| Payment Terms | T/T |
| Heating Element | Graphite |
| Delivery Time | 4-6 Months |
| Batch Loading Capacity | 1000 kg (Scrap alloy) |
| Packaging Details | Wooden Case |
| Partial Pressure Gas | Nitrogen |
| Supply Ability | 5 Months/Set |
| Power Rating | 400KVA |
| Model Number | Z1000 |
| Certification | CE/ISO |
| Brand Name | RUIDEER |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
A Horizontal Zinc Melting Furnace That Conforms To Standard Design
The complete machine adopts modular design, easy for disassembly, assembly and
High Efficiency Vacuum Bell Zinc Melting Furnace for Tungsten Carbide Recycling
Pressure Rise Rate 3Pa per Hour Zinc Melting Furnace Zinc Penetration Rate Less
Product Specification
| Payment Terms | T/T | Heating Element | Graphite |
| Delivery Time | 4-6 Months | Batch Loading Capacity | 1000 kg (Scrap alloy) |
| Packaging Details | Wooden Case | Partial Pressure Gas | Nitrogen |
| Supply Ability | 5 Months/Set | Power Rating | 400KVA |
| Model Number | Z1000 | Certification | CE/ISO |
| Brand Name | RUIDEER | Place of Origin | CHINA |
It is used for reclaiming WC cemented carbide via the zinc process. Designed as a twin-chamber horizontal vacuum furnace, the front chamber serves as the heating zone, which accommodates graphite crucibles containing the alloy and zinc.Once the zinc melts, the cemented carbide scrap is submerged for thermal modification. The rear chamber acts as the cooling chamber, housing the zinc recovery crucible. The graphite crucibles in the heating chamber and the cooling chamber are connected via a graphite conduit. Once the molten zinc in the heating chamber vaporizes, it is transported through the graphite conduit to the cooling chamber where it condenses, thereby achieving the recovery and recycling of zinc. A water-cooling plate is used to cool the zinc recovery crucible, accelerating the cooling rate and improving production efficiency.
|
Max. Working Temperature
|
1050℃
|
|
Leakage rate
|
3 Pa/h (Tested after bakeout and ultimate vacuum measurement; stop the pump unit and start the test after 30 minutes. Average value within 3 hours under empty, clean, and cold furnace conditions)
|
|
Zinc Residue
|
Under the rated loading condition of 1 ton of zinc, the zinc residue is ≤ 20 ppm, provided that the cleaning and sorting processes of the alloy are carried out with thorough inspection and quality control.
|
|
Cooling Time
|
10-12 h (Cooling time from 950°C down to 100°C. Water
temperature ≤26°C, 2 bar ≤ water pressure ≤ 3 bar, water flow
rate 30-40 m³/h)
|
Company Details
Year Established:
2011
Total Annual:
15 Million-19 Million
Employee Number:
180~220
Ecer Certification:
Verified Supplier
Zhuzhou Ruideer Intelligent Thermal Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating f... Zhuzhou Ruideer Intelligent Thermal Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating f...
Get in touch with us
Leave a Message, we will call you back quickly!