China factories

China factory - Qingdao Ruly Steel Engineering Co.,Ltd

Qingdao Ruly Steel Engineering Co.,Ltd

  • China,Qingdao ,Shandong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation

  1. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
  2. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
  3. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
  4. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
  5. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation
  6. China Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation

Prefabricated Steel Workshop Q235B Q355B Rock Wool Insulation

  1. MOQ: 500 Square Meter
  2. Price: USD29-USD99 Per Square Meter
  3. Get Latest Price
Payment Terms L/C,T/T,Western Union
Supply Ability 20000 Square Meter Per Month
Delivery Time 30 Days
Packaging Details As request
Application Steel workshop, warehouse
Raw steel material Q235B, Q355B, ASTM A36
Shot blasting level Sa 2.5
Service life 50 Years
Wall and Roof Rock wool
Surface treatment Painting
Type Large span multi span steel frame structure
Working scope Design,Fabrication, Installation
Brand Name Ruly Steel
Model Number Ruly0316
Certification SGS, BV, ISO
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,T/T,Western Union Supply Ability 20000 Square Meter Per Month
Delivery Time 30 Days Packaging Details As request
Application Steel workshop, warehouse Raw steel material Q235B, Q355B, ASTM A36
Shot blasting level Sa 2.5 Service life 50 Years
Wall and Roof Rock wool Surface treatment Painting
Type Large span multi span steel frame structure Working scope Design,Fabrication, Installation
Brand Name Ruly Steel Model Number Ruly0316
Certification SGS, BV, ISO Place of Origin China
High Light Prefabricated Steel Structure WorkshopConstruction Steel Structure WorkshopPrefabricated Steel Structure Buildings

 

Prefabricated Steel Structure Workshop Construction Steel Structure Buildings

 

Project Information:

 

This is a Prefabricated Steel Structure Workshop Construction Steel Structure Buildings. Welded H-section steel beams and columns are connented by high strength bolts to be the main frame structure. New-type metal composite panel is used as wall and roof insulation panel. Parapet wall was set up at end wall.

 

Steel structural members are manufactured in our professional processing plants with high precision and good quality. The steel structure workshop is energy-saving and environmentally friendly. Compared with the traditional masonry structure and concrete structure, the steel structure belongs to the green building structure system. The wall of the steel structure factory adopts new lightweight composite wall panels or lightweight blocks, such as high-performance NALC boards, and the floor uses composite slabs, such as profiled steel plates, to meet the requirements of building energy conservation and environmental protection. It can achieve the goal of 50% energy saving, which greatly saves energy.

 

Specification of steel structure material:

 

Item name

Specification Material Parameter Technical Treatment
Column H shape steel Q235B,Q345B Paint or Hot dip galvanized
Beam H shape,steel Truss Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B  
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B  

 

How to install:

We will provide construction drawing for each project to guide installation. We will teach you the installation in our factory. We could dispatch our engineer to guide installation on site or we install it by our construction team.

 

 

Packing and transport:

 

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

 

 

Show drawings and designs:

 

How to quote:

 

The following question we need to know before making the price. Just feel free to fill what you know.

1 Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2009

  • Total Annual:

    15 Million-20 Million

  • Employee Number:

    100~110

  • Ecer Certification:

    Verified Supplier

  Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation.   The floor space of our steel structre fabrication factory is 35,000㎡, and the worksh...   Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation.   The floor space of our steel structre fabrication factory is 35,000㎡, and the worksh...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao Ruly Steel Engineering Co.,Ltd
  • Tieshan Industrial zone, Huangdao District, Qingdao City.
  • https://www.steel-structurewarehouse.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement