| Delivery Time | 25 - 35 working days after drawing approval |
| Packaging Details | Naked bundles in containers, panels edge stacked, accessories crated by installation sequence |
| Total floor area | 5000 sqm over two levels, 2500 sqm per level |
| Clear height | 4.2 m under mezzanine, 6 m above |
| Floor working load | 5 kN/m2 standard, 7.5 kN/m2 heavy option |
| Egress | Two protected stairs, 45 m maximum travel distance |
| Fire protection | 90 minute intumescent coating, columns and primary beams |
| Supply Ability | 8000 tons per month |
| Payment Terms | T/T 30% deposit, 70% before shipment; L/C at sight |
| Ramp | 1:8 gradient, 4 m wide, anti slip checker plate |
| Primary steel | Q355B H section columns and beams |
| Upper deck | 1.0 mm profiled deck plus 120 mm concrete |
| Mezzanine grid | 6 m by 6 m columns, 200 mm secondary beams |
| Place of Origin | China |
| Certification | ISO 9001, CE, EN 1090 |
| Model Number | KXD-WH-MZ50 |
| Brand Name | KXD Steel Structure |
View Detail Information
Explore similar products
Large Span Industrial Logistics Storage Over 5000 Sqm Steel Structure Warehouse
Prefabricated Barns Prefab Steel Frame House Large Scale Farm Steel Structure
Prefab Steel Structure Building For Warehouse Factory Industrial Shed Corrosion
Overhead Crane 10 Ton Heavy Duty Steel Warehouse Building 25m Span Machinery
Product Specification
| Delivery Time | 25 - 35 working days after drawing approval | Packaging Details | Naked bundles in containers, panels edge stacked, accessories crated by installation sequence |
| Total floor area | 5000 sqm over two levels, 2500 sqm per level | Clear height | 4.2 m under mezzanine, 6 m above |
| Floor working load | 5 kN/m2 standard, 7.5 kN/m2 heavy option | Egress | Two protected stairs, 45 m maximum travel distance |
| Fire protection | 90 minute intumescent coating, columns and primary beams | Supply Ability | 8000 tons per month |
| Payment Terms | T/T 30% deposit, 70% before shipment; L/C at sight | Ramp | 1:8 gradient, 4 m wide, anti slip checker plate |
| Primary steel | Q355B H section columns and beams | Upper deck | 1.0 mm profiled deck plus 120 mm concrete |
| Mezzanine grid | 6 m by 6 m columns, 200 mm secondary beams | Place of Origin | China |
| Certification | ISO 9001, CE, EN 1090 | Model Number | KXD-WH-MZ50 |
| Brand Name | KXD Steel Structure | ||
| High Light | two storey steel warehouse ,mezzanine storage platform ,multi level warehouse building | ||
Land is usually the line item that breaks a warehouse budget, not steel. When a client needs 5000 sqm of storage on a 2500 sqm plot, the answer is a two storey steel warehouse with an intermediate mezzanine that carries racking rather than people. This design puts the mezzanine beams on their own column grid inside the main portal, so the upper floor load never travels through the roof frame. KXD Steel Structure separates the two load paths at design stage, which keeps the roof steel light and the floor steel honest.
The structural decision that saves the most money is the mezzanine grid. A 6 m by 6 m column grid with 200 mm deep secondary beams keeps the floor at 5 kN/m2 working load and still leaves 4.2 m clear under the mezzanine for a standard reach truck. If the client wants a fully open upper deck, the beams grow to 400 mm and the cost rises by roughly a quarter. We present both options with span tables so the buyer chooses with numbers rather than guesswork, and we check the vertical circulation, forklift ramp gradient and fire escape travel distance at the same time because those three items usually decide the final layout.
Access is where two storey warehouses succeed or fail in daily operation. This building includes a 1:8 internal ramp with anti slip deck, a dedicated goods lift shaft if the client needs pallet flow between levels, and a 1.2 m high edge protection rail with toe board on the open side of the mezzanine. Column fire protection is specified as intumescent coating rated to 90 minutes for the ground floor columns, while the upper deck uses a composite profiled deck with 120 mm concrete topping for acoustic and fire separation. Every penetration for sprinkler and cable tray is pre cut in our workshop so the site team is not burning holes in a galvanized beam.
Key Features| Parameter | Specification |
|---|---|
| Total floor area | 5000 sqm over two levels, 2500 sqm per level |
| Mezzanine grid | 6 m by 6 m columns, 200 mm secondary beams |
| Floor working load | 5 kN/m2 standard, 7.5 kN/m2 heavy option |
| Clear height | 4.2 m under mezzanine, 6 m above |
| Primary steel | Q355B H section columns and beams |
| Upper deck | 1.0 mm profiled deck plus 120 mm concrete |
| Fire protection | 90 minute intumescent coating, columns and primary beams |
| Ramp | 1:8 gradient, 4 m wide, anti slip checker plate |
| Egress | Two protected stairs, 45 m maximum travel distance |
Urban distribution centres, spare parts warehouses, e commerce fulfilment hubs and wholesale depots on constrained plots use this layout to double usable floor without buying land. It also fits manufacturers who need raw material storage below and finished goods above on the same site. Where the upper level is used for light assembly rather than storage, we increase the live load and add a resin floor finish so the deck performs as a working floor rather than a racking platform alone.
Engineering Notes and Quality ControlTwo storey warehouses fail on connection design more often than on member size. Every beam to column connection is designed for the actual moment, shear and 5 percent eccentricity, and we issue a connection schedule rather than relying on site welding. Deck studs are welded and bend tested on a 5 percent sample. Concrete topping thickness is verified by a survey before handover. Our engineer also reviews the buyer's racking layout, because point loads from racking legs at mid span are a common cause of unacceptable floor vibration in otherwise correctly sized buildings.
Packaging, Loading and WarrantyColumns and mezzanine beams ship as marked bundles, decking in pallets with edge protection, and stairs and rails crated by level. A lifting plan and erection sequence drawing are supplied, and we recommend erecting the mezzanine frame before the roof so the crane can work from inside. Structural warranty is 10 years, with a 2 year finish warranty. Send your plot dimensions, target floor areas and racking loads and our team will return two layout options with steel weight comparison.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
300000000-700000000
Employee Number:
200~500
Ecer Certification:
Verified Supplier
Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti... Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti...
Get in touch with us
Leave a Message, we will call you back quickly!