Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs |
Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Steel |
Surface treatment | Galvanized |
Type | HD 200 |
Size | As required |
Certificate | ISO9001 |
Installation | Assembly easy |
Brand Name | HONFENG |
Model Number | OWN |
Certification | ISO9001:2008 |
Place of Origin | Zhejiang, China |
View Detail Information
Explore similar products
Temporary Steel Assembly Bridge Structure Customize Paint
Temporary Steel Bridge Railway Structure Of Stay Cable
Compact Prefabricated Bridges For Vehicular
Prefabricated Steel Bailey Bridge Modular Designed
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs | Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Steel | Surface treatment | Galvanized |
Type | HD 200 | Size | As required |
Certificate | ISO9001 | Installation | Assembly easy |
Brand Name | HONFENG | Model Number | OWN |
Certification | ISO9001:2008 | Place of Origin | Zhejiang, China |
High Light | structural steel bridge ,bailey bridge |
Chinese Steel Fabricator Supply Prefabricated Steel Structural Bailey Bridge Of Reinforced Steel Q345
Compact 100
Compact 200
We can supply different width from 2m~11m with pedestrian walks, different length from 6m~400m with help of piers. Payload can be range from 10t~120ton, with different vehicle types and wheel loads.
Steel Bailey Bridge is one kind of prefabricated highway bridge, which is composed of panels and assembled together to withstand various lengths and strengths allowing the crossing of vehicles. It is easy to be mounted without help of truck cranes in some remote areas, which means to finish installation only by hands of human power. But it will be better to use crane and launching tools for installation surely. There are two models, namely Compact 100 and 200 bridges in international market. In China, there are two sizes of panels accordingly, i.e. 3m*1.4m and 3m *2.134m. It can be assembled into 3.7m, 4.2m and 7.4m standard width bridges or other extra widths. Bridge type shall be decided according to customer's requirement, especially the span, width, load and surface treatment etc. Normally 3.7m width is popular in domestic market, and 4.2m width is popular in international market. Single span bridge can range from 6m to 63m, multi-span bridge can be more than 200m with the help of bridge piers. Now it can be used both as temporary or Permanent bridge, because of its high strength and easy maintenance.
Load, Span, and Bridge Type | |||||
span(m) Load | Automobile-10T | Automobile-15T | Automobile-20T | Catapillar-50T | Trailer-80T |
9 | SS | SS | SS | SS | ———— |
12 | SS | SS | SS | SS | DS |
15 | SS | SS | SSR | SSR | DS |
18 | SS | SSR | DS | DS | DS |
21 | SSR | SSR | DS | DS | DSR |
24 | SSR | DS | DS | DSR | DSR |
27 | SSR | DSR | DSR | DSR | DSR |
30 | DS | DSR | DSR | DSR | TSR |
33 | DSR | DSR | DSR | DSR | TSR |
36 | DSR | DSR | DSR | DSR | TSR |
39 | DSR | DSR | TSR | TSR | TDR |
42 | DSR | TSR | TSR | TSR | TDR |
45 | TSR | TSR | TDR | TDR | ———— |
48 | TSR | DDR | TDR | TDR | ———— |
51 | DDR | DDR | TDR | TDR | ———— |
54 | DDR | DDR | ———— | TDR | ———— |
57 | DDR | TDR | ———— | TDR | ———— |
60 | DDR | TDR | ———— | TDR | ———— |
63 | TDR | ———— | ———— | ———— | ———— |
Note: | |||||
Bridge type: "SS" indicates Single row Single storey; "DS" indicates Double row Single storey; "TS" indicates Triple row Single storey; "DD" indicates Double row Double storey; "TD" indicates Triple row Double storey; "R" indicates Reinforced. |
Single lane bailey bridges HD200, reinforced Steel galvanized for vehicles passing
Features
1. movable and portable
2. removable
3. pre-fabricated
4. easy and quick assembly or disasembly
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!