| Payment Terms | L/C,T/T,Western Union,.pay |
| Supply Ability | 50000 Tons/year |
| Delivery Time | 20-45days |
| Main Structurel Material | Q355B/ASTM A572 Gr.50/EN S355/JIS SM490 |
| Secondary Structurel Material | Q235B / ASTM A36/ EN S235JR / JIS SS400 |
| Other Material | Q460 / ASTM A572 Gr.65 /EN S460 / JIS SM570 |
| Customization | Style,size,Color,Material |
| Project Solution Capability | CAD graphic design, 3D Tekla modeling design, total solution for projects,One-stop steel structure solution,Project-based supply |
| After-sale Service | Online Technical Support, Onsite Installation,Onsite Training,Onsite Inspection,Installation Drawings Support |
| Column and Beam | Welded H-section/Hot-rolled H-beam/Box column |
| Purlin | C.Z Shape Steel Channel |
| Roof and Wall panel | EPS/Rock wool/PU / PIR sandwich panel,Corrugated/Trapezoidal steel sheet/Customized/ |
| Window | Aluminum alloy / PVC /Industrial louver window |
| Door | Sliding/Rolling shutter/Hinged steel/Customized steel door |
| Surface treatment | Hot-dip galvanized Zinc-rich primer + top coat Anti-corrosion coating |
| Service Life | 20-50 Years |
| Life Span | More Than 50 Years |
| Brand Name | HCGG |
| Certification | CE/ISO 9001/ISO 3834/ISO 14001/ISO 45001 |
| Place of Origin | Henan,China |
View Detail Information
Explore similar products
Prefabricated Steel Structure Warehouse Workshop Industrial Building Wind Snow
High Strength Q355B Steel Pre Engineered Metal Building Earthquake Resistant
Q235b Q355b Prefab Steel Structure Frame Building For Industrial Warehouse
Modular Expandable Multi Story Steel Structure Prefacricated Storage Warehouse
Product Specification
| Payment Terms | L/C,T/T,Western Union,.pay | Supply Ability | 50000 Tons/year |
| Delivery Time | 20-45days | Main Structurel Material | Q355B/ASTM A572 Gr.50/EN S355/JIS SM490 |
| Secondary Structurel Material | Q235B / ASTM A36/ EN S235JR / JIS SS400 | Other Material | Q460 / ASTM A572 Gr.65 /EN S460 / JIS SM570 |
| Customization | Style,size,Color,Material | Project Solution Capability | CAD graphic design, 3D Tekla modeling design, total solution for projects,One-stop steel structure solution,Project-based supply |
| After-sale Service | Online Technical Support, Onsite Installation,Onsite Training,Onsite Inspection,Installation Drawings Support | Column and Beam | Welded H-section/Hot-rolled H-beam/Box column |
| Purlin | C.Z Shape Steel Channel | Roof and Wall panel | EPS/Rock wool/PU / PIR sandwich panel,Corrugated/Trapezoidal steel sheet/Customized/ |
| Window | Aluminum alloy / PVC /Industrial louver window | Door | Sliding/Rolling shutter/Hinged steel/Customized steel door |
| Surface treatment | Hot-dip galvanized Zinc-rich primer + top coat Anti-corrosion coating | Service Life | 20-50 Years |
| Life Span | More Than 50 Years | Brand Name | HCGG |
| Certification | CE/ISO 9001/ISO 3834/ISO 14001/ISO 45001 | Place of Origin | Henan,China |
| Category | Specifications (4S Car Showroom) |
|---|---|
| Main Steel Structure | Material: Q345B/Q235B H-section steel columns/beams, box columns for large spans; Connection: High-strength bolted (no on-site welding, fast & precise); Surface Treatment: Hot-dip galvanizing/epoxy zinc-rich triple coating (anti-corrosion life ≥ 20 years); Seismic Grade: Up to 9-degree, Wind Resistance: 150–180 km/h, Service Life: ≥50 years |
| Roof & Wall Systems | Roof: Rock wool/PU sandwich panels, standing-seam metal roof (waterproof, thermal insulation, soundproof); Walls: Glass curtain wall (frameless full glass for facades), aluminum composite panels, rock wool sandwich panels; Thermal Insulation: K-value ≤ 0.35 W/(m²·K); Fire Rating: Roof/wall up to Class A |
| Functional Openings & Accessories | Doors: Large sliding vehicle doors, sectional overhead doors for service bays, automatic glass entrance doors, customized; Windows: Aluminum alloy thermal-break windows, frameless display windows, customized |
| Standard Span & Layout | Exhibition Hall: 8–12 m column spacing, column-free large open area for vehicle display; Service Workshop: 6–8 m bay spacing, load-bearing floor for lifts (≥ 5 t/m²); Mezzanine Office/Customer Lounge: Optional 2nd floor/mezzanine with steel floor decking, Customized |
| Construction Cycle | Factory prefabrication: 3–4 weeks; On-site installation: 4–6 weeks (60% faster than traditional concrete structures); Full turnkey project: 8–12 weeks |
| Certifications | ISO, CE, SGS, compliance with local building codes (AISC, Eurocode 3, GB50017) |
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2003
Total Annual:
30000000-50000000
Employee Number:
300~400
Ecer Certification:
Verified Supplier
Luoyang Huicheng Steel Structure Co., Ltd. (HCGG),established in 2003 (formerly Henan Sixth Construction Group). Located in Luoyang, a city renowned for its strong industrial base and mature manufacturing ecosystem, we are a professional steel structure solutions provider. We own a production base o... Luoyang Huicheng Steel Structure Co., Ltd. (HCGG),established in 2003 (formerly Henan Sixth Construction Group). Located in Luoyang, a city renowned for its strong industrial base and mature manufacturing ecosystem, we are a professional steel structure solutions provider. We own a production base o...
Get in touch with us
Leave a Message, we will call you back quickly!