China factories

Chat Now Send Email
China factory - CoatTech Intelligent Equipment(Guangzhou) CO.,LTD

CoatTech Intelligent Equipment(Guangzhou) CO.,LTD

  • China,Foshan
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Turnkey Air Conditioner Component Powder Coating Line | Complete Immersion
China Turnkey Air Conditioner Component Powder Coating Line | Complete Immersion

  1. China Turnkey Air Conditioner Component Powder Coating Line | Complete Immersion

Turnkey Air Conditioner Component Powder Coating Line | Complete Immersion

  1. MOQ: 1
  2. Price: USD8000-USD1200/SET
  3. Get Latest Price
Payment Terms T/T
Energy Sources: Water, Electricity,gas
Coating 10-50um
Using Energy: Diesel,gas,steam,electric Or Other Option
Delivery Time 15 DAYS After Deposit
Power Supply: 380V/50HZ/3Ph Or Other Option
Heating System Riello Brand Burner
Material Steel
Supply Ability 30SET/MONTH
Application: Bus/truck Or Other Metallic Products
Packaging Details With regular Film and Carton
Main Door: Fold Style Or Electric Rolling Style
Noise Level ≤80dB
Model Number Air Conditioner Component Powder Coating Line
Certification CE
Brand Name CoatTech
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Energy Sources: Water, Electricity,gas
Coating 10-50um Using Energy: Diesel,gas,steam,electric Or Other Option
Delivery Time 15 DAYS After Deposit Power Supply: 380V/50HZ/3Ph Or Other Option
Heating System Riello Brand Burner Material Steel
Supply Ability 30SET/MONTH Application: Bus/truck Or Other Metallic Products
Packaging Details With regular Film and Carton Main Door: Fold Style Or Electric Rolling Style
Noise Level ≤80dB Model Number Air Conditioner Component Powder Coating Line
Certification CE Brand Name CoatTech
Place of Origin China
High Light turnkey air conditioner coating linecomplete immersion pretreatment systempowder coating curing system

Hey Guys,we will break this project into 4 sub project here

Project  Complete Air Conditioner Component Immersion Pretreatment & Powder Coating Production Line

Document Reference: CTI-EXP-2026-ACPC

Date: August 27,2026

Notice to Global Clients: This proposal details the complete technical specifications, process workflow, system architecture, safety guidelines, and standard scope of supply for an automated/semi-automated industrial powder coating plant designed for air conditioner metallic enclosures and components.

Project 1


When we designed this specific batch-type powder coating line for air conditioner enclosures, our primary headache wasn’t just hitting the 200°C curing mark—it was figuring out how to stop water drag-out between the 4-stage silane tanks and the moisture-drying oven. If you've ever dealt with flash-rust on heavy steel frames (up to 300kg with dual hangers), 


you know standard catalog specs don't cut it. We ended up combining an overhead monorail loop with ground transport carts so workers aren't breaking their backs moving 3.8-meter panels.

Below is the exact engineering breakdown of the setup we build and ship out in standard 40HQ containers—no fluff, just raw technical parameters and real fabrication specs


1. Project Overview & Basic Design Conditions



1.1 Basic Operating Parameters

Parameters

Specifications

 

Workpiece Material

Rust-free sheet metal, steel frames, air conditioner enclosures

Coating Method

Manual electrostatic powder spraying (Smart digital gun)

Max. Integrated Workpiece Dimensions

L3800 mm × W450 mm × H2600 mm (Customer Confirmed)

Max. Loading Weight

≤ 300 kg (including hangers, dual-point suspension)

Design Production Cycle Rate

30 minutes per batch / furnace loading

Conveyor Transport Mode

Monorail overhead suspension line + Ground rail cart transfer system

Overall Plant Layout Footprint

As indicated in the master layout drawing (approx. L8.5m × W4.6m × H3.5m for pretreatment area)

Scope of Plant Equipment

4-Stage Immersion Pretreatment System (1 set), Water Drying Oven (1 set), Powder Curing Oven (1 set), Spraying Booth & Secondary Recovery System (1 set), Conveyor Lines (1 set), Integrated Electrical Controls (2 sets)


1.2 Utility & Environmental Requirements


Parameters

Specifications

 

Power Grid Supply

380V / 220V, 3-Phase 5-Wire / 1-Phase, 50Hz (Voltage Fluctuation Range: ±10%)

Total Installed Power Capacity

218 kW (Heating System: 192 kW, Spraying System: 15 kW, Circulation Fans: 11 kW)

Compressed Air Supply Pressure

≥ 0.7 MPa

Compressed Air Quality Criteria

Max. allowable water content < 1.3 g/m³, Max. allowable oil content < 0.1 mg/m³

Compressed Air Consumption Rate

Peak Flow: 6.0 m³/min | Continuous Running Flow: 2.0 m³/min

Industrial Water Supply Pressure

0.15 MPa ~ 0.30 MPa

Water Consumption Rate

Approx. 0.1 Ton/hour (Pressure ≥ 0.25 MPa)


1.3 Compliance Design Standards & Codes


● GB7691-2003: Safety Code for Painting - General Rules for Safety Management

● GB6514-1995: Safety Code for Painting - Process Safety and Ventilation/Purification

● GB7692-1999: Safety Code for Painting - Pretreatment Process Safety & Ventilation

● GB12942-2006: Safety Code for Painting - Safety Technical Requirements for Confined Spaces

● GB935-89: Limits of Continuous Exposure Time to Thermal Radiation in High-Temperature Work Environment

● GBZ1-2002 & GBZ2-2002: Hygienic Standards and Occupational Exposure Limits for Industrial Enterprises

● GB4064-83 & GB50254-1996: General Electrical Safety Directives and Installation Engineering Code for Low-Voltage Apparatus

● GB14443-1993: Safety Code for Painting - Safety Technical Regulations for Coating Drying Ovens


2. Complete Process Flow & Operating Cycle



Stage

Process Step

Method / Media

Chemical / Medium

Dwell Time

Operating Temp.

 

01

Loading (Up-loading)

Overhead Crane / Hoist

N/A

Batch Dependent

Ambient

02

Pre-Degreasing & Degreasing

Chemical Immersion Tank

Degreasing Agent

3 min

Ambient

03

Water Rinse (Stage 1)

Immersion Washing

Industrial Tap Water

1 min

Ambient

04

Silane / Phosphating Pretreatment

Chemical Immersion Tank

Silane Agent

3 min

Ambient

05

Water Rinse (Stage 2)

Immersion Washing

Industrial Tap Water

1 min

Ambient

06

Moisture Drying Oven

Hot Air Recirculation

Electric Heating (84 kW)

10 - 20 min

120°C ~ 160°C

07

Cooling Stage

Natural Air Cooling

Ambient Air

10 min

Ambient

08

Powder Spraying

Manual Electrostatic Gun

Thermosetting Powder

Batch Dependent

Ambient

09

Powder Curing Oven

Hot Air Recirculation

Electric Heating (108 kW)

15 - 20 min

180°C ~ 200°C

10

Final Product Cooling

Natural Air Cooling

Ambient Air

40 min

Ambient

11

Unloading (Down-loading)

Manual Operation

N/A

Batch Dependent

Ambient


Today That is all,let us continue it tomorrow Aug 28th



Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1999

  • Total Annual:

    3millions-570000

  • Employee Number:

    180~220

  • Ecer Certification:

    Verified Supplier

Welcome to CoatTech Intelligent Equipment.We do more than build equipment—we engineer out your production bottlenecks. Based in Guangzhou, China, we design and manufacture intelligent coating solutions that reduce downtime, lower energy costs, and deliver flawless finishes. From custom spray b... Welcome to CoatTech Intelligent Equipment.We do more than build equipment—we engineer out your production bottlenecks. Based in Guangzhou, China, we design and manufacture intelligent coating solutions that reduce downtime, lower energy costs, and deliver flawless finishes. From custom spray b...

+ Read More

Get in touch with us

  • Reach Us
  • CoatTech Intelligent Equipment(Guangzhou) CO.,LTD
  • No. 7 West Station South Road,Kechuang Yunzhihui, C Floor (Whole Floor),Shishan Town, Nanhai District, Foshan, China
  • https://www.spraying-booth.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement