Payment Terms | L/C,T/T,Western Union |
Supply Ability | 20000 Square Meter Per Month |
Delivery Time | 30 Days |
Packaging Details | As request |
Raw steel material | Q235B, Q355B |
Surface treatment | Painting or Hot-dip Galvanize |
Shot blasting level | Sa 2.5 |
Service life | 50 Years |
Wall and Roof | Glass wool |
Type | Portal frame structure |
Working scope | Design,Fabrication, Installation |
Application | Steel structure warehouse, workshop |
Brand Name | Ruly Steel |
Model Number | Ruly0114 |
Certification | SGS, BV |
Place of Origin | China |
View Detail Information
Explore similar products
Sa 2.5 Shot Blasting Steel Structure Workshop Pre Engineered Building Structure
Heavy Industrial Steel Structure Workshop With Crane Prefab Designed 50 Years
Large Steel Structure Workshop Prefabricated Workshop Buildings With Crane
Modern Steel Structure Factory Building With Mezzanine Metal Workshop Constructi
Product Specification
Payment Terms | L/C,T/T,Western Union | Supply Ability | 20000 Square Meter Per Month |
Delivery Time | 30 Days | Packaging Details | As request |
Raw steel material | Q235B, Q355B | Surface treatment | Painting or Hot-dip Galvanize |
Shot blasting level | Sa 2.5 | Service life | 50 Years |
Wall and Roof | Glass wool | Type | Portal frame structure |
Working scope | Design,Fabrication, Installation | Application | Steel structure warehouse, workshop |
Brand Name | Ruly Steel | Model Number | Ruly0114 |
Certification | SGS, BV | Place of Origin | China |
High Light | prefab steel buildings ,metal workshop building |
Ready Made Steel Structure Workshop Architecture With Office Building Inside
This is a Ready Made Steel Structure Workshop Architecture With Office Building Inside that used for water tank production. Welded H-section steel beams and columns are connected by high strength bolts to be the main structure. It also has a office building in the workshop. This steel structure includes two spans, one of the span has mezzanine or it has two storeys.
Prefabricated steel frame structure workshop buildings could provide large space and easy to install compared with concrete workshop building.
Steel Frame | H section steel | Q235/Q345 steel 8mm/10mm |
Welding | Automatic submerged arc welding | |
Rust removal | Sand blasting | |
Surface finish | Alkyd paint or galvanized | |
Intensive bolt | M20,Grade 10.9 | |
Supporting System | Angle brace | L50x4,Steel Q235, processed and painted |
Horizontal brace | Φ20, Steel Q235, processed and painted | |
Column brance | Φ20, Steel Q235, processed and painted | |
Tie rod | Φ89*3, Steel Q235, processed and painted | |
Ordinary bolt | M12 Galvanized bolt | |
Roof | Purlin | C160*60*2.5,Steel Q235, galvanized and painted |
Roof panel | Sandwich panel or corrugated steel sheet | |
Sky light | 6mm thick PVC | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.4mm steel sheet profile trimming | |
Gutter | 0.4mm thick sheet steel profile or galvanized sheet | |
Down pie | Φ110PVC | |
Walls | Purlin | C160*60*2.5,Steel Q235, painted |
Wall | Sandwich panel or corrugated steel plate | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.4mm steel sheet profile trimming | |
Ventilation | Ventilation ball | |
Doors & windows | Rolling door/sliding door PVC/alu/steel/window |
We will provide construction drawing for each project to guide installation. We will teach you the installation in our factory. We could dispatch our engineer to guide installation on site or we install it by our construction team.
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
15 Million-20 Million
Employee Number:
100~110
Ecer Certification:
Verified Supplier
Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation. The floor space of our steel structre fabrication factory is 35,000㎡, and the worksh... Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation. The floor space of our steel structre fabrication factory is 35,000㎡, and the worksh...
Get in touch with us
Leave a Message, we will call you back quickly!