Supply Ability | 40000 Ton/Tons per Year |
Standard | AiSi, ASTM, BS, GB |
Grade | Q345B-Q460C |
Type | Temporary Bridge |
Application | Steel Structure Bridge |
Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
Certificate | ISO9001:2015 |
Color | According to Requirement |
Structure type | Steel Truss Bridge |
Installation | Engineers Guidance |
Brand Name | China Harzone |
Certification | ISO9001:2015 |
Place of Origin | Hubei,China |
View Detail Information
Explore similar products
Double Lane Bailey Suspension Bridge Compact With Portable Steel
Bailey Steel Timber Deck Bridges High Stiffness With Heavy loading
Temporary Steel Deck Bailey Bridge Professional With High Strength
Timber Deck Bailey Steel Truss Bridge Compact With Single Lane
Product Specification
Supply Ability | 40000 Ton/Tons per Year | Standard | AiSi, ASTM, BS, GB |
Grade | Q345B-Q460C | Type | Temporary Bridge |
Application | Steel Structure Bridge | Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
Certificate | ISO9001:2015 | Color | According to Requirement |
Structure type | Steel Truss Bridge | Installation | Engineers Guidance |
Brand Name | China Harzone | Certification | ISO9001:2015 |
Place of Origin | Hubei,China | ||
High Light | Portable Temporary Steel Bridge ,Bailey Temporary Steel Bridge ,Modular Army Bailey Bridge |
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge is portable steel bridge ,It has been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.
Standard Roadway 3.15m / 4.2m Bailey Truss Bridge Army Temporary Bridge surface protection can be paint or hot-dip galvanized.
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. The bridge structure can be designed according to the bridge span and load requirement,which can quickly construct a temporay or semi-permanent bridge.
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge Specifications:
Type | CB200 |
Designed Span | 6-54m |
Designed Load | HL93,HA,HB,tracked load 50t |
Panel Dimension | 2.134*3.048m |
Carriageway Width | 4.2m/7.35m |
Deck type | steel deck/ wood deck |
CB200 Designed Span 6-54m Temporary Steel Bridge Bailey Truss Bridge Advantage:
Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity
easy disassembling,
heavy loading capacity,
Before offering the quotation, we need to know the exact usage condition so that we can propose a proper technical specification. Hereon, pls kindly supply the following information as detailed as possible:
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1967
Total Annual:
200 Million USD-205 Million
Employee Number:
2000~2000
Ecer Certification:
Verified Supplier
China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ... China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ...
Get in touch with us
Leave a Message, we will call you back quickly!