| Supply Ability | 500 ton per month |
| Delivery Time | 15 - 20 days |
| Packaging Details | bundle, ton bag, crate or pallet |
| Material | Q345 / Q235 |
| Surface | HDG / Painted |
| Color | Self color or as request |
| Size | OEM Size |
| Brand Name | JET |
| Model Number | Ringlock scaffolding system |
| Certification | SGS |
| Place of Origin | Shandong, China |
View Detail Information
Explore similar products
Hot Dip Galvanized Ringlock Scaffolding System Gravity Self - Locking
Safety Layher Scaffolding Parts Ring System Scaffold All Round Wedge Lock Type
Durable Ringlock Scaffolding System Horizontal With Ledger End Customized Size
Hydraulic Layher Scaffold Components All Round Heavy Duty Scaffolding
Product Specification
| Supply Ability | 500 ton per month | Delivery Time | 15 - 20 days |
| Packaging Details | bundle, ton bag, crate or pallet | Material | Q345 / Q235 |
| Surface | HDG / Painted | Color | Self color or as request |
| Size | OEM Size | Brand Name | JET |
| Model Number | Ringlock scaffolding system | Certification | SGS |
| Place of Origin | Shandong, China | ||
| High Light | ring system scaffold ,all round system | ||
Quick installation ringlock scaffolding convenient operation ringlock
Ringlock scaffolding system is the most advanced all round wedge lock type scaffolding system. This type of scaffolding system consists of scaffolding standards with ring every 0.5m and scaffolding horizontal with ledger end. When connected together, the Ledger end and scaffold ring create a very strong connection.
It is easy to assembly and dismantle by just one person at any height.
The basic components of ringlock scaffolding: scaffolding standard, scaffolding ledger, scaffolding diagonal brace and scaffolding base jack.
Ringlock Scaffolding Standard (Vertical)
| PRODUCT | HEIGHT | WEIGHT | ||
| CODE | METER | FEET | KG | LBS |
| HRS050 | 0.5 | 1’8'' | 2.7 | 5.95 |
| HRS100 | 1.0 | 3’3'' | 4.71 | 10.38 |
| HRS150 | 1.5 | 4’11'' | 7.09 | 15.63 |
| HRS200 | 2.0 | 6’6'' | 9.55 | 21.05 |
| HRS250 | 2.5 | 8’2'' | 12.01 | 26.48 |
| HRS300 | 3.0 | 9’9'' | 14.6 | 32.19 |
| HRS400 | 4.0 | 13’1'' | 19.2 | 42.33 |
Ringlock Scaffolding Ledger (Horizontal)
| PRODUCT | LENGTH | WEIGHT | ||
| CODE | METER | FEET | KG | LBS |
| HRL039 | 0.39 | 1’3'' | 2.17 | 4.78 |
| HRL073 | 0.73 | 2’5'' | 3.51 | 7.74 |
| HRL103 | 1.03 | 3’5'' | 4.51 | 10.01 |
| HRL109 | 1.09 | 3’7'' | 4.75 | 10.47 |
| HRL157 | 1.57 | 4’7' | 6.49 | 14.31 |
| HRL207 | 2.07 | 6’10'' | 8.5 | 18.74 |
| HRL257 | 2.57 | 8’5'' | 10.35 | 22.82 |
| HRL307 | 3.07 | 10’1' | 12.38 | 27.29 |
The ringlock ledger is the ringlock horizontal member of ringlock scaffolding system. They provide horizontal support for ringlock planks. Normal our horizontal Ledger is Made from Φ48.3x3mm scaffolding tube.
Ringlock Brace (Diagonal)
| PRODUCT | SIZE | WEIGHT | ||
| CODE | HEIGHT(m) | LENGTH(m) | KG | LBS |
| HRB2157 | 2 | 1.57 | 8.7 | 19.18 |
| HRB2207 | 2 | 2.07 | 9.51 | 20.97 |
| HRB2257 | 2 | 2.57 | 10.7 | 23.59 |
Ringlock scaffolding diagonal braces are used for the lateral bracing of scaffolding system. They can also be used as compression and tension members for cantilevers/spurs, transmitting loads back into the main scaffold structure.
Ringlock Scaffolding Advantages
1. Stable structure and connection, the wedge lock system guarantees that all ledgers and diagonal braces are secured immediately they are placed;
2. Assembling easily with immediate, safe erection by just one person at any height;
3. The in built joint and the strong simple wedge connections guarantee a faster erection time;
4. SGS certified products with high precision and superior quality;
5. More than 10 years experience factory with automatic welding production line, meet customers’ timely delivery requirement;
6. Experienced engineer team to check the quality, make sure stable quality;
7. Professional sales service with experienced sales team.
![]()
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2012
Total Annual:
8000000-10000000
Employee Number:
50~80
Ecer Certification:
Active Member
Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se... Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se...
Get in touch with us
Leave a Message, we will call you back quickly!