Payment Terms | L/C,T/T,Western Union,MoneyGram |
Supply Ability | 10000SETS/MONTH |
Delivery Time | 15 DAYS |
Packaging Details | Suitble packing for shipping |
Floor | Cement-fibre Board+PVC floor |
Kitchen Cabinet | More layer board |
Windows | Aluminum/PVC |
Doors | Steel/Aluminum |
Structure Type | Frame Structure |
Wall System | 75mm EPS sandwich panel |
Main Materia | light steel frame & sandwich panel |
Column | 3mm glavnized |
Electricity | Custom made |
Design | Waterproof Design,Modular Design |
Brand Name | YDX |
Model Number | YDXC102 |
Certification | ISO,BV,SGS,CE |
Place of Origin | China |
View Detail Information
Explore similar products
Prefab Apple Cabin Container House for Coastal Hotels
Hotel Space Capsule Container House Prefab Modular House Building With Interior
Prefabricted Residential Container Homes Q355 Q235 Container Module House
Double Wing Folding Prefabricated Container House Per Set 20 Ft 40ft Extension
Product Specification
Payment Terms | L/C,T/T,Western Union,MoneyGram | Supply Ability | 10000SETS/MONTH |
Delivery Time | 15 DAYS | Packaging Details | Suitble packing for shipping |
Floor | Cement-fibre Board+PVC floor | Kitchen Cabinet | More layer board |
Windows | Aluminum/PVC | Doors | Steel/Aluminum |
Structure Type | Frame Structure | Wall System | 75mm EPS sandwich panel |
Main Materia | light steel frame & sandwich panel | Column | 3mm glavnized |
Electricity | Custom made | Design | Waterproof Design,Modular Design |
Brand Name | YDX | Model Number | YDXC102 |
Certification | ISO,BV,SGS,CE | Place of Origin | China |
High Light | Modular Prefabricated Container House ,Prefabricated Container House Portable ,Modular Office Accommodation Camp |
Prefabricated fast assmeble module container Prefab Modular Portable Site Office Accommodation Camp
We K-home devoted to providing qualified temporary container house for the market, and as the development of the container house, we have solved the roof leakage problem very well and increased the floor structure into a very stable situation.
The Cons of using prefab modular site office as below:
[1] Portable: Especially for some construction sites, because their construction sites are often changed, ordinary houses need to be disassembled and reworked. However, if you use a Portable Office, you can simply transport it to the next site by car.
[2] Durable: Modular Container has a relatively strong firmness because the container house is all made of steel materials, so they have a better ability to withstand earthquakes and deformation.
[3] Customized: The size, configuration, and design can be customized because it's all bolts-connected structure.
Characteristics:
1. Portable anti-earthquake assemble container adopts the steel structure frame design, with perfect stability, and the wind resistance capacity can be more than100km/h, and the seismic resistance capacity can be more than 8 Grade.
2. This container house consists of chassis, housetop, and wall system. The wall system is made of sandwich panels, and the core material of sandwich panels is EPS/Rock Wool /PU, etc.
3. The thickness is from 50mm to 100mm. The steel sheet is made from colored steel (the Pattern can be optional).
4. The roof and floor are prefabricated at our factory, which is made the installment easier. The roof adopts the overall design, and it has enhanced the airtightness, and water resistance.
main structure | galvanized steel |
Each moule size | 6000mm*300mm*2896mm |
wall material | 50mm-100mm thickness sandwich panel |
floor material | MGO board/cement fiber board |
door | anti-theft steel wood or steel door |
window | Alumimium alloy+ glass |
electrical | Based on client's country standard |
application | affordable home, site office, accommodation, warehouse, classroom |
Product Application | |||
Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
2. Surface: Hot Dip Galvanized or Painted; | |||
3. Connection: All Bolts Connection; | |||
Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
Wall Purlin | C or Z Section Steel, Q235B | ||
Bracing | Steel Rod, Q235B | ||
Cross Support | Steel Rod, Q235B | ||
Column Support | Angle Steel; Steel Rod; Q235B | ||
Angle Brace | Angle steel,Q235B | ||
Tie Bar | Steel Pipe,Q235B | ||
Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm | ||
2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm; | |||
Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
Window | Aluminum Alloy; PVC; | ||
Downspout | PVC pipe; | ||
Gutter | Galvanized Steel Sheet; Stainless Steel | ||
Ventilator | Stainless Steel Turbine Ventilator | ||
Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
Flash | Color Steel Sheet | ||
Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc |
Product Processing
The main processes of steel structure components in the workshop are:
1. Cutting
Steel components, such as beams, columns, and plates, are precisely cut to the required dimensions using advanced cutting techniques, such as Automatic laser cutting machine, to ensure accurate fitment during assembly.
2. Assemble
The cut steel pieces are fitted together according to engineering drawings and specifications.
3. Welding
Welders employ various welding techniques, to join the steel components securely. Welding creates strong and resilient connections, enhancing load-bearing capacity.
4. Rust removal
Before surface treatment, any rust or scale on the steel surfaces must be removed. Techniques like sandblasting, shot blasting, or chemical cleaning are used to eliminate corrosion, creating a clean and smooth surface.
5. Surface treatment
Spray painting or hot-dip galvanizing according to customer's requirements, so that the surface is not corroded.
Packing and Delivery
Container and pallet packing will protect the surface paint or zinc of the steel structures.
In order to facilitate your installation, we will mark each component in sequence according to the drawings.
FAQ
1. What kind of company you are?
We are steel structure building Manufacturer located in Qingdao China.
2. What are your main products?
Our main products have steel structure,warehouse,workshop,factory,office building, hangar,garage,poultry house...
3. What should the client provide before you offer a complete quotation?
When we receive inquiry from client, please fill purchasing intention sheet, providing us with information of building dimensions, draft drawing, layout and materials for prefabricated building. We will design the drawings and offer competitive quotation with the above information.
4. Can we visit your factory?
Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
5. How to install?
We will provide detailed installation instruction and video for you, technicians will be sent to help you if the project is big and required our technicians to be onsite as supervisitors.
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
1000-2000
Employee Number:
56~100
Ecer Certification:
Verified Supplier
Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...
Get in touch with us
Leave a Message, we will call you back quickly!