China factories

China factory - HORIZON FORMWORK CO., LTD.

HORIZON FORMWORK CO., LTD.

  • China,Xingtai ,Hebei
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China High Tower Climbing Formwork System by Crane In Wall Formwork Construction
China High Tower Climbing Formwork System by Crane In Wall Formwork Construction

  1. China High Tower Climbing Formwork System by Crane In Wall Formwork Construction
  2. China High Tower Climbing Formwork System by Crane In Wall Formwork Construction

High Tower Climbing Formwork System by Crane In Wall Formwork Construction

  1. MOQ: 50 sets
  2. Price: Pls ask HORIZON
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 100 tons per week
Delivery Time 20-25 days
Packaging Details pallets, bundles, bulk
Material H20 beam, steel waling, climbing bracket
OEM Available
Colour yellow & blue
Brand Name HORIZON
Model Number HORIZON CLIMBING SYSTEM
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 100 tons per week
Delivery Time 20-25 days Packaging Details pallets, bundles, bulk
Material H20 beam, steel waling, climbing bracket OEM Available
Colour yellow & blue Brand Name HORIZON
Model Number HORIZON CLIMBING SYSTEM Place of Origin CHINA
High Light climbing scaffolding systemself climbing scaffold system

Climbing Formwork System by Crane In Wall Formwork Construction For High Towers

 

Climbing Formwork CB240 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

Advantages:
Platform width:      2.4m
Roll-back system:  70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system:     should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork:            can be moved horizontally, vertically and tilted to meet site requirement.
Main platform:       provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.

1. Climbing bracket

 

2. Main platform

 

3. Pouring platform

 

4. Finishing platform

 

5. Roll-back system

 

6. Push-pull prop

 

7. Vertical waling

 

8. Anchor system

 

9. Formwork

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2006

  • Total Annual:

    10000000-15000000

  • Ecer Certification:

    Site Member

       As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...        As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...

+ Read More

Get in touch with us

  • Reach Us
  • HORIZON FORMWORK CO., LTD.
  • VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA
  • MrH. Chang
  • +86 319 3188757
  • https://www.slabformworksystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement