Packaging Details | According to detailed order |
Delivery Time | Negotiation |
Payment Terms | According to detailed order |
Tires specification | 11.00R20 12PR,12R22.5 12PR,11R22.5 12PR |
Tractor power | 275kw |
Max saddle load | 16000kg |
name | Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge |
Less Operators | 2-3 |
payment | According to detailed order |
brand name | China Harzone |
Place of Origin | China |
Brand Name | Harzone |
View Detail Information
Explore similar products
Accomplishing Military Bridges Erection And Retrieval By Itself
Tracked Load-60t Mechanized Bridge Emergency Rescue Equipment 21m
Axle Load 13 Tons 21m Mechanized Bridge Overcoming Small Medium Rivers
51m Large - Span Mechanized Bridge / Emergency Bridge With Flexibility, Simple
Product Specification
Packaging Details | According to detailed order | Delivery Time | Negotiation |
Payment Terms | According to detailed order | Tires specification | 11.00R20 12PR,12R22.5 12PR,11R22.5 12PR |
Tractor power | 275kw | Max saddle load | 16000kg |
name | Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge | Less Operators | 2-3 |
payment | According to detailed order | brand name | China Harzone |
Place of Origin | China | Brand Name | Harzone |
High Light | tank semi trailer ,semi tank trailers ,truck semi trailer |
Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
Introduction of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.
Main Features of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
1 Fast erection: 10min
2 Less operators: 2-3
3 Excellent cross country performance: using 8×8 militarycross country chassis
4 High level of mechanization & low labor intensity: using remote control operation
5 High loading capacity: Tracked load-60t, wheeled load-13t
Basic composition of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
The span is folded on the chassis when transportation and erected by chassis. Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment.
Usage of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is main used as 21m long, 3.3m wide short-lived stations for overcoming small medium rivers, dry gaps and craters, guarantee all kinds of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across quickly.
SLess Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge Pictures
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1967
Total Annual:
200 Million USD-205 Million
Employee Number:
2000~2000
Ecer Certification:
Verified Supplier
China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ... China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ...
Get in touch with us
Leave a Message, we will call you back quickly!