| Design Software | PKPM, Tekla structures, CAD |
| Design Load | Wind, Snow, Seismic |
| File Formats | Dwg and Pdf |
| Seismicresistance | Good |
| Length | Customizable, unlimited |
| Working Scope | Design,Fabrication, Installation |
| Structural Form | Grid Steel Structure |
| Shipment By | Container |
| Cost | Moderate to High |
| Purlins | Galvanized C and Z section steel |
| Material Grade | Q355B, Q235B |
| Window | Aluminum Alloy/Plastic Steel |
| Constructionspeed | Fast |
| Labor Costs | Lower |
| Sand Blasting | Sa 2.5 |
| Durability | High |
| Size | Customized |
| Product | Steel Structure |
| Maintenance Costs | Reduced |
| Insulation | EPS, Glasswool, Rockwool, PU On Option |
| Wall Color | White, Blue, Optional Colors |
| Application | General shopping mall |
| Wallmaterial | Steel Panels/Insulated Panels |
| Manure Removal System | Horizontal and oblique manure removal |
| Sustainability | Recyclable |
| Buildinglength | Customizable |
| Place Of Production | China |
| Packaging Details | Bundles |
| Delivery Time | 5-8 WEEKS |
| Supply Ability | 15000TONS |
| Payment Terms | T/T in advance,L/C,D/P,T/T,D/A |
| Designflexibility | High |
| Loadcapacity | High |
| Certification | CE,ISO |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
View Detail Information
Explore similar products
Building Galvanized Prefab Steel Structure for Farm Storage
Wind Resistant Prefabricated Steel Frame Building with CE Certification for
Wind Resistance Commercial Steel Structure For Prefabricated Commercial Projects
Commercial Prefabricated Steel Structures Withstand Strong Winds / Gusts
Product Specification
| Design Software | PKPM, Tekla structures, CAD | Design Load | Wind, Snow, Seismic |
| File Formats | Dwg and Pdf | Seismicresistance | Good |
| Length | Customizable, unlimited | Working Scope | Design,Fabrication, Installation |
| Structural Form | Grid Steel Structure | Shipment By | Container |
| Cost | Moderate to High | Purlins | Galvanized C and Z section steel |
| Material Grade | Q355B, Q235B | Window | Aluminum Alloy/Plastic Steel |
| Constructionspeed | Fast | Labor Costs | Lower |
| Sand Blasting | Sa 2.5 | Durability | High |
| Size | Customized | Product | Steel Structure |
| Maintenance Costs | Reduced | Insulation | EPS, Glasswool, Rockwool, PU On Option |
| Wall Color | White, Blue, Optional Colors | Application | General shopping mall |
| Wallmaterial | Steel Panels/Insulated Panels | Manure Removal System | Horizontal and oblique manure removal |
| Sustainability | Recyclable | Buildinglength | Customizable |
| Place Of Production | China | Packaging Details | Bundles |
| Delivery Time | 5-8 WEEKS | Supply Ability | 15000TONS |
| Payment Terms | T/T in advance,L/C,D/P,T/T,D/A | Designflexibility | High |
| Loadcapacity | High | Certification | CE,ISO |
| Place of Origin | Chengdu , China | Brand Name | Shunyao Supply Chain |
| High Light | Wind Resistant Prefabricated Steel Buildings ,Commercial Prefabricated Steel Buildings ,Office Steel Prefab Buildings | ||
| Technical Parameter | Estimated Specifications (Typical 4,000 ㎡ Project) |
|---|---|
| Dimensions (L * W * H) | 80m (Length) * 50m (Width) * 8m (Eave Height) |
| Total Floor Area | 4,000 Square Meters (SQM) |
| Structure Type | Pre-Engineered Building (PEB) / Portal Frame System |
| Clear Span Design | Double Span (25m + 25m) with middle columns for cost-efficiency |
| Column/Bay Spacing | 8 meters (Total 10 bays) |
| Primary Steel Frame | Welded H-Section Columns & Beams (Steel Grade: Q355B / ASTM A572 Gr.50) |
| Secondary Structure | C/Z Section Purlins, Tie Rods, Knee Bracing (Steel Grade: Q235B) |
| Roof & Wall Cladding | 50mm Rockwool Sandwich Panels (Excellent fireproofing & insulation) |
| Design Load Standards | Wind Load: 0.50 kN/㎡ (Up to 150 km/h) | Earthquake Resistance: Grade 8 |
| Surface Treatment | Ball blasting (Sa2.5) + 2x Anti-rust Primer + 2x Finish Paint (Total DFT: 100μm) |
| Building Area | Span Type | Est. Total Steel Weight | Est. 40'HQ Containers Required | Est. Installation Time |
|---|---|---|---|---|
| 1,000 ㎡ | Clear Span (No middle columns) | 35 - 40 Tons | 2 - 3 Containers | 15 - 20 Days |
| 2,500 ㎡ | Clear Span (No middle columns) | 85 - 95 Tons | 4 - 5 Containers | 25 - 30 Days |
| 4,000 ㎡ | Double Span (With middle columns) | 140 - 150 Tons | 7 - 8 Containers | 40 - 45 Days |
| 10,000 ㎡ | Multi-Span (With middle columns) | 320 - 350 Tons | 15 - 18 Containers | 80 - 90 Days |
We provide detailed 3D installation drawings and step-by-step manuals with every delivery. The standard erection sequence includes:
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2018
Total Annual:
1000000-1500000
Employee Number:
70~150
Ecer Certification:
Verified Supplier
Sichuan Shunyao Supply Chain Management Co., Ltd. Sichuan Shunyao Supply Chain Management Co., Ltd. is a leading provider of integrated steel structure solutions and construction support systems. Headquartered in China, we operate globally, specializing in the supply, project management, and tec... Sichuan Shunyao Supply Chain Management Co., Ltd. Sichuan Shunyao Supply Chain Management Co., Ltd. is a leading provider of integrated steel structure solutions and construction support systems. Headquartered in China, we operate globally, specializing in the supply, project management, and tec...
Get in touch with us
Leave a Message, we will call you back quickly!