China factories

Chat Now Send Email
China factory - Changzhou Feiang Technology Co., Ltd

Changzhou Feiang Technology Co., Ltd

  • China,Hangzhou ,Zhejiang
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Turnkey Steel Structure Warehouse Full Service Design Fabrication Installation
China Turnkey Steel Structure Warehouse Full Service Design Fabrication Installation

  1. China Turnkey Steel Structure Warehouse Full Service Design Fabrication Installation

Turnkey Steel Structure Warehouse Full Service Design Fabrication Installation

  1. MOQ: 500 Square Meters
  2. Price: USD 35-70 / Square Meter (Full Turnkey)
  3. Get Latest Price
Payment Terms T/T, L/C (30% Deposit, 70% Before Shipment)
After-Sales 12-Month Installation Warranty + Lifetime Technical Support
Service Scope Design + Fabrication + Shipping + Installation + Handover
Main Steel Frame Q235B / Q355B Welded H-Section Steel
Structural Warranty 50 Years
Delivery Time 30-60 days for design+fabrication, 15-45 days for on-site installation
Span Range 10-40 Meters
Design Software AutoCAD, Tekla, PKPM, 3D3S, BIM
Packaging Details Complete component packaging with assembly drawings, numbered steel parts, bolt kits, and installation tool sets per container
Documentation Full Structural Drawings, Material Certificates, Installation Manuals
Installation Team Experienced Overseas Construction Crew Available
Supply Ability 30000 Tons per Year
Model Number TKS-01
Brand Name ECER
Place of Origin Shandong, China
Certification ISO 9001:2015, CE

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C (30% Deposit, 70% Before Shipment) After-Sales 12-Month Installation Warranty + Lifetime Technical Support
Service Scope Design + Fabrication + Shipping + Installation + Handover Main Steel Frame Q235B / Q355B Welded H-Section Steel
Structural Warranty 50 Years Delivery Time 30-60 days for design+fabrication, 15-45 days for on-site installation
Span Range 10-40 Meters Design Software AutoCAD, Tekla, PKPM, 3D3S, BIM
Packaging Details Complete component packaging with assembly drawings, numbered steel parts, bolt kits, and installation tool sets per container Documentation Full Structural Drawings, Material Certificates, Installation Manuals
Installation Team Experienced Overseas Construction Crew Available Supply Ability 30000 Tons per Year
Model Number TKS-01 Brand Name ECER
Place of Origin Shandong, China Certification ISO 9001:2015, CE
High Light steel structure warehouse prefab buildingturnkey steel warehouse fabricationprefab steel warehouse complete solution

Turnkey Steel Structure Warehouse — Complete One-Stop Project Delivery

The Turnkey Steel Structure Warehouse is a comprehensive end-to-end solution that eliminates the complexity of international steel building procurement. From initial structural design and steel fabrication through container shipping, customs clearance support, on-site installation, and final project handover — we manage every phase so you can focus on your core business.

Complete Turnkey Service Package

  • Phase 1 — Structural Design: Our engineering team uses AutoCAD, Tekla Structures, PKPM, and BIM to create fully detailed structural drawings customized to your site conditions, local building codes, and functional requirements. Wind load, snow load, and seismic calculations included.
  • Phase 2 — Steel Fabrication: All steel components (H-section columns, beams, purlins, bracing, connection plates) are fabricated in our ISO 9001 certified factory with strict quality control. Material certificates and mill test reports provided for every batch.
  • Phase 3 — Logistics & Shipping: Complete component packaging with numbered part identification, container loading optimization, and full shipping documentation including packing lists, bill of lading, and certificates of origin.
  • Phase 4 — On-Site Installation: Our experienced overseas installation team or supervised local crew assembles the steel frame using bolt-connected components, following detailed assembly drawings. Typical installation time: 15-45 days depending on project scale.
  • Phase 5 — Handover & After-Sales: Final quality inspection, as-built documentation, 12-month installation warranty, and lifetime technical support for any future expansion or modification needs.

Why Choose Turnkey?

International buyers avoid the headaches of coordinating multiple suppliers, managing logistics, and hiring local contractors. A single point of accountability ensures faster project completion, lower total cost, and guaranteed quality from design through handover.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2014

  • Total Annual:

    250000000-300000000

  • Employee Number:

    1200~1500

  • Ecer Certification:

    Verified Supplier

Changzhou Feiang Technology Co., Ltd established in 2014, is an industry-leading enterprise specializing in the production, manufacturing, and installation of light steel residential buildings, steel structure engineering, and prefabricated building components. We are located in Zibo with convenient... Changzhou Feiang Technology Co., Ltd established in 2014, is an industry-leading enterprise specializing in the production, manufacturing, and installation of light steel residential buildings, steel structure engineering, and prefabricated building components. We are located in Zibo with convenient...

+ Read More

Get in touch with us

  • Reach Us
  • Changzhou Feiang Technology Co., Ltd
  • Xiaoshan District, Hangzhou City, Zhejiang Province, China
  • https://www.steelprefabricatedbuilding.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement