| Delivery Time | 5-8 working days for design, 15-30 days for production |
| Surface Treatment | Anti-corrosion coating with thermal break |
| Main Structure | Thermally broken H-section steel frame |
| Packaging Details | Waterproof plastic film, steel strip bundling and wooden pallets, seaworthy export packing |
| Refrigeration Integration | Prepared openings for cooling units |
| Payment Terms | T/T, L/C, D/P, Western Union |
| Span Width | 12m - 40m |
| Supply Ability | 20,000-30,000 Square Meters per Year |
| Design Life | 50 years |
| Insulation Panel | PU sandwich panel 100mm - 200mm |
| Secondary Structure | Galvanized purlins with thermal isolation pad |
| Door Type | Insulated sliding or roll-up cold room door |
| Eave Height | 4m - 12m |
| Air Tightness | Sealed joints with vapor barrier |
| Certification | CE (EN 1090), ISO 9001:2015 |
| Brand Name | JinHongTong |
| Model Number | JHT-WS-TB-CS |
| Place of Origin | Shandong, China |
View Detail Information
Explore similar products
Construction Prefabricated Steel Structure Workshop Q355 H Section Steel C And Z
Modern Clear Span Prefab Steel Garage Steel Structure Workshop Warehouse Shed
Single Slope Roof Steel Structure Workshop For Fitness Sports Equipment
Relocatable Modular Bolt-Connected Steel Structure Workshop Dismountable
Product Specification
| Delivery Time | 5-8 working days for design, 15-30 days for production | Surface Treatment | Anti-corrosion coating with thermal break |
| Main Structure | Thermally broken H-section steel frame | Packaging Details | Waterproof plastic film, steel strip bundling and wooden pallets, seaworthy export packing |
| Refrigeration Integration | Prepared openings for cooling units | Payment Terms | T/T, L/C, D/P, Western Union |
| Span Width | 12m - 40m | Supply Ability | 20,000-30,000 Square Meters per Year |
| Design Life | 50 years | Insulation Panel | PU sandwich panel 100mm - 200mm |
| Secondary Structure | Galvanized purlins with thermal isolation pad | Door Type | Insulated sliding or roll-up cold room door |
| Eave Height | 4m - 12m | Air Tightness | Sealed joints with vapor barrier |
| Certification | CE (EN 1090), ISO 9001:2015 | Brand Name | JinHongTong |
| Model Number | JHT-WS-TB-CS | Place of Origin | Shandong, China |
| High Light | Thermally Broken Insulated Frame ,Cold Storage Steel Workshop ,Energy Efficient Climate Controlled Building | ||
This thermally broken insulated steel structure workshop is designed for cold storage and climate controlled facilities where maintaining a stable internal temperature directly affects operating cost. A thermal break is introduced between the outer and inner steel members to interrupt conductive heat transfer, while high density polyurethane sandwich panels form a continuous, vapor sealed envelope. Together these measures reduce refrigeration load, prevent condensation and keep running energy costs predictable. The prefabricated steel frame assembles quickly without welding, so a cold storage building can be erected and commissioned in a short window. The configuration is popular with food processors, pharmaceutical distributors and logistics operators who need dependable temperature control combined with structural strength.
Key Features| Parameter | Specification |
|---|---|
| Main Frame | Thermally broken H-section steel frame |
| Insulation Panel | PU sandwich panel 100mm - 200mm |
| Span Width | 12m - 40m |
| Eave Height | 4m - 12m |
| Door Type | Insulated sliding or roll-up cold room door |
| Vapor Barrier | Sealed joints with continuous barrier |
| Refrigeration Interface | Prepared openings for cooling units |
| Air Tightness | Controlled joint sealing |
| Surface Treatment | Anti-corrosion coating with thermal break |
| Design Life | 50 years |
| Fire Rating | Panel core available in fire retardant grade |
| Connection | Fully bolted, no on-site welding |
The building serves cold storage warehouses, chilled and frozen food processing halls, pharmaceutical storage rooms, temperature controlled distribution centers, dairy and meat processing plants and beverage ageing rooms. It also suits climate controlled workshops, laboratories and precision assembly areas that must hold a narrow temperature band. The modular frame allows clean rooms, anterooms and loading vestibules to be added so the facility supports a complete cold chain operation from receiving to dispatch.
Packaging & Quality AssurancePanels are packed to protect against edge damage and moisture, with steel strip bundling and waterproof film on wooden pallets in a seaworthy export configuration. Framing, fixings and installation drawings ship in labeled crates. Each project undergoes insulation thickness verification, joint seal inspection and frame coating checks before departure. A 50-year structural design life applies to the steel frame, with panel performance documented for the mechanical and refrigeration design team.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
300000000-700000000
Employee Number:
200~500
Ecer Certification:
Verified Supplier
Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti... Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti...
Get in touch with us
Leave a Message, we will call you back quickly!