Payment Terms | T/T |
Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days |
Packaging Details | Exported standard packing |
Column & BeamConnection: | High Strength Bolt |
Advantage: | Easy & Fast Install |
Use: | Warehouse, Workshop |
Roof: | Glass Wool, EPS, PU |
Material: | Steel, Purlin, Column |
Surface Treatment: | Painted Or Galvanized |
Brand Name | YDX |
Model Number | YDX-5DG |
Certification | CE ISO SGS |
Place of Origin | CHINA,QINGDAO |
View Detail Information
Explore similar products
Wide Span Steel Frame Building Construction Prefab Metal Storage Buildings
Fast Assemble Steel Frame Warehouse Prefabricated Steel Warehouse Buildings
Lightweight Prefab Small Buildings Industrial Commercial Easy Transport
Fast Construction Steel Frame Building Construction With Aluminum Or Steel Wood
Product Specification
Payment Terms | T/T | Supply Ability | 10000 tons/month |
Delivery Time | 20-30 works days | Packaging Details | Exported standard packing |
Column & BeamConnection: | High Strength Bolt | Advantage: | Easy & Fast Install |
Use: | Warehouse, Workshop | Roof: | Glass Wool, EPS, PU |
Material: | Steel, Purlin, Column | Surface Treatment: | Painted Or Galvanized |
Brand Name | YDX | Model Number | YDX-5DG |
Certification | CE ISO SGS | Place of Origin | CHINA,QINGDAO |
High Light | Galvanized Prefab Steel Workshop Construction ,Prefab Steel Workshop Construction ,Custom Prefab Steel Workshop Construction |
Galvanized Spray Coated Prefab Steel Workshop Custom Construction
Steel structure workshops save costs due to several reasons:
Material Efficiency:
Steel offers a high strength-to-weight ratio, reducing the quantity of material required for construction compared to heavier materials like concrete.
Quicker Construction:
Assembly of steel structures is faster than traditional construction methods, resulting in reduced labor costs and shorter construction periods.
Design Flexibility:
Steel allows for versatile designs and modifications, minimizing wastage and enabling efficient utilization of materials during construction.
Lower Foundation Costs:
Steel's lighter weight reduces the need for extensive and costly foundations compared to heavier materials, cutting down on excavation and groundwork expenses.
Long-Term Maintenance Savings:
Steel structures typically require less maintenance and repair, reducing ongoing operational costs over the building's lifespan.
Overall, the efficiency in material use, faster construction, design flexibility, and reduced maintenance contribute to cost savings in steel structure workshop construction.
Product Application | |||
Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
2. Surface: Hot Dip Galvanized or Painted; | |||
3. Connection: All Bolts Connection; | |||
Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
Wall Purlin | C or Z Section Steel, Q235B | ||
Bracing | Steel Rod, Q235B | ||
Cross Support | Steel Rod, Q235B | ||
Column Support | Angle Steel; Steel Rod; Q235B | ||
Angle Brace | Angle steel,Q235B | ||
Tie Bar | Steel Pipe,Q235B | ||
Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm | ||
2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm; | |||
Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
Window | Aluminum Alloy; PVC; | ||
Downspout | PVC pipe; | ||
Gutter | Galvanized Steel Sheet; Stainless Steel | ||
Ventilator | Stainless Steel Turbine Ventilator | ||
Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
Flash | Color Steel Sheet | ||
Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc |
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
1000-2000
Employee Number:
56~100
Ecer Certification:
Verified Supplier
Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee... Qingdao Yidongxiang Steel Structure Co., Ltd.founded in 2002,The company is an innovative enterprise focusing on the steel structure construction industry which has been engaged in steel structure construction industry for more than 20 years. We are one of the biggest manufacturers of stee...
Get in touch with us
Leave a Message, we will call you back quickly!