| Payment Terms | L/C, D/A, D/P, T/T |
| Typicaluses | Roadways, railways, pedestrian crossings |
| Productname | Steel Arch Bridges |
| Packaging Details | Sea Freight (Container/Bulk Vessel) |
| Loadcapacity | Varies by design, typically up to several thousand tons |
| Designstandards | Complies with international bridge design codes (e.g., AASHTO, Eurocode) |
| Delivery Time | 30-60 Days |
| Material | High-strength low-alloy steel |
| Lead Time | 60 -90 days |
| Corrosionresistance | High, with protective coatings |
| Aestheticoptions | Customizable arch shapes and finishes |
| Supply Ability | 5,000-15,000 MT/Year |
| Standard | ASTM,AISI, EN,JIS |
| Environmentalimpact | Low to moderate, recyclable materials |
| Brand Name | FASEC |
| Model Number | Steel Arch Bridges |
| Place of Origin | China |
| Certification | AISC IBR/ABR, AWS CWI, CE (EN 1090-1 FPC) |
View Detail Information
Explore similar products
AISI Q355 Steel Arch Girder Bridge Continuous Plate Weather Resistant
Heavy Duty Steel Arch Bridges Ready-To-Install Prefab Welding
Bespoke Two Hinged Arch Bridges Three Hinged Galvanized
Prefab Steel Arch Bridge Painted Half Through High Strength
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T | Typicaluses | Roadways, railways, pedestrian crossings |
| Productname | Steel Arch Bridges | Packaging Details | Sea Freight (Container/Bulk Vessel) |
| Loadcapacity | Varies by design, typically up to several thousand tons | Designstandards | Complies with international bridge design codes (e.g., AASHTO, Eurocode) |
| Delivery Time | 30-60 Days | Material | High-strength low-alloy steel |
| Lead Time | 60 -90 days | Corrosionresistance | High, with protective coatings |
| Aestheticoptions | Customizable arch shapes and finishes | Supply Ability | 5,000-15,000 MT/Year |
| Standard | ASTM,AISI, EN,JIS | Environmentalimpact | Low to moderate, recyclable materials |
| Brand Name | FASEC | Model Number | Steel Arch Bridges |
| Place of Origin | China | Certification | AISC IBR/ABR, AWS CWI, CE (EN 1090-1 FPC) |
Precision Steel Arch Bridge Fabrication and Trial Assembly to AWS D1.5 and ASTM A709: custom fabrication of steel arch bridges with factory trial assembly — arch ribs, box beams and decking built to ASTM A709 and welded to AWS D1.5, ensuring dimensional accuracy, fit-up and smooth site erection.
Precision Fabrication: Tight tolerances for camber, sweep and splices
Trial Assembly: Factory pre-assembly to verify geometry and connections
Welding Compliance: AWS D1.5 Bridge Welding Code
Material Standard: ASTM A709 structural steel for bridges
Certified Fabrication: AISC IBR/ABR bridge fabricator, AWS CWI inspection
For overseas bridge projects, steel components travel thousands of kilometres before they ever meet on site. If splices don’t line up or bolt holes don’t match, the fix happens on site — costly, slow and weather-dependent.
Factory trial assembly solves this before a single component leaves the plant. We fit the arch ribs, box beams and connections together on our shop floor, measure every gap, correct every mismatch — then mark, disassemble and ship.
![]()
Why Trial Assembly Matters
| Shipped Without Trial Assembly | Trial-Assembled in Our Factory | |
|---|---|---|
| Site fit-up | Surprises discovered on site | Fit-up verified in advance |
| Camber & sweep | Corrected by trial and error | Checked against shop drawings |
| Splice & hole alignment | Reaming, field welding | Holes match on first try |
| Erection time | Delays and rework | Fast, planned erection |
| Overseas projects | Hard to fix remotely | Components bolt together with no field rework |
Arch ribs — welded steel box sections with longitudinal stiffeners
Box beams / girders — single-cell or multi-cell welded sections
Bridge decking — orthotropic steel deck or composite with concrete slab
Cross beams, hangers, bracing and base plates — welded or bolted connections
AWS D1.5 — Bridge Welding Code: WPS/PQR, certified welders, inspection
ASTM A709 — Structural steel, Grade 50 / 50W / HPS 70W as specified
AISC IBR/ABR — Certified Bridge Fabricator for major bridge work
AWS CWI — inspection on all welding; AISC FCE fracture-control endorsement on request
![]()
Drawings in — Shop drawings prepared with camber, sweep and splice details.
Fabrication — ASTM A709 steel cut, formed and welded to AWS D1.5.
Trial assembly on the shop floor — Segments fitted, measured and marked as they will go up on site.
Disassembled, packed, shipped — Every piece numbered for its erection sequence.
Each shipment carries: Mill Test Reports, WPS/PQR, welder certificates, weld maps, NDT reports, trial assembly records, as-built shop drawings and packing list — ready for your project file.
At Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuilding), we bring over 20 years of experience in steel bridges and steel structures and exports to more than 100 countries and regions, specialising in steel bridges, factory buildings, trusses, composite floor decking and custom steel components. When you work with us, you get:
AWS D1.5 & ASTM A709 compliant fabrication — documented and traceable
AISC IBR/ABR certified factory with AWS CWI inspection
Factory trial assembly — your bridge fits together before it ships
OEM/ODM — built to your drawings, not from a catalog
Export packing and worldwide shipping with full logistics support
Send us your drawings and required standard today for a free quotation and technical proposal — Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuilding) is ready to build your precision steel arch bridge, right the first time.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
80000000-100000000
Employee Number:
1200~1500
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!