Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 30MW/month |
Delivery Time | 15-25 work days |
Packaging Details | Carton box,wooden pallet,belt bundle packing and other kinds of package ensure the products safty and waterproof. |
Install Site | Open Ground |
Tilt Angle | 10-60° |
Height clearance | 8' to 15' typical |
Depth | Unlimited |
Space-to-Column ratio | 3:1 or 4:1 typical |
Installation time | 7~15working days (1MW project) |
Brand Name | TIANFON |
Model Number | Carport Solar Systems |
Certification | SGS,ISO 9001,ISO 14001,OHSAS 18000 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Customized PV Carport Solar Systems Mounting Bracket Open Ground Anti -
Metal Galvanized Solar Power Parking Lot , Flexible 1-20kw Solar Panel Parking
Residential Carport Solar Systems Aluminum Alloy PV Panel Support System 130mph
Waterproof Carbon Steel Aluminum Structures Solar Carport Mounting Systems
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 30MW/month |
Delivery Time | 15-25 work days | Packaging Details | Carton box,wooden pallet,belt bundle packing and other kinds of package ensure the products safty and waterproof. |
Install Site | Open Ground | Tilt Angle | 10-60° |
Height clearance | 8' to 15' typical | Depth | Unlimited |
Space-to-Column ratio | 3:1 or 4:1 typical | Installation time | 7~15working days (1MW project) |
Brand Name | TIANFON | Model Number | Carport Solar Systems |
Certification | SGS,ISO 9001,ISO 14001,OHSAS 18000 | Place of Origin | CHINA |
High Light | solar carport structures ,solar charging carport |
Ground Parking Structure Carport Solar System Steel Brackets Concrete Block Foundation
The Solar Mounting structure is used to fix the solar pv panels and gives a support and inclination to the system.
They can be mounted on a concrete foundation or ground screws.Customized tilt angles meet the complex requirements of the construction site and use effectively energy of the sun. Pre-assembled beam saves labor time, reduces cost and makes installation quick.
And they are made by galvanized steel, anodized aluminum alloy & stainless steel which featured with lightweight, high strength and recyclable material.
Product feature:
Ⅰ. Easy Installation.
Parts have been high pre-assembly on factory to save your installation time.
Ⅱ. Flexibility and Adjustable
Smart design reduce the difficulty of the installation on the most condition.
Ⅲ. Maximum Lifespan:
All components are made of quality extruded aluminium, C-steel and stainless steel.The high corrosion resistance guarantees the maximum possible lifespan and is also completely recyclable.
Product Parameter :
Intallation Angel: | 5deg-15deg |
Max Wind Speed: | up to 42m/s |
Max Snow Load: | up to 1.4KN/m2 |
Span(E-W): | 5000mm |
Standard ground clearance: | 2500mm |
Panel array: | Landscape |
Rows: | 4/5/6 |
Installation:
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2016
Total Annual:
1500000-3000000
Employee Number:
100~150
Ecer Certification:
Verified Supplier
As a member of Tianfon Green Assembly Group,Henan Tianfon New Energy Tech. Co., Ltd mainly engaged in photo-voltaic solar mounting system and related accessories.Being a well-known manufacturer and integrator in photo-voltaic&photo-thermal mounting system area in domestic,we have a high quality ... As a member of Tianfon Green Assembly Group,Henan Tianfon New Energy Tech. Co., Ltd mainly engaged in photo-voltaic solar mounting system and related accessories.Being a well-known manufacturer and integrator in photo-voltaic&photo-thermal mounting system area in domestic,we have a high quality ...
Get in touch with us
Leave a Message, we will call you back quickly!