China factories

Chat Now Send Email
China factory - YUHONG HOLDING GROUP CO., LTD

YUHONG HOLDING GROUP CO., LTD

  • China,Ningbo
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China ASME SA-210 Gr.C Wound Finned Tubes for Economizers
China ASME SA-210 Gr.C Wound Finned Tubes for Economizers

  1. China ASME SA-210 Gr.C Wound Finned Tubes for Economizers
  2. China ASME SA-210 Gr.C Wound Finned Tubes for Economizers
  3. China ASME SA-210 Gr.C Wound Finned Tubes for Economizers
  4. China ASME SA-210 Gr.C Wound Finned Tubes for Economizers
  5. China ASME SA-210 Gr.C Wound Finned Tubes for Economizers

ASME SA-210 Gr.C Wound Finned Tubes for Economizers

  1. MOQ: 500kgs
  2. Price: To be discussed
  3. Get Latest Price
Material ASME SA210 GR.C
Delivery Time 50-120 days
Bare Tube Diameterr 16-63mm
Application Industrial Boiler Economizers, Power Plant Boiler Economizers, Waste Heat Recovery Systems, Economizer Replacement and Retrofit Projects
Packaging Details Iron frame wooden case
Payment Terms T/T,L/C
Fin Height <17mm
Product Wound Fin Tube
Package Iron frame wooden case
Fin Pitch 2.1-5mm
Supply Ability 5000 meters/day
Fin Thickness 0.4mm
Model Number N/A
Certification ISO9001:2015; ISO14001:2015; ISO45001:2018; PED 2014/68/EU; WPS/PQR/WPQ; ISO 3834
Brand Name YUHONG
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Material ASME SA210 GR.C Delivery Time 50-120 days
Bare Tube Diameterr 16-63mm Application Industrial Boiler Economizers, Power Plant Boiler Economizers, Waste Heat Recovery Systems, Economizer Replacement and Retrofit Projects
Packaging Details Iron frame wooden case Payment Terms T/T,L/C
Fin Height <17mm Product Wound Fin Tube
Package Iron frame wooden case Fin Pitch 2.1-5mm
Supply Ability 5000 meters/day Fin Thickness 0.4mm
Model Number N/A Certification ISO9001:2015; ISO14001:2015; ISO45001:2018; PED 2014/68/EU; WPS/PQR/WPQ; ISO 3834
Brand Name YUHONG Place of Origin China
Overview

ASME SA-210 Gr.C wound finned tubes are designed for boiler economizers and flue gas heat recovery systems. Using SA-210 Gr.C carbon steel as the base tube material, they provide a practical solution for recovering heat from boiler exhaust gas and transferring it to incoming boiler feedwater.

In an economizer, hot flue gas passes over the external finned surface while feedwater flows through the tubes. The wound fins increase the external heat-transfer area, helping improve heat recovery within the available equipment space. This can reduce exhaust heat losses, lower the energy required to raise feedwater temperature, and support more efficient boiler operation.

These tubes are suitable for project-specific economizer designs in industrial boilers, utility boiler systems, and selected waste heat recovery applications. Tube dimensions, fin configuration, material requirements, and inspection criteria should be selected according to the boiler design, operating conditions, and applicable project specifications.

Application & Compliance
1. Industrial Boiler Economizers

Economizers recover heat from boiler exhaust gas before it leaves the system. Wound finned tubes provide an extended external heat-transfer surface, allowing more heat to be transferred to the feedwater under suitable operating conditions.

Typical applications include:

  • Industrial steam boilers used in manufacturing plants.

  • Package boilers and water-tube boiler systems.

  • Boiler retrofit projects requiring improved heat recovery.

  • Replacement economizer bundles in existing boiler installations.

Problems addressed: Excessive exhaust heat loss, insufficient heat recovery, and limited space for additional heat-transfer surface.

2. Power Plant Boiler Economizers

In power generation, economizers use residual flue gas heat to preheat boiler feedwater before it enters downstream boiler sections. Properly designed finned-tube bundles can help reduce fuel consumption and improve overall thermal efficiency.

Application considerations include flue gas temperature, feedwater inlet temperature, gas velocity, allowable pressure drop, and the risk of low-temperature corrosion.

3. Waste Heat Recovery Systems

Wound finned tubes may also be incorporated into suitable waste heat recovery units where hot combustion gases or process exhaust streams are used to heat water or another compatible fluid.

Potential applications include:

  • Industrial combustion and heating processes.

  • Exhaust heat recovery from selected industrial furnaces.

  • Boiler systems with recoverable residual flue gas heat.

  • Process plants using waste heat to support steam or hot-water generation.

The suitability of SA-210 Gr.C depends on the actual service temperature, pressure, water chemistry, gas composition, and corrosion conditions.

4. Economizer Replacement and Retrofit Projects

For existing economizers, replacement tubes must match the original equipment design and project requirements. Wound finned tubes can be specified according to the required tube dimensions, fin pitch, fin height, overall length, and connection arrangement.

Before ordering, confirm the original drawings, material grade, fin configuration, operating conditions, and inspection requirements to ensure compatibility with the existing bundle.

Key Product Advantages
Increased External Heat-Transfer Area

Wound fins provide additional surface area for heat exchange between flue gas and the tube-side fluid, supporting compact economizer designs.

Carbon Steel Base Tube

SA-210 Gr.C is a carbon steel boiler tube grade intended for specified boiler and superheater service. Its suitability for an economizer depends on the design temperature, pressure, corrosion allowance, and applicable code requirements.

Flexible Project Configuration

Tube diameter, wall thickness, fin dimensions, fin pitch, tube length, and end preparation can be specified according to approved drawings and project requirements, subject to manufacturing capability.

Practical Maintenance and Replacement

For replacement projects, matching the original tube geometry and material requirements helps maintain compatibility with the existing economizer assembly.

Chemical Composition — SA-210 Gr.C

Element

Requirement (wt.%)

Carbon (C)

0.35 max.

Manganese (Mn)

0.29–1.06

Phosphorus (P)

0.035 max.

Sulfur (S)

0.035 max.

Silicon (Si)

0.10 min.

Mechanical Properties — SA-210 Gr.C

Property

Minimum requirement

Tensile strength

485 MPa

Yield strength

275 MPa

Elongation

30%*


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company,Seller,Other

  • Year Established:

    1990

  • Total Annual:

    50M-70M

  • Employee Number:

    50~800

  • Ecer Certification:

    Verified Supplier

Yuhong Holding Group has more than 35 years experience for pipeline products, till now we have 3 big joint venture factories,  the total production area more than 130000 square meters, and more than 600 workers with 106 production lines give our clients excellent supporting always. &n... Yuhong Holding Group has more than 35 years experience for pipeline products, till now we have 3 big joint venture factories,  the total production area more than 130000 square meters, and more than 600 workers with 106 production lines give our clients excellent supporting always. &n...

+ Read More

Get in touch with us

  • Reach Us
  • YUHONG HOLDING GROUP CO., LTD
  • 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
  • https://www.steelfintube.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement