| Supply Ability | Single item,60-90 days |
| model number | customize |
| gas type | customize |
| machinery test report | Provided |
| Delivery Time | 60-90 days |
| video outgoing-inspection | Provided |
| Application | customize |
| Payment Terms | L/C,T/T |
| core components | PLC, Pressure Vessel, Engine, Gear, Motor, Pump, Bearing, Gearbox, Other |
| OEM | OEM Services Provided |
| mute | Yes |
| power source | DC Power |
| type | Waste heat power turbine generator set |
| Packaging Details | Customized wooden box, customized iron box |
| Power | customized for customers |
| Certification | CE, ISO9001, IS014001, HSAS18001, IATF16949 system certification CCS、DNV |
| Model Number | customization |
| Place of Origin | Chongqing, China |
| Brand Name | LAISHUN |
View Detail Information
Explore similar products
Product Specification
| Supply Ability | Single item,60-90 days | model number | customize |
| gas type | customize | machinery test report | Provided |
| Delivery Time | 60-90 days | video outgoing-inspection | Provided |
| Application | customize | Payment Terms | L/C,T/T |
| core components | PLC, Pressure Vessel, Engine, Gear, Motor, Pump, Bearing, Gearbox, Other | OEM | OEM Services Provided |
| mute | Yes | power source | DC Power |
| type | Waste heat power turbine generator set | Packaging Details | Customized wooden box, customized iron box |
| Power | customized for customers | Certification | CE, ISO9001, IS014001, HSAS18001, IATF16949 system certification CCS、DNV |
| Model Number | customization | Place of Origin | Chongqing, China |
| Brand Name | LAISHUN | ||
| High Light | 780℃ Waste Heat Turbine Generator Set ,300℃ Waste Heat Turbine Generator Set ,780℃ Waste Heat Recovery Power Generation | ||
| Type | Single Effect Evaporator | Multi-effect Evaporator | MVR Evaporator |
|---|---|---|---|
| Energy Consumption | High energy consumption, theoretically 1 ton of steam is required to evaporate 1 ton of water | More energy-efficient, generally speaking, as the efficiency increases, the energy consumption also decreases accordingly | The most energy-efficient evaporator technology currently requires only 15KW/h to 50KW/h of electricity to evaporate each ton of water |
| Floor Area | Small | Big | Small |
| Impact on Product Quality | Short dwell time, but high temperature, with minimal impact on product quality | Long dwell time, high temperature, and minimal impact on product quality | Short residence time, evaporation due to temperature difference, minimal impact on product quality |
| Energy Mode | To use steam heating, a steam pipeline network and boiler are required | To use steam heating, a steam pipeline network and boiler are required | Electricity is sufficient, no steam pipe network required, fully self-closing circulation system |
| Operating Cost | High | Higher | Low |
| Stability | Poor | Poor | Good |
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2011
Total Annual:
5000000 USD-20000000
Employee Number:
60~200
Ecer Certification:
Verified Supplier
.gtr-container-lsmmc789 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333333; line-height: 1.6; padding: 16px; box-sizing: border-box; /* Derived color palette */ --primary-color: #0000FF; --primary-da... .gtr-container-lsmmc789 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333333; line-height: 1.6; padding: 16px; box-sizing: border-box; /* Derived color palette */ --primary-color: #0000FF; --primary-da...
Get in touch with us
Leave a Message, we will call you back quickly!