Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
{"title":"Bespoke Two Hinged Arch Bridges Three Hinged Galvanized","imgUrl":"https:\/\/img.chinax.com\/nimg\/5b\/b5\/437be9703c4abcbae963a44e59e7-200x200-1\/bespoke_two_hinged_arch_bridges_three_hinged_galvanized.jpg","attrs":{"Brand Name":"FMS","Certification":"ISO 9001; ISO 14001; CE;","Place of Origin":"China","Minimum Order Quantity":"30mts"}}
{"title":"Hot-dip Galvanized AASHTO LRFD Steel Arch Bridge for Coastal Traffic Infrastruct","imgUrl":"https:\/\/img.chinax.com\/nimg\/d0\/fa\/9ed109fab414beaa1a9571b02371-200x200-1\/hot_dip_galvanized_aashto_lrfd_steel_arch_bridge_for_coastal_traffic_infrastructure.jpg","attrs":{"Design Standard":"AASHTO LRFD Bridge Design Specifications","Customization":"Customized to project requirements","Applications":"Urban transport infrastructure, long-span bridges","Model Number":"Steel Arch Bridges"}}
ISO 9001; AWS D1.5M Certified; AWS CWI; AISC IBR/ABR
Model Number
Steel Arch Bridges
Brand Name
FASEC
The Large Span AASHTO LRFD Steel Arch Bridge is a high-performance, shop-fabricated superstructure system engineered for urban transport projects requiring long clear spans and rapid construction in space-constrained city environments. The steel arch configuration relies on compression as the primary load-transfer mechanism, making it one of the most material-efficient bridge solutions for medium and long-span applications. Designed to AASHTO LRFD and fabricated under AWS D1.5M, the bridge adopts closed-box arch ribsto achieve outstanding structural strength and stability. Supplied as fully prefabricated modules with bolted field connections, it enables accelerated installation, reduces traffic disturbance, and satisfies North American regulatory requirements for dense urban construction.
AASHTO LRFD Compliance – The U.S. Highway Standard
Design Method:Load and Resistance Factor Design (LRFD); all strength, service, fatigue and extreme limit states fully verified.
Design Load:HL-93 (design truck + lane load) – mandatory baseline load standard of AASHTO.
Steel Design: Designed in accordance with AASHTO LRFD Section 6, covering flexure, shear, combined loading, fatigue and fracture control.
Seismic Design: Compliant with AASHTO LRFD seismic provisions, suitable for steel arch structures.
Design Life:75 – 100+ years under regular maintenance.
AWS D1.5M Welding Certification
Code Standard:AASHTO/AWS D1.5M Bridge Welding Code, more stringent than general AWS D1.1.
Fracture-Critical Members:100% ultrasonic testing (UT) implemented for all primary load-carrying welds.
Production Personnel: All welders hold AWS certification; Certified Welding Inspectors (CWIs) supervise the whole fabrication process.
NDT Inspection:UT for full-penetration welds; supplementary MT/PT inspection arranged where required.
Attractive visual effect – sleek modern profile for landmark urban signature bridges
Prefabrication – Built for Urban Environments
100% shop fabricated – all components manufactured under controlled factory conditions.
Full factory preassembly – complete dimensional matching verification before shipment to avoid on-site rework.
Modular segmented design – convenient for highway or barge transportation within urban zones.
Bolted field joints – eliminates field welding, avoids construction delays caused by poor weather and cuts site manpower demand.
Short erection cycle – finished within days or weeks instead of months, greatly easing traffic pressure in crowded urban areas.
Quality Assurance
Raw Material: Certified ASTM A709 steel with complete Mill Test Reports (MTRs).
Welding Works: Completed by AWS-certified welders; all WPS/PQR qualified per AWS D1.5M.
NDT Control:100% UT inspection for primary load-carrying welds; MT/PT carried out as needed.
Preassembly:Full one-side preassembly to validate all connection interfaces.
Surface Treatment: Industrial blast cleaning followed by epoxy paint or hot-dip galvanizing coating.
Third-Party Audit: Supports inspection by SGS, Bureau Veritas or client-appointed organizations.
Technical Documents: Full document package including design calculations, MTRs, WPS/PQR, NDT reports and as-built drawings.
Conclusion – Large Span, Urban Ready, AASHTO Certified
The Large Span AASHTO LRFD Steel Arch Bridge combines high structural efficiency, long-span performance and fast-track installation for urban transport infrastructure projects. Supported by AASHTO LRFD, AWS D1.5M standards and mature closed-box arch technology, this bridge system offers key merits:
• Full AASHTO LRFD compliance, accepted by authorities across North America
• Rapid construction via prefabricated bolt-connected modules
• Less disruption to public traffic, ideal for densely built urban regions
• Reliable long-term performance with a 75 – 100+ year design lifespan
• Comprehensive compliance documentation to accelerate project approval
Send us your project requirements– span, width, site conditions. We'll provide AASHTO-compliant design, arch configuration, and fixed quotation within 48 hours.
Engineered for long spans, built for cities – your urban bridge solution starts here.
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...