China factories

Chat Now Send Email
China factory - Hangzhou FAMOUS Steel Engineering Company

Hangzhou FAMOUS Steel Engineering Company

  • China,Hangzhou ,Zhejiang
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths
China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths

  1. China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths
  2. China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths
  3. China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths
  4. China Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths

Deep Composite Floor Decking – ComFlor 210 Alternative for Extended Bay Widths

  1. MOQ: 1000 MT
  2. Price: USD 12-20/SQM
  3. Get Latest Price
Delivery Time 10-30 Days
Customization Customized to customer requirements
Surface Finish Hot-dip galvanized
Packaging Details Sea Freight (Container/Bulk Vessel)
Payment Terms L/C, D/A, D/P, T/T
Application Large bay-width buildings, commercial high-rises, parking structures, industrial facilities
Logistics Nestable profile, higher container loading
Material High-strength galvanized steel
Supply Ability 2,000 – 5,000 MT/month
Product Name Composite Steel Floor Deck
Model Number Composite Floor Deck
Certification ISO 9001; CE (EN 1090-1); BES 6001; EPD
Brand Name FASEC
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Delivery Time 10-30 Days Customization Customized to customer requirements
Surface Finish Hot-dip galvanized Packaging Details Sea Freight (Container/Bulk Vessel)
Payment Terms L/C, D/A, D/P, T/T Application Large bay-width buildings, commercial high-rises, parking structures, industrial facilities
Logistics Nestable profile, higher container loading Material High-strength galvanized steel
Supply Ability 2,000 – 5,000 MT/month Product Name Composite Steel Floor Deck
Model Number Composite Floor Deck Certification ISO 9001; CE (EN 1090-1); BES 6001; EPD
Brand Name FASEC Place of Origin China
The ComFlor 210 Alternative Deep Composite Floor Decking is a high-performance structural flooring system tailored for large bay-width steel-framed buildings. Featuring a specialized deep profile, it enables wider column spacing to create spacious, column-free interior areas while drastically reducing the number of supporting beams. Manufactured from premium high-strength galvanized steel, it delivers outstanding long-span capability, stable concrete composite action and dependable fire resistance. Highly versatile, it is widely applicable for commercial high-rises, parking structures and industrial facilities, perfectly accommodating construction projects requiring flexible and extended bay-width designs.
 
comflor2101
 

Extended Bay Widths – Maximizing Design Flexibility​

ComFlor 210 Alternative deep deck profile achieves longer spans between supporting beams, allowing engineers to adopt wider column grids and flexible floor plates. Lifting internal column quantities expands usable space and improves layout freedom. The optimized rib geometry and integral stiffeners supply sufficient rigidity for long spans with economical material consumption.
 

Material Quality & Corrosion Protection​
 
Produced from high-strength galvanized steel with guaranteed minimum yield strength, ComFlor 210 Alternative maintains stable structural performance in harsh construction environments. The heavy-duty zinc coating offers full corrosion protection, preserving structural integrity during construction and long-term operation. The durable surface avoids extra anti-corrosion treatment, lowering initial investment and maintenance costs.​

 

Technical Specifications​​
 
 
Aspect Details
Steel Grade High-strength galvanized steel with guaranteed minimum yield strength
Coating Protection Heavy hot-dip galvanized finish for superior corrosion resistance
Profile Type Deep composite deck with cross and longitudinal stiffeners
Fire Resistance Up to 2 hours with unprotected soffit; 60 minutes without fire protection
Reinforcement System Single bar in each trough plus anti-crack mesh near slab top
Composite Action Excellent bond with concrete for efficient load transfer
Design Standards Complies with internationally recognized structural standards
Service Integration Services can be routed between deck ribs within slab depth
 
comflor21011
 
Integrated Service Routing – Optimizing Floor Zones​​
 
The ComFlor 210 Alternative features a deep profile that allows all building MEP services to be installed within the deck ribs and fully concealed inside the slab depth, rather than beneath the floor structure. This unique design effectively reduces overall floor zone height, maximizes clear floor-to-ceiling space, and simplifies coordination between structural and MEP engineering teams. By optimizing vertical space utilization, it delivers superior spatial efficiency and is perfectly suited for all types of multi-storey building construction.
 

Structural Efficiency & Composite Action​​
 
Equipped with integrated cross and longitudinal stiffeners, the ComFlor 210 Alternative delivers exceptional structural efficiency and stable composite performance with cast-in-place concrete slabs. Acting as permanent formwork during construction and serving as continuous tensile reinforcement for the finished floor system, the deck ensures uniform concrete coverage and standardized rebar layout. This optimized profile reliably meets structural strength and fire resistance requirements. Compared with conventional flooring solutions, its superior composite performance enables longer clear spans while significantly reducing both steel and concrete consumption.
 

Fire Performance – Proven Protection​​​​​
 
ComFlor 210 Alternative possesses inherent fire resistance. It reaches a 60-minute fire rating without fire protection on steelwork or deck. Proper slab thickness and reinforcement arrangement help achieve ratings of up to 2 hours with unprotected soffit. Fire design takes tensile performance of trough reinforcement and surface anti-crack mesh into consideration, meeting mainstream international building code requirements.
 

Construction Efficiency & Site Benefits​​

ComFlor 210 Alternative deep deck supports fast on-site installation. Panels are lightweight for easy handling while retaining long-span structural capacity. The deck forms an immediate safe working platform for follow-up construction works. Nestable profile cuts transportation volume and logistics cost, and the 50mm minimum end bearing simplifies positioning on supporting steel structures.
 

Why Choose ComFlor 210 Alternative ​for Extended Bay Width Projects?​​
 

Ideal for projects requiring wider column spacing, flexible floor layouts and shallow structural depth, the ComFlor 210 Alternative Deep Composite Decking serves as a highly reliable structural solution. Combining superior long-span capability, integrated MEP service routing and up to 2-hour fire resistance, the system fully satisfies modern building standards for structural stability, design flexibility and construction efficiency.

Get in touch with us today for your extended bay width project consultation. Our professional technical team offers full support including load and span calculation, customized design solutions and professional construction guidance, ensuring the decking system maintains stable, high-performance operation from installation to long-term service.

 

comflor2107

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company,Seller

  • Year Established:

    2002

  • Total Annual:

    80000000-100000000

  • Employee Number:

    1200~1500

  • Ecer Certification:

    Verified Supplier

  As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.   Nowadays, under FASECBuildings Group, there are...   As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.   Nowadays, under FASECBuildings Group, there are...

+ Read More

Get in touch with us

  • Reach Us
  • Hangzhou FAMOUS Steel Engineering Company
  • Huafeng Road 2#, Gongsu District, Hangzhou City, Zhejiang China
  • https://www.steelfabricat.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement