| Material | ASME SA210 GR.C |
| Delivery Time | 50-120 days |
| Bare Tube Diameterr | 16-63mm |
| Application | Industrial Boiler Economizers, Power Plant Boiler Economizers, Waste Heat Recovery Systems, Economizer Replacement and Retrofit Projects |
| Packaging Details | Iron frame wooden case |
| Payment Terms | T/T,L/C |
| Fin Height | <17mm |
| Product | Wound Fin Tube |
| Package | Iron frame wooden case |
| Fin Pitch | 2.1-5mm |
| Supply Ability | 5000 meters/day |
| Fin Thickness | 0.4mm |
| Model Number | N/A |
| Certification | ISO9001:2015; ISO14001:2015; ISO45001:2018; PED 2014/68/EU; WPS/PQR/WPQ; ISO 3834 |
| Brand Name | YUHONG |
| Place of Origin | China |
View Detail Information
Explore similar products
ASTM A179 Wound Aluminum L Type Fin Tube , Air Cooler, Cooling Tower
Wound L Type Fin Tube ASTM A249 TP304 For Heat Exchanger , Air Cooler
Wound Fin Tube ASME SA210 Gr.A-1 Aluminum ASTM B209 Gr.1060 For Air Cooler ,
Wound Fin Tube ASTM A249 TP321 For Air Cooler , Heat Exchager , Condenser
Product Specification
| Material | ASME SA210 GR.C | Delivery Time | 50-120 days |
| Bare Tube Diameterr | 16-63mm | Application | Industrial Boiler Economizers, Power Plant Boiler Economizers, Waste Heat Recovery Systems, Economizer Replacement and Retrofit Projects |
| Packaging Details | Iron frame wooden case | Payment Terms | T/T,L/C |
| Fin Height | <17mm | Product | Wound Fin Tube |
| Package | Iron frame wooden case | Fin Pitch | 2.1-5mm |
| Supply Ability | 5000 meters/day | Fin Thickness | 0.4mm |
| Model Number | N/A | Certification | ISO9001:2015; ISO14001:2015; ISO45001:2018; PED 2014/68/EU; WPS/PQR/WPQ; ISO 3834 |
| Brand Name | YUHONG | Place of Origin | China |
ASME SA-210 Gr.C wound finned tubes are designed for boiler economizers and flue gas heat recovery systems. Using SA-210 Gr.C carbon steel as the base tube material, they provide a practical solution for recovering heat from boiler exhaust gas and transferring it to incoming boiler feedwater.
In an economizer, hot flue gas passes over the external finned surface while feedwater flows through the tubes. The wound fins increase the external heat-transfer area, helping improve heat recovery within the available equipment space. This can reduce exhaust heat losses, lower the energy required to raise feedwater temperature, and support more efficient boiler operation.
These tubes are suitable for project-specific economizer designs in industrial boilers, utility boiler systems, and selected waste heat recovery applications. Tube dimensions, fin configuration, material requirements, and inspection criteria should be selected according to the boiler design, operating conditions, and applicable project specifications.
Economizers recover heat from boiler exhaust gas before it leaves the system. Wound finned tubes provide an extended external heat-transfer surface, allowing more heat to be transferred to the feedwater under suitable operating conditions.
Typical applications include:
Industrial steam boilers used in manufacturing plants.
Package boilers and water-tube boiler systems.
Boiler retrofit projects requiring improved heat recovery.
Replacement economizer bundles in existing boiler installations.
Problems addressed: Excessive exhaust heat loss, insufficient heat recovery, and limited space for additional heat-transfer surface.
In power generation, economizers use residual flue gas heat to preheat boiler feedwater before it enters downstream boiler sections. Properly designed finned-tube bundles can help reduce fuel consumption and improve overall thermal efficiency.
Application considerations include flue gas temperature, feedwater inlet temperature, gas velocity, allowable pressure drop, and the risk of low-temperature corrosion.
Wound finned tubes may also be incorporated into suitable waste heat recovery units where hot combustion gases or process exhaust streams are used to heat water or another compatible fluid.
Potential applications include:
Industrial combustion and heating processes.
Exhaust heat recovery from selected industrial furnaces.
Boiler systems with recoverable residual flue gas heat.
Process plants using waste heat to support steam or hot-water generation.
The suitability of SA-210 Gr.C depends on the actual service temperature, pressure, water chemistry, gas composition, and corrosion conditions.
For existing economizers, replacement tubes must match the original equipment design and project requirements. Wound finned tubes can be specified according to the required tube dimensions, fin pitch, fin height, overall length, and connection arrangement.
Before ordering, confirm the original drawings, material grade, fin configuration, operating conditions, and inspection requirements to ensure compatibility with the existing bundle.
Wound fins provide additional surface area for heat exchange between flue gas and the tube-side fluid, supporting compact economizer designs.
SA-210 Gr.C is a carbon steel boiler tube grade intended for specified boiler and superheater service. Its suitability for an economizer depends on the design temperature, pressure, corrosion allowance, and applicable code requirements.
Tube diameter, wall thickness, fin dimensions, fin pitch, tube length, and end preparation can be specified according to approved drawings and project requirements, subject to manufacturing capability.
For replacement projects, matching the original tube geometry and material requirements helps maintain compatibility with the existing economizer assembly.
|
Element |
Requirement (wt.%) |
|---|---|
|
Carbon (C) |
0.35 max. |
|
Manganese (Mn) |
0.29–1.06 |
|
Phosphorus (P) |
0.035 max. |
|
Sulfur (S) |
0.035 max. |
|
Silicon (Si) |
0.10 min. |
|
Property |
Minimum requirement |
|---|---|
|
Tensile strength |
485 MPa |
|
Yield strength |
275 MPa |
|
Elongation |
30%* |
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller,Other
Year Established:
1990
Total Annual:
50M-70M
Employee Number:
50~800
Ecer Certification:
Verified Supplier
Yuhong Holding Group has more than 35 years experience for pipeline products, till now we have 3 big joint venture factories, the total production area more than 130000 square meters, and more than 600 workers with 106 production lines give our clients excellent supporting always. &n... Yuhong Holding Group has more than 35 years experience for pipeline products, till now we have 3 big joint venture factories, the total production area more than 130000 square meters, and more than 600 workers with 106 production lines give our clients excellent supporting always. &n...
Get in touch with us
Leave a Message, we will call you back quickly!