Payment Terms | L/C,T/T,Western Union,MoneyGram |
Supply Ability | 10000TON/MONTH |
Delivery Time | 30 DAYS |
Packaging Details | All steel structures components are consolidated in steel pallets |
Drawing Design | AutoCAD,3D,PKPM |
Install | Online guide support & On-site install |
Surface Treatment | Hot Dip Galvanised or painted |
Window | Aluminum Alloy Window |
Secondary Frame | Galvanized C Purlin |
Main Steel | H steel Q355, Q235, Etc. |
Brand Name | YDX |
Model Number | YDX-H112 |
Certification | ISO,BV,SGS,CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Office Multi Storey Steel Building Galvanized Multi Layer Steel Building
Restaurant Hotel Office Multi Storey Steel Building Fabricated High Rise Steel
Light Gauge Steel Frame Structure Construction Multistorey High Rise Steel
Office Prefabricated Multi Storey Steel Building Hotel Steel Structure Building
Product Specification
Payment Terms | L/C,T/T,Western Union,MoneyGram | Supply Ability | 10000TON/MONTH |
Delivery Time | 30 DAYS | Packaging Details | All steel structures components are consolidated in steel pallets |
Drawing Design | AutoCAD,3D,PKPM | Install | Online guide support & On-site install |
Surface Treatment | Hot Dip Galvanised or painted | Window | Aluminum Alloy Window |
Secondary Frame | Galvanized C Purlin | Main Steel | H steel Q355, Q235, Etc. |
Brand Name | YDX | Model Number | YDX-H112 |
Certification | ISO,BV,SGS,CE | Place of Origin | CHINA |
High Light | Modular Steel Structure High Rise Building ,Steel Structure High Rise Building Prefab ,Prefab Commercial Metal Building Construction |
High Rise Modular Construction Metal Steel Prefabricated Industrial Commercial building
Steel structure high rise building characteristic:for the building which is more than 7 floors,the main steel frame are double H section steel or box shape steel column ,we will weld some male pin on the steel members,then steel frame will connect with concrete very well,client can save some tonnage of steel and save some cost for concrete too .,steel deck as one of the most important material for the flooring,Steel deck can be installed for each floor together and place at the same time . But concrete building can not . The external wall materials for the building,depend on the clients' requirement and design,it can be aluminium curtain or glass curtain wall .
Specifications | |
1)Size(m): | Width * Length * Height; |
2)Type: | Single slope, double slope, Multi-slope; Single span, double-span, Multi-span; Single floor, double-floor, Multi-floor; |
3) Base: | steel foundation bolts |
4) Steel frame: | Material Q345(S355JR)(Gr50)or Q235(S235JR) steel; Straight cross-section or Variable cross-section; steel welded H section painted or galvanized. |
5) Bracing: | X-type or V-type or other type bracing made from angle, round bar, etc ; |
6) Wall & Roof Purlin: | C section channel or Z section channel ,Size from C80~C300; Z100~Z300; |
7) Roof & wall cladding | Single color corrugated steel sheet 0.326~0.7mm thickness; Sandwich panel with EPS, ROCK WOOL,GLASS WOOL, PU etc insulation, thickness around 50mm 75mm 100mm 120mm 150mm 200mm; recommend coating PVDF SMP HDP PE |
8)Window: | UPVC/PVC or Aluminum Alloy window frame with glass. |
9)Door: | Exterior door:Sliding or Roller shutter door. Internal door:50mm thickness EPS sandwich panel with an aluminum alloy door frame |
10) Gutter material: | Color steel sheet or galvanized steel or stainless steel; |
11)Rainspout: | PVC pipe |
12)Connection | high strength bolts ,intensive bolt,self-drilling screws. |
13)Accessories: | Skylight panel, Ventilation, Fasteners etc |
14)Surface process: | Shot blasting Sa2.5;Two layers of Anti-rust Painting or galvanized |
15) Packing: | Main steel frame without packing load in 40' GP, roof and wall panel load in 40' HQ |
Packing and loading
Shipment via 20'/40'/40HC/40OT sea containers
*All steel structure weld components are carefully packed with blankets or bubble wrap to prevent scratches during loading and unloading.
*All steel structures components are consolidated in steel pallets within the container, optimizing loading and unloading time and labor costs.
*All sandwich panels are efficiently packed in steel pallets.
*Comprehensive container load plans and regional unloading plans are devised to avoid onsite retransportation.
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
1000-2000
Employee Number:
56~100
Ecer Certification:
Verified Supplier
Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...
Get in touch with us
Leave a Message, we will call you back quickly!