Delivery Time | 30 working days |
Packaging Details | Plywood case exporting standard |
Product name | Multifunctional Milk Processing line |
Power consumption(Kw) | about 100-500kw, |
perator needed | About 4-18persons |
Cooling water consumption | About 60-500M3 |
Steam consumption | About 200-4000T/H, |
Factory space needed | About 400-6000Sqm |
Place of Origin | china |
View Detail Information
Explore similar products
Small Dairy UHT Milk Plant Milk Production Line With Aseptic Pouch Package
Complete Liquid UHT Milk Making Machine , Dairy Milk Processing Machinery
Ultra High Temperature Automatic Milk Production Line Safety For Milk Powder
Mini Dairy UHT Milk Production Line , Automatic Tube UHT Sterilizer 1-50 T/D
Product Specification
Delivery Time | 30 working days | Packaging Details | Plywood case exporting standard |
Product name | Multifunctional Milk Processing line | Power consumption(Kw) | about 100-500kw, |
perator needed | About 4-18persons | Cooling water consumption | About 60-500M3 |
Steam consumption | About 200-4000T/H, | Factory space needed | About 400-6000Sqm |
Place of Origin | china | ||
High Light | milk processing equipment ,milk products processing plant |
SUS304 / SUS316 Small Scale Milk Processing Equipment Saving Labor Force
Features and advantages:
1. Processing capacity can be ranged from 2T/Day to 1000T/Day.
2. High standard design, manufacture and project installation requirements, which guarantee the first-class finish products in the dairy processing line.
3. PLC control the whole production line, saving labor force and facilitate production management.
4. Full-auto CIP cleaning, to ensure whole production line equipments meet food sanitary safety requirements.
5. Whole line with features as high level automatic, low labour intensity, easy operation, safe function and low operation cost.
Information:
Product Name | 5-200TPD Long shelf life UHT milk line |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 4-18persons |
Cooling water consumption | About 60-500M3 |
Steam consumption | About 200-4000T/H, |
Factory space needed | About 400-6000Sqm |
Warranty | 12 months |
Specifications:
Capacity | 5-200TPD |
Raw material |
Fresh cow milk, buffalo milk, goat milk, camel milk or milk powder, or both mixed |
End product | Pure milk, UHT milk, long shelf life milk |
Shelf life |
35-40days, 3months, 6months, 12months (keep at room temperature ) |
Final product fat (%) |
Semi-skimmed or double toned milk (1.5%); Full cream(3% or 6%); Toned milk(3%) |
SNF | 8.5%(min) |
Fresh milk inlet temperature | 4 ℃ |
Filling temperature | 20~30 ℃ |
Package for end product | plastic bag |
Certification: | ISO9001/CE/SGS |
Main material for machines | SUS304 or SUS316 |
Place of Origin: | China |
Manufacturer history | More than 10years |
Voltage | 380V 50Hz/110V 60hz/415V 50Hz |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 6-20persons |
Cooling water consumption | About 80-300M3 |
Steam consumption | About 300-5000T/H, |
Factory space needed | About 500-5000Sqm |
Warranty | 12 months after commissioning |
* Duration of Guarantee:
1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
* installation terms:
1. 50-60 days for installation and commissioning.
2. provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
3. buyer provide round way air tickets,local traffic , room and board,in addition pay subsidary per day for each engineer.
Company Details
Business Type:
Manufacturer
Year Established:
1995
Total Annual:
500-1000
Employee Number:
50~100
Ecer Certification:
Active Member
Zhejiang Jinben Machinery Manufacturing Co., Ltd., founded in 1995 with the area of 23,500㎡, is specialized in the design, research and development, production and sales of food and beverage machinery and equipment. The main products and servi... Zhejiang Jinben Machinery Manufacturing Co., Ltd., founded in 1995 with the area of 23,500㎡, is specialized in the design, research and development, production and sales of food and beverage machinery and equipment. The main products and servi...
Get in touch with us
Leave a Message, we will call you back quickly!