Number | Standard or Customized |
| Certification | CCS, NK, BV, ABS, DNV, LR, KR, IRS, RS, RINA, CRS, Makers Test Certificate |
| Place of Origin | China |
View Detail Information
Explore similar products
Bulwark Mounted Panama Chock | DIN 81915 Form A Cast Steel Rope Guide for Ship
DIN 81915 Type D Deck Mounted Cast Steel Horn Chock | Ship Mooring and Towing
Deck-Mounted Cast Steel Mooring Chock | DIN 81915 Type C, SWL 10 to 320 kN
Marine Guide Roller for Towing Rope, Wire Rope and Chain Guidance
Product Specification
| Test | Prototype Test, Break Load Test, Safe Working Load Test, Operation Test | Operation System | Manual Release |
| Payment Terms | T/T, L/C | Usage | Mooring and Towing |
| Supply Ability | Customized production based on project requirements | Application | Harbor, Dry Dock, Floating Dock, Engineering Vessel, Tug Boat |
| Material | Mild Steel, C-Mn Steel | Surface treatment | sandblasting to S2.5 + one layer of epoxy shop primer |
| Classification Certificates | CCS, NK, BV, ABS, DNV, LR, KR, RINA, IRS, RS, Etc | Safe Working Load | 30 to 100ton |
| Packaging Details | Export standard pallet or customized packing | Delivery Time | Based on project requirements |
| Brand Name | Zhongyuan Marine Equipmen | Model Number | Standard or Customized |
| Certification | CCS, NK, BV, ABS, DNV, LR, KR, IRS, RS, RINA, CRS, Makers Test Certificate | Place of Origin | China |
| High Light | Marine quick release towing hook ,100t quick release towing hook ,100t boat towing equipment hook | ||
30–100T Marine Quick Release Towing Hook | Manual Release for Tugboats and Work Vessels
Product Overview
The marine quick release towing hook is a vessel-mounted towline connection device for tugboats, workboats, engineering vessels, floating docks, and other marine units that require a controlled towline release point. The hook retains the towline eye during towing and is released locally through the manual release arrangement specified for this product page.
The hook assembly transfers towing force through the hook body, pivot connection, locking mechanism, mounting base, and supporting vessel structure. Selection therefore requires confirmation of SWL, towline arrangement, expected lead angle, foundation design, release method, inspection scope, and class requirement. This product is a towing hook, not a lifting hook, not a towing winch, and not a dock-mounted multiple quick release mooring hook.
Quick Specifications
Main Technical Parameters
| SWL(t) | A(mm) | B(mm) | L(mm) | R1(mm) | R2 |
| 30 | 210 | 340 | 1050 | 65 | 430 |
| 40 | 220 | 345 | 1100 | 65 | 450 |
| 50 | 276 | 448 | 1332 | 80 | 577 |
| 60 | 295 | 475 | 1415 | 85 | 613 |
| 80 | 350 | 560 | 1680 | 100 | 721 |
| 100 | 450 | 630 | 2100 | 125 | 921 |
Selection & Inquiry Guide
Step 1: Confirm the required SWL according to the vessel towing plan, tug bollard pull, towline MBL, expected dynamic loading, and naval architect or class calculation. Do not select the hook by vessel deadweight alone.
Step 2: Confirm towline eye or shackle size, hook throat requirement, towing lead direction, expected horizontal and vertical angles, and whether side loading may occur.
Step 3: Confirm the installation position, available deck space, foundation arrangement, structural reinforcement, connection method, and load transfer into the vessel structure.
Step 4: Confirm the release arrangement. This page covers local manual release; pneumatic or hydraulic remote release requires a separate approved configuration and control-system scope.
Step 5: Confirm material grades, corrosion-protection system, lubrication and maintenance access, NDT requirement, test procedure, witnessing, and certificate scope before quotation.
Step 6: Provide selected SWL, quantity, vessel type, installation drawing, towline information, class society, destination, and required delivery time.
Structure
Towing hook body | Hook pivot connection | Locking and release mechanism | Local manual release lever / wire interface | Mounting base | Vessel foundation interface | Protective coating
Towing, Release and Installation Advantages
Custom Attributes
How It Works
Towline eye is placed on the hook → Locking mechanism retains the hook in the towing position → Towing load passes through the hook and mounting structure → Operator actuates the approved manual release → Hook opens and releases the towline → Mechanism is inspected and reset
Applications
Harbor tugboats | Coastal and river tugs | Workboats | Engineering vessels | Floating docks | Dry-dock service craft | Marine construction support vessels | Replacement towing-hook projects
Certifications & Advantages
Certificates and survey attendance can be arranged according to project requirement, approved test scope, material traceability, and classification society procedure. Availability is subject to technical review and class approval.
Certification: CCS, NK, BV, ABS, DNV, LR, KR, IRS, RS, RINA, CRS, Makers Test Certificate.
Drawing & Photos
![]()
![]()
FAQ
Q1: How should the correct towing hook SWL be selected?
A1: Selection should consider the vessel towing plan, tug bollard pull, towline MBL, dynamic loading, tow angle, connection geometry, and class or naval architect requirements. The hook SWL should not be selected from vessel deadweight alone.
Q2: Can this hook be released while the towline is loaded?
A2: The supplied description states release under slack or safe working load conditions, but the permitted release load must be confirmed for the exact model through the approved design, operating instructions, and witnessed test procedure. It should not be treated as an unrestricted under-load release claim.
Q3: What installation information is required before production?
A3: Provide the vessel foundation drawing, installation position, load direction and allowable angles, towline or shackle details, selected SWL, release-wire arrangement, material and coating requirements, class society, and required inspection scope.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Seller
Year Established:
1990
Total Annual:
10,000,000-15,000,000
Employee Number:
>300
Ecer Certification:
Verified Supplier
Zhongyuan Ship Machinery Manufacture (Group) Co., Ltd. was founded in the 1990s and has developed into an integrated marine equipment manufacturer and project supply partner combining manufacturing, technical support, and export services. The group consists of four factories and one export trading c... Zhongyuan Ship Machinery Manufacture (Group) Co., Ltd. was founded in the 1990s and has developed into an integrated marine equipment manufacturer and project supply partner combining manufacturing, technical support, and export services. The group consists of four factories and one export trading c...
Get in touch with us
Leave a Message, we will call you back quickly!