Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
{"title":"Steel Box Girder Bridge | Engineered to Global International Design Codes","imgUrl":"https:\/\/img.chinax.com\/nimg\/24\/20\/120dd9c6dfd3186ac6ffe1efdd05-200x200-1\/steel_box_girder_bridge_7c_engineered_to_global_international_design_codes.jpg","attrs":{"Model Number":"Steel Girder Bridge","Customization":"Customized to project requirements (span, width, load, site conditions)","Minimum Order Quantity":"100 MT","Delivery Time":"30-60 Days"}}
{"title":"AASHTO LRFD Compliant Weather\u2011Resistant Box Girder Steel Bridge with Heavy","imgUrl":"https:\/\/img.chinax.com\/nimg\/27\/d5\/518824995f4652f3e9e9288a64dd-200x200-1\/aashto_lrfd_compliant_weather_e2_80_91resistant_box_girder_steel_bridge_with_heavy_galvanized_coating.jpg","attrs":{"Model Number":"Steel Girder Bridge","Customization":"Customized to project requirements (span, width, load, site conditions)","Minimum Order Quantity":"100 MT","Delivery Time":"30-60 Days"}}
{"title":"Modular Steel Box Girder Bridge System \u2013 Fast Installation, Easy Maintenance","imgUrl":"https:\/\/img.chinax.com\/nimg\/89\/63\/d18d8f442a65f1506cd0d1d8b3e5-200x200-1\/modular_steel_box_girder_bridge_system_e2_80_93_fast_installation_2c_easy_maintenance.jpg","attrs":{"NDT Inspection":"100% UT for FCM welds; MT\/PT as required","Price":"USD 1,000-1,500\/MT","Payment Terms":"L\/C, D\/A, D\/P, T\/T","Deck Type":"Orthotropic steel deck \/ Concrete composite deck"}}
{"title":"ISO 3834\/AWS D 1.5\/EN 1090 Certified Box Girder Steel Bridge Fabricator","imgUrl":"https:\/\/img.chinax.com\/nimg\/f8\/cc\/3390b9eea21a3f86f89abea29c7f-200x200-1\/iso_3834_2faws_d_1_5_2fen_1090_certified_box_girder_steel_bridge_fabricator.jpg","attrs":{"Model Number":"Steel Girder Bridge","Customization":"Customized to project requirements (span, width, load, site conditions)","Corrosion Protection":"Hot-dip galvanizing (ASTM A123), epoxy coating, weathering steel","Certification":"ISO 9001; EN 1090-1 FPC; CE; AWS CWI; AISC IBR\/ABR"}}
Highway reconstruction, railway crossings, municipal engineering, curved bridges, industrial infrastructure
Place of Origin
China
Certification
ISO 9001; EN 1090-1 FPC; CE; AWS CWI; AISC IBR/ABR
Brand Name
FASEC
Model Number
Steel Girder Bridge
This AASHTO LRFD20 Certified Box Girder Steel Bridge with AWS D1.5M Standard Welding Process is a full shop-fabricated steel bridge superstructure solution. Engineered for high-standard global infrastructure projects, it combines AASHTO LRFD20 load resistance design principles with AWS D1.5M standardized welding technology.
All units are custom engineered according to actual span, width, load rating and environmental requirements. It features stable structural performance, excellent fatigue resistance and rapid on-site assembly, effectively balancing construction efficiency, structural safety and long-term economic benefits.
Dual Certification – AASHTO LRFD20 & AWS D1.5M
We strictly implement two core international bridge engineering standards to ensure overall project safety and compliance:
AASHTO LRFD20
Adopts professional Load and Resistance Factor Design methodology. All flanges, webs, stiffeners and diaphragms are precisely calculated to resist HL-93 live load, fatigue load, temperature deformation and seismic load. Fracture-critical member (FCM) design specifications are strictly followed, and matching shear connectors ensure full composite action between steel girder and concrete deck.
AWS D1.5M
Standardizes the full set of bridge welding procedures, welder qualification and inspection standards. Clause 12 regulates enhanced NDT requirements for fracture-critical welds, implementing 100% ultrasonic testing (UT). All production processes are supervised by AWS Certified Welding Inspectors (CWI). Different from ordinary AWS D1.1 structural welding standards, it meets stricter bridge fatigue and fracture resistance requirements.
Dual standard certification ensures global project compliance, controllable quality and low engineering risk.
Engineering Performance Advantages
Compared with traditional I-girder and plate girder bridges, our box girder bridge has obvious mechanical and engineering advantages:
High Lateral Stability: Greatly reduces temporary bracing demand during construction and improves overall wind and seismic resistance.
Flexible Span Design: Girder height ranges from 0.8m to 3.5m; single span reaches 6m–50m, continuous span supports up to 8 spans for diverse road layouts.
Superior Fatigue Resistance: Optimized welding details and stress transition structure withstand millions of cyclic loads, supporting 75–100 years long design life.
High Material Utilization: Adopts ASTM A709 50W / HPS 70W high-performance steel, realizing high strength with light self-weight, lowering foundation and overall project cost.
Customizable Technical Parameters
Parameter
Standard Range / Options
Design Life
75 – 100 years
Span Configuration
Single span: 6m – 50m; Continuous span: up to 8 spans
Bridge Overall Width
2m – 24m (fully customizable)
Girder Depth
0.8m – 3.5m, customized per span and load conditions
Steel Material Grade
ASTM A709 (36/50/50W/HPS 70W), ASTM A572
Deck Type
Orthotropic steel deck / Concrete composite deck with shear studs
All bridge modules are precisely fabricated in closed factory workshops with standardized quality control:
Precision Material Processing: CNC plasma cutting, automatic beveling and plate straightening to ensure perfect assembly accuracy.
Automatic Welding Technology: Adopts SAW and GMAW automatic welding for main seams, ensuring stable welding quality and ultra-low defect rate.
Full-process In-process Inspection: Visual and dimensional inspection for all tack welds, root passes and final welding passes.
Professional NDT Testing: 100% UT detection for all FCM welds; MT/PT testing for key structural parts; RT testing available on request.
Pre-assembly & Camber Calibration: Pre-set professional camber to offset dead load deflection; full shop pre-assembly before delivery to guarantee on-site fitting.
Complete Quality Documents: Provide official MTRs, WPS, PQR and full inspection records.
Our factory is ISO 9001 certified, and supports third-party inspection by SGS, BV, TÜV and other authoritative institutions.
Logistics, Delivery & On-Site Support
We provide one-stop full-cycle service from production to project completion:
Customized Transportation Scheme: Module single segment length 10m–30m, adaptable for road, railway and barge transportation to meet international shipping limits.
Professional Erection Plan: Provide detailed lifting scheme, erection sequence and temporary support layout guide.
On-site Technical Supervision: Professional technicians guide module positioning, connection assembly and deck construction.
Post-installation Testing: Support final on-site NDT inspection and load testing to ensure qualified traffic opening.
Conclusion
Our AASHTO LRFD20 Certified Box Girder Steel Bridge with AWS D1.5M Standard Welding Process is a mature, high-reliability modular steel bridge solution. With dual international standard certification, superior structural performance, factory prefabrication efficiency and long service life, it is widely used in highway reconstruction, railway crossing, municipal engineering and industrial infrastructure projects worldwide.
We provide personalized design, accurate budget estimation and standardized fabrication schedule according to your project span, width, load standard and site conditions. Contact us for professional bridge engineering solutions and reliable long-term infrastructure support.
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...