Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Off road racing adjustable coilover shock absorber for Tundra 2'' lift kit
Lubrication system: Using the highest grade lubricating oil for competitive shock absorbers, it ensures that the shock absorber can effectively suppress the rapid rise of oil temperature during long-term movement, which may cause damping failure of the shock absorber.
Gas storage cylinder: It adopts 6061-T6 precision grinding inside, hard oxidation outside, and ordinary red oxidation. Rubber lining: Made from brand new Malaysian materials, it can withstand high-strength loads, reduce noise, ensure ride comfort, solve bearing noise problems, and is more durable. It is the best choice for mass-produced cars.
business type
4x4 suspension lift kit manufacturer
Spring Type
Coil Spring
Product name
Complete Struts
Condition
New
Car Model
Road Cars
Spring Material
Steel
FAQ
1:Are you a trading company or factory ?
A:We're a factory located in the international metropolis Guangzhou with our sales team.
2: Do you accept the OEM project?
A: Of course, your original artworks or samples would be available, Also please be noted thatwe can make the designs according to the clients'specific demand.
3: What's your MoQ of your ltems?
A: As usual, MOQ 10 kits for the shock aborbers and 10pcs for the components.
4.What's your lead tlme?
A. lt mostly depend on the quantity and items number, Normally, it costs 7-10 working daysfor the samples and 30 working days for the mass production; We can arrange the deliverywithin 1-2 days with the stock.
5.What's your trade terms?
A: EXW/F0B/CIF/DDU/DDP would be OK, Sample by fullpayment T/T .
5.What's your guarantee to your products?
A: Basically, 1 year quality guarantee and every client will get our lifelong after-sale service.