| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | 50000 Tons/year |
| Delivery Time | 20-50days |
| Main Structurel Material | Q355B/ASTM A572 Gr.50/EN S355/JIS SM490 |
| Secondary Structurel Material | Q235B / ASTM A36/ EN S235JR / JIS SS400 |
| Other Material | Q460 / ASTM A572 Gr.65 /EN S460 / JIS SM570 |
| Customization | Style,size,Color,Material |
| After-Sale Service | Online Technical Support, Onsite Installation,Onsite Training,Onsite Inspection,Installation Drawings Support |
| Project Solution Capability | CAD graphic design, 3D Tekla modeling design, total solution for projects,One-stop steel structure solution,Project-based supply |
| Column And Beam | Welded H-section/Hot-rolled H-beam/Box Column |
| Purlin | C.Z Shape Steel Channel |
| Roof And Wall Panel | EPS/Rock Wool/PU / PIR Sandwich Panel Corrugated/Trapezoidal Steel Sheet/Customized |
| Window | Aluminum Alloy / PVC /Industrial Louver Window |
| Door | Sliding/Rolling Shutter/Hinged Steel/Customized Steel Door |
| Surface Treatment | Hot-dip Galvanized Zinc-rich Primer + Top Coat Anti-corrosion Coating |
| Service Life | 20-50 Years |
| Life Span | More Than 50 Years |
| Brand Name | HCGG |
| Model Number | SSWK001 |
| Certification | CE/ISO 9001/ISO 3834/ISO 14001/ISO 45001 |
| Place of Origin | Henan,China |
View Detail Information
Explore similar products
High Strength Steel Structure Workshop Building Rapid Erection Column Free
Q235B Q355B Material Steel Structure Workshop Frame Construction Factory Bolt
Heavy Duty Prefabricated Steel Structure Factory Metal Workshop Building Fast
Easy Maintenance Steel Structure Workshop Prefabricated Steel Building Eco
Product Specification
| Payment Terms | L/C,T/T,Western Union | Supply Ability | 50000 Tons/year |
| Delivery Time | 20-50days | Main Structurel Material | Q355B/ASTM A572 Gr.50/EN S355/JIS SM490 |
| Secondary Structurel Material | Q235B / ASTM A36/ EN S235JR / JIS SS400 | Other Material | Q460 / ASTM A572 Gr.65 /EN S460 / JIS SM570 |
| Customization | Style,size,Color,Material | After-Sale Service | Online Technical Support, Onsite Installation,Onsite Training,Onsite Inspection,Installation Drawings Support |
| Project Solution Capability | CAD graphic design, 3D Tekla modeling design, total solution for projects,One-stop steel structure solution,Project-based supply | Column And Beam | Welded H-section/Hot-rolled H-beam/Box Column |
| Purlin | C.Z Shape Steel Channel | Roof And Wall Panel | EPS/Rock Wool/PU / PIR Sandwich Panel Corrugated/Trapezoidal Steel Sheet/Customized |
| Window | Aluminum Alloy / PVC /Industrial Louver Window | Door | Sliding/Rolling Shutter/Hinged Steel/Customized Steel Door |
| Surface Treatment | Hot-dip Galvanized Zinc-rich Primer + Top Coat Anti-corrosion Coating | Service Life | 20-50 Years |
| Life Span | More Than 50 Years | Brand Name | HCGG |
| Model Number | SSWK001 | Certification | CE/ISO 9001/ISO 3834/ISO 14001/ISO 45001 |
| Place of Origin | Henan,China | ||
| High Light | Quick Install PEB Steel Workshop ,Q235 Hot Rolled PEB Steel Warehouse ,Custom Design PEB Steel Structure | ||
| Component | Specification |
|---|---|
| Main Steel Frame | Column: Q235, Q355 Welded H Section Steel Beam: Q235, Q355 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin Knee Brace: Q235 Angle Steel Tie Rod: Q235 Circular Steel Pipe Brace: Q235 Round Bar Vertical and Horizontal Support: Q235 Angle Steel, Round Bar or Steel Pipe |
| Maintenance System | Roof System: Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories Wall System: Wall Panel (Sandwich Panel or Corrugated Steel Sheet) Window System: Aluminum Alloy Window/ PVC Window/Skylight Door System: Sliding Sandwich Panel Door/ Rolling Metal Door/ PVC Door Others: PVC Rainspout, Gutter etc |
![]()
![]()
![]()
FAQ
Are you a factory?
Yes, our factory has been producing and selling steel structures for many years. We have rich experience in the steel building manufacturing industry.
What kind of drawing will you provide?
Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.
Can you send engineers to install my structures?
We can provide you with detailed installation drawings and videos for free, and we can also send engineers as installation supervisors upon request.
How long does it take to get my building?
The lead time varies, but typically it takes 2 weeks to complete the drawings and 25-45 days for delivery (depending on the complexity).
How can I get a quotation for the project?
If you have drawings, we can provide a quotation accordingly. If you don’t have a design, we will create some drawings for your confirmation before offering a quotation.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2003
Total Annual:
30000000-50000000
Employee Number:
300~400
Ecer Certification:
Verified Supplier
Luoyang Huicheng Steel Structure Co., Ltd. (HCGG),established in 2003 (formerly Henan Sixth Construction Group). Located in Luoyang, a city renowned for its strong industrial base and mature manufacturing ecosystem, we are a professional steel structure solutions provider. We own a production base o... Luoyang Huicheng Steel Structure Co., Ltd. (HCGG),established in 2003 (formerly Henan Sixth Construction Group). Located in Luoyang, a city renowned for its strong industrial base and mature manufacturing ecosystem, we are a professional steel structure solutions provider. We own a production base o...
Get in touch with us
Leave a Message, we will call you back quickly!