| Fire protection | 90 to 120 minute rating to the smoke strategy |
| Supply Ability | 8000 tons per month |
| Delivery Time | 25 - 40 working days after drawing approval |
| Levels | Three retail levels plus roof plant |
| Floor system | 1.2 mm composite deck plus 130 mm topping |
| Structure | Q355B primary, hot dip galvanized secondary |
| Payment Terms | T/T 30% deposit, 70% before shipment; L/C at sight |
| Packaging Details | Naked bundles in containers, panels edge stacked, accessories crated by installation sequence |
| Grid | 9 m by 9 m with transfer beams at anchor units |
| Atrium roof | Steel frame with glass, smoke reservoir at high level |
| Retail live load | 5 kN per square metre, 7.5 kN at atrium edges |
| Escalator wells | Edge beams for machine reactions at 1.5 kN per square metre surround |
| Facade interface | Secondary girts at 1.5 m centres |
| Model Number | KXD-PB-ML3L |
| Brand Name | KXD Steel Structure |
| Place of Origin | China |
| Certification | ISO 9001, CE, EN 1090 |
View Detail Information
Explore similar products
ASTM Light Prefabricated Steel Building With Post Modern Welding Cutting Bending
Strong Light Steel Frame Structures For Aircraft Parking As Light Steel Frame
Modern Prefabricated Lightweight Steel Frame Airplane Steel Hangar Storage Room
Custom Prefabricated Steel Building Office Showroom With H Shape Steel Beam
Product Specification
| Fire protection | 90 to 120 minute rating to the smoke strategy | Supply Ability | 8000 tons per month |
| Delivery Time | 25 - 40 working days after drawing approval | Levels | Three retail levels plus roof plant |
| Floor system | 1.2 mm composite deck plus 130 mm topping | Structure | Q355B primary, hot dip galvanized secondary |
| Payment Terms | T/T 30% deposit, 70% before shipment; L/C at sight | Packaging Details | Naked bundles in containers, panels edge stacked, accessories crated by installation sequence |
| Grid | 9 m by 9 m with transfer beams at anchor units | Atrium roof | Steel frame with glass, smoke reservoir at high level |
| Retail live load | 5 kN per square metre, 7.5 kN at atrium edges | Escalator wells | Edge beams for machine reactions at 1.5 kN per square metre surround |
| Facade interface | Secondary girts at 1.5 m centres | Model Number | KXD-PB-ML3L |
| Brand Name | KXD Steel Structure | Place of Origin | China |
| Certification | ISO 9001, CE, EN 1090 | ||
| High Light | shopping mall steel building ,retail steel structure ,three level mall building | ||
Retail buildings are designed around sight lines and load paths at the same time. A three level mall needs a column grid that lets a 8 m by 8 m anchor tenant exist without a column through the shopfront, an atrium opening that carries a heavy glass roof, and escalator wells that arrive as openings in a floor that has to stay stiff around them. This retail building uses a 9 m by 9 m grid with transfer beams at the anchor zones, composite decks with a 5 kN per square metre retail live load, and an atrium frame designed for the glass roof load and its wind uplift. KXD Steel Structure coordinates the frame with the mall's tenancy plan so the structure serves the leasing strategy rather than fighting it.
Tenancy flexibility is a structural decision made early. Retailers want clear frontage, so we place columns on the mall line and use transfer beams over anchor units to remove internal supports. The cost of a transfer beam is real, but it is far cheaper than losing a tenant because the shop floor has a column in the middle. Escalator and lift wells are formed with edge beams designed for the machine reaction loads, and the well surround carries a 1.5 kN per square metre allowance for the balustrade and finishes rather than relying on a nominal figure.
Fire, smoke and egress drive the atrium design more than aesthetics. The atrium glass roof is supported on a steel frame with a smoke reservoir at the top, and the structural frame around the opening is fire protected to the period the smoke strategy requires. Floor slabs around the atrium are designed for crowd loading during evacuation, and every level has two means of escape that do not pass through the atrium. Where the client wants a large format glass facade to the car park or the street, secondary steel girts are set at 1.5 m so the facade system has a proper structural backing rather than a cladding rail.
Key Features| Parameter | Specification |
|---|---|
| Levels | Three retail levels plus roof plant |
| Grid | 9 m by 9 m with transfer beams at anchor units |
| Retail live load | 5 kN per square metre, 7.5 kN at atrium edges |
| Floor system | 1.2 mm composite deck plus 130 mm topping |
| Atrium roof | Steel frame with glass, smoke reservoir at high level |
| Escalator wells | Edge beams for machine reactions at 1.5 kN per square metre surround |
| Structure | Q355B primary, hot dip galvanized secondary |
| Fire protection | 90 to 120 minute rating to the smoke strategy |
| Facade interface | Secondary girts at 1.5 m centres |
Shopping centres, retail parks with covered malls, mixed use podium retail, supermarket and hypermarket buildings and outlet centres use this structure. It also suits transport hub retail where the building sits above or beside a concourse. Because the frame is steel, a mall can be built in phases and extended by adding bays or levels later, provided the foundations and columns are designed for the final configuration from the outset.
Engineering Notes and Quality ControlRetail structures are checked against the tenancy plan, not just the structural drawings. We verify column positions against the leasing layout, confirm transfer beam cambers, and check atrium edge deflections against the glazing supplier's limits, because a 10 mm excess deflection can crack a glass panel. Deck openings are inspected against the service drawing before the topping is poured. Fire protection thickness is measured on every protected member and logged by level. A deflection survey is carried out under a load test on the atrium bridge before handover.
Packaging, Loading and WarrantySteel ships as bundles by level and zone, with transfer beams flagged separately for early erection. Decking is palleted per pour area and fire protection materials are supplied with application records. Erection drawings show the atrium sequence and the temporary propping required before the glass roof frame is completed. Structural warranty is 10 years, coating warranty 15 years. Provide your tenancy plan, mall circulation and facade intent for a framing study with transfer beam options.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
300000000-700000000
Employee Number:
200~500
Ecer Certification:
Verified Supplier
Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti... Jinhongtong Group Co.,ltd. is a professional and leading integrated service provider specializing in steel structure engineering, dedicated to offering one-stop, customized integrated solutions for steel structure workshops, warehouses, and multi-storey steel buildings. Our services cover the enti...
Get in touch with us
Leave a Message, we will call you back quickly!