| Payment Terms | L/C,T/T |
| Supply Ability | 50sets per year |
| Delivery Time | 50 days |
| Packaging Details | export standard packing |
| Voltage | 220V/380V |
| Power | 10kW-100kW |
| Application | Foam industry |
| Power Source | Electric |
| Features | High Efficiency, Stable Performance, Easy Operation |
| Frequency | 50Hz/60Hz |
| Brand Name | HONGXINGWANG |
| Model Number | HXW-LP-190 |
| Certification | CE |
| Place of Origin | China |
View Detail Information
Explore similar products
Continuous Latex Foam Machine Production Lines With High Production Efficiency
High Automatically Latex Insole Making Machine CE Certification
Sophisticated Comfort Aluminum Alloy Latex Pillow Mould Easy Maintenance
Precision Latex Mattress Mould Core Component In Latex Mattress Production
Product Specification
| Payment Terms | L/C,T/T | Supply Ability | 50sets per year |
| Delivery Time | 50 days | Packaging Details | export standard packing |
| Voltage | 220V/380V | Power | 10kW-100kW |
| Application | Foam industry | Power Source | Electric |
| Features | High Efficiency, Stable Performance, Easy Operation | Frequency | 50Hz/60Hz |
| Brand Name | HONGXINGWANG | Model Number | HXW-LP-190 |
| Certification | CE | Place of Origin | China |
| High Light | Latex Pillow Production Line ,190m Length Pillow Production Line ,Pillow Production machine 50kw | ||
190m length Latex Pillow Production line
Injection Molding
· The expanded latex foam is metered into the prepared pillow mold through a pipe and injection gun.
· The mold will not be completely filled because the foam will expand to a certain extent when heated.
Stage 3: Vulcanization and Setting
1. Vulcanization (Heat Curing)
· The mold filled with latex foam is placed in a vulcanization oven or vulcanizing chamber.
· It is heated at a specific temperature (e.g., 110°C - 130°C) for a period of time (e.g., 20-30 minutes).
· During this process, the vulcanizing agent undergoes a chemical reaction, transforming the latex from a viscous liquid into a permanently elastic solid, permanently fixing the foam's structure. This is known as "setting."
Stage 4: Post-Processing and Processing
1. Demolding
· After exiting the vulcanizing chamber, the mold is cooled (either with water or air). Workers remove the formed latex pillow from the mold by hand or with tools. At this point, it's still a complete "pillow embryo."
2. Washing (Water Washing)
The latex pillow is repeatedly rinsed in a large industrial water washing machine.
Purpose: To remove residual chemical additives, soap, and mold release agents from the surface, ensuring a pure, odor-free product. This process also makes the pillow cleaner and more environmentally friendly.
3. Dehydration and Drying
Dehydration: A centrifuge is used to remove the bulk of the water from the latex pillow.
Drying: The latex pillow is placed in a large dryer, where it is thoroughly dried using circulating hot air. Controlling the temperature and time is crucial to ensure thorough drying without damaging the latex structure due to excessive temperatures.
Stage 5: Quality Inspection and Packaging
1. Quality Inspection
Visual Inspection: Check for defects, bubbles, contamination, tears, etc.
Dimensional and weight inspection: Ensure compliance with specifications.
Feel and odor inspection: Ensure proper elasticity and the absence of unusual odors. Some products undergo random destructive testing to check density and durability.
2. Trimming and Packaging
· Trim away the filling port and rough edges.
· Upon request, some pillows are enclosed in a liner bag.
· Finally, a vacuum compression packaging machine vacuums and compresses the latex pillow, significantly reducing its volume before packaging it into a cardboard box. This significantly reduces shipping costs and is the reason why the pillows arrive flat when consumers receive them.
190m latex pillow production line Basic Data:
Conveyor length: 190m in total
Vulcanizing Chamber length: 78.8m
Injection parts: 17m
Moulds clearing, mould open and close part: 99.7m
Turning parts: 3.7m
Vulcanizing time is 40mins
The conveyor speed is 2.2m/min
Capacity: 3000pcs pillows/8hours
Installation size: 50m(L)*8m(W)
Motor power: 50kw
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
3000000USD-5000000
Employee Number:
20~30
Ecer Certification:
Verified Supplier
We are professional company with providing whole solution of setting up foam factory (sponge factory) Our engineer team has more than 20 years working experience in foam machine industry our compnay focus on manufacturing high quality Continuous foam machine, Batch Foam Machine, CNC Foam Cutting M... We are professional company with providing whole solution of setting up foam factory (sponge factory) Our engineer team has more than 20 years working experience in foam machine industry our compnay focus on manufacturing high quality Continuous foam machine, Batch Foam Machine, CNC Foam Cutting M...
Get in touch with us
Leave a Message, we will call you back quickly!