China factories

China factory - HORIZON FORMWORK CO., LTD.

HORIZON FORMWORK CO., LTD.

  • China,Xingtai ,Hebei
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Cast Iron Cam Clamps 43x105mm Concrete Forming Accessories For Locking and
China Cast Iron Cam Clamps 43x105mm Concrete Forming Accessories For Locking and

  1. China Cast Iron Cam Clamps 43x105mm Concrete Forming Accessories For Locking and
  2. China Cast Iron Cam Clamps 43x105mm Concrete Forming Accessories For Locking and

Cast Iron Cam Clamps 43x105mm Concrete Forming Accessories For Locking and

  1. MOQ: 5000 pcs
  2. Price: Pls ask HORIZON
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 100000 pcs per month
Delivery Time 15-25 days
Packaging Details bags on pallets
Material Casted
OEM Available
finishing galvanized, painting
Size 43x105mm
Application Locking formwork
Samples available
Release by hammer blow
Brand Name HORIZON
Model Number Cam clamp
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 100000 pcs per month
Delivery Time 15-25 days Packaging Details bags on pallets
Material Casted OEM Available
finishing galvanized, painting Size 43x105mm
Application Locking formwork Samples available
Release by hammer blow Brand Name HORIZON
Model Number Cam clamp Place of Origin CHINA
High Light construction formwork accessoriesconcrete wall form accessories

Cast Iron Cam Clamp 43x105mm for Locking and Securing Formwork

 

Cast iron Cam clamps are very simple to use.

Step 1: After setting up the wooden or steel formwork, pass tie rods through the walls to the formwork at intervals.

 

Steop 2: A cam clamp is attached to one end of the rod and fixed with a light hammer blow on the head of the wedge.

 

Step 3: Another cam clamp is applied to the other end of the rod and locked in position like the first, after the rod has been tensioned using the appropriate rapid tensioner.

 

Step 4: When the operation is completed, the tensioner is removed and the process is continued with the next pair of clamps.

 

Dismantling the formwork is quicker than ever.

Simply hit the bottom of the clamp wedge with a hammer, the cam clamp is immediately released and is ready for use over and over again.

Bar Ø (mm) Plate size (mm) Weight (Kg)
4-10 43 x 105 0.44

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2006

  • Total Annual:

    10000000-15000000

  • Ecer Certification:

    Site Member

       As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...        As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...

+ Read More

Get in touch with us

  • Reach Us
  • HORIZON FORMWORK CO., LTD.
  • HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
  • https://www.slabformworksystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement