Products
Manufacturer of a wide range of products which include 3ft x 6ft 8in Snap-On Walk-Thru Scaffolding Frame with Galvanized Light Steel,Customizable Thickness Powder Coated H Frame Scaffolding with High Load Bearing,Heavy Duty Steel ...
MOQ: 100 PCS
Price: $5-15
| Payment Terms | T/T |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Main Structure | Galvanized Light Steel Frames |
| Earthquake Resistance | Strong |
| Drawing Design | by us |
| Application | Commercial, Industrial, Residential |
| Windresistance | Up to 60 m/s wind speed |
| Span | Customizable, typically 10-40 meters |
| Wall Cladding | Sanwich Panel, single sheet |
| Foundation | Concrete foundation |
| Structuralsystem | Load-bearing steel frame |
| Rooftype | Metal roofing |
| Warranty | 5 Years |
| Constructionspeed | Fast |
| Loadcapacity | Up to 500 kg/m² |
| Insulation | Optional thermal insulation |
| Design Load | Wind, Snow, Seismic |
| Brand Name | Shunyao Supply Chain |
| Place of Origin | Chengdu , China |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Raw Steel Material | Q235B, Q355B, ASTM A36 |
| Product Insulation | Thermal and Sound Insulation |
| Cost | Moderate to High |
| Walltype | Steel panels |
| Shipment By | Container |
| Load Bearing Capacity | High |
| Life Span | 50-70 Years |
| Spancapability | Wide spans possible |
| Buildingheight | Customizable, typically 4-12 meters |
| Steel Frame | Welding Plates |
| Thermalinsulation | Moderate |
| Drawing Design | AUTOCAD, SOLIDWORKS, TEKLA |
| Usage | Commercial, Industrial, Residential |
| Material Grade | Q355B, Q235B |
| Production | Finished for direct install support |
| Brand Name | Chengdu , China |
| Place of Origin | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Applications | Warehouses, factories, workshops, storage facilities |
| Frametype | Steel frame |
| Installationtime | Rapid assembly, typically weeks |
| Loadcapacity | Designed for heavy industrial loads |
| Spanwidth | Up to 60 meters |
| Length | Customizable based on project requirements |
| Walltype | Steel panel walls |
| Structure | Pre-engineered metal building |
| Buildingheight | Customizable, typically 4-12 meters |
| Material | High-strength steel |
| Rooftype | Sloped or flat steel roof |
| Productname | Industrial Steel Frame Building |
| Finish | Galvanized or painted steel |
| Fireresistance | Fire-resistant steel structure |
| Insulation | Optional thermal and acoustic insulation |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price:
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Corrosion Resistance | High |
| Sustainability | Eco-friendly |
| Connection | Bolts |
| Installationtime | Typically 1-3 weeks |
| Insulation | Optional thermal and sound insulation |
| Raw Steel Material | Q235B, Q355B, |
| Connection Type | Bolts |
| Installation Time | 1-3 weeks |
| Insulation Type | Optional thermal and sound |
| Main Plate Material | Q235B carbon structural steel |
| Load-bearing Material | Q355B low alloy steel |
| Accessory Material | 45# steel |
| Surface Treatment | Shot blasting derusting (Sa2.5 Grade) + epoxy zinc-rich primer + polyurethane topcoat/hot-dip galvanizing |
| Feature | High Strength, Easily Assembled, Reusable |
| Function | Construction Concrete Support |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Building height | Customizable |
| Installation time | 2-4 weeks |
| Length | Customizable |
| Foundation type | Concrete foundation |
| Fire resistance | High |
| Corrosion resistance | Galvanized or painted steel |
| Wall material | Steel panels, insulated panels, or sandwich panels |
| Roof type | Gable, flat, or curved |
| Material grade | Q355B, Q235B |
| Load capacity | High load-bearing capacity |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
| Certification | CE,ISO |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Usage | Warehouses, factories, workshops, storage facilities |
| Fireresistance | Fire-resistant steel |
| Buildingtype | Industrial |
| Frametype | Steel frame |
| Productname | Industrial Steel Frame Building |
| Installationtime | Fast assembly, typically weeks |
| Rooftype | Metal roof panels |
| Buildingheight | Customizable, typically 4-12 meters |
| Insulation | Optional thermal insulation |
| Spanwidth | Customizable, typically 10-40 meters |
| Walltype | Steel wall panels |
| Corrosionprotection | Galvanized steel with anti-corrosion coating |
| Foundationtype | Concrete foundation |
| Material | High-strength steel |
| Structure | Prefabricated |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Structure | Rigid frame or portal frame |
| Foundationtype | Concrete foundation |
| Frametype | Steel frame |
| Spanwidth | Up to 60 meters |
| Rooftype | Metal roofing panels |
| Usage | Warehouses, factories, workshops, storage |
| Corrosionprotection | Galvanized or painted steel |
| Productname | Industrial Steel Frame Building |
| Insulation | Optional thermal insulation |
| Fireresistance | Fire-resistant steel |
| Walltype | Steel wall panels or insulated panels |
| Length | Customizable |
| Buildingheight | Customizable, typically 4-12 meters |
| Material | High-strength steel |
| Installationtime | Fast assembly, typically weeks |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price:
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Productname | Concrete Tunnel Formwork |
| Weight | Varies depending on size and material thickness |
| Compatibility | Compatible with standard scaffolding systems |
| Installationtime | Reduced construction time compared to traditional formwork |
| Loadcapacity | High load-bearing capacity |
| Durability | Corrosion-resistant and long-lasting |
| Material | Steel |
| Customizationoptions | Available in various sizes and shapes to fit project needs |
| Formworktype | Tunnel |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price:
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Formwork type | Tunnel |
| Installation time | Reduced installation time compared to traditional formwork |
| Assembly method | Modular and easy to assemble/disassemble |
| Product name | Concrete Tunnel Formwork |
| Reusability | Reusable multiple times |
| Weight | Varies depending on size and material |
| Load capacity | High load-bearing capacity |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price:
| Payment Terms | T/T in advance |
| Packaging Details | Bundles |
| Delivery Time | 5-15 days |
| Supply Ability | Excellent |
| Connection | Bolts |
| Labor Costs | Lower |
| Maintenance Costs | Reduced |
| Maintenance | Low maintenance required |
| Material Grade | Q355B, Q235B |
| Environmentalimpact | Recyclable materials |
| Size | Customized |
| Application | Industrial/Commercial |
| Corrosion Resistance | High |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!