Products
Manufacturer of a wide range of products which include 800kW DC Arc Furnace Plasma Aluminum Dross Recycling Electric Smelting Equipment,500kW Plasma DC Arc Furnace Copper Cathode Smelting Electric Melting Equipment,PLC Control Pre...
MOQ: 1 Set
Price: USD 200,000 - 650,000 / Set
| Melting Temperature | Up to 1200°C |
| Arc Type | DC Plasma |
| Slag Separation | Automatic Tilting Mechanism |
| Voltage | 380V / 3-Phase / 50Hz |
| Payment Terms | T/T,L/C |
| Cooling System | Closed-Loop Water Cooling |
| Capacity | 8 Ton per Batch |
| Packaging Details | Heavy-duty export wooden crate with moisture-proof barrier, reinforced steel bracing for ocean transport |
| Delivery Time | 90-150 working days after deposit |
| Electrode Type | High-Purity Graphite |
| Furnace Lining | High-Alumina Refractory Brick |
| Metal Recovery Rate | ≥ 92% |
| Control System | PLC Automatic with Remote Monitoring |
| Supply Ability | 8 Sets per Year |
| Power Rating | 800 kW |
| Place of Origin | Sichuan, China |
| Brand Name | WNRLN |
| Model Number | WN-DCAF-800A |
| Certification | ISO 9001:2015, CE |
MOQ: 1 Set
Price: USD 150,000 - 500,000 / Set
| Supply Ability | 10 Sets per Year |
| Melting Temperature | 1500°C |
| Cooling System | Closed-Loop Water Cooling |
| Capacity | 5 Ton per Batch |
| Arc Type | DC Plasma |
| Furnace Lining | Magnesia-Carbon Refractory Brick |
| Voltage | 380V / 3-Phase / 50Hz |
| Delivery Time | 60-120 working days after deposit |
| Packaging Details | Export-grade wooden crate with moisture-proof wrapping, reinforced steel frame for ocean freight |
| Electrode Consumption | ≤ 3.5 kg per Ton |
| Power Rating | 500 kW |
| Control System | PLC Automatic with Touchscreen HMI |
| Payment Terms | T/T,L/C |
| Electrode Type | High-Purity Graphite |
| Place of Origin | Sichuan, China |
| Brand Name | WNRLN |
| Model Number | WN-DCAF-500C |
| Certification | ISO 9001:2015, CE |
MOQ: 1set
Price: To be negotiable
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 5set per month |
| Delivery Time | 8-15 work days |
| Recovery Efficiency | ≥98% |
| Control System | PLC control |
| Safety Features | Overheat protection, leakage protection |
| Capacity | 1000 kg |
| Material | Stainless steel |
| Power Supply | 3-phase, 380V, 50Hz |
| Heating Element | Silicon carbide rod |
| Cooling System | Water cooling |
| Brand Name | Shaanxi Chengda |
| Model Number | PLC control Precious metal recovering electric furnace |
| Certification | ISO9001 |
| Place of Origin | China |
MOQ: 1set
Price: Price is negotiable
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Delivery Time | 8-12 work days |
| Supply Ability | 5 set per month |
| Condition | New |
| Type | Precious metal materials recovery DC electric furnace |
| Use | Precious metal recovery electric furnace |
| Brand Name | Shaanxi Chengda |
| Model Number | customizable |
| Certification | ISO9001 |
| Place of Origin | Xi 'an, Shaanxi, China |
MOQ: 1set
Price: Price is negotiable
| Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Ability | 3set per month |
| Delivery Time | 8-15 work days |
| Category 1 | Dc drive system |
| Category 2 | DCS |
| Category 3 | PLC |
| Category 4 | Computer process control and management system information system |
| Brand Name | Shaanxi Chengda |
| Model Number | Customized |
| Certification | ISO9001 |
| Place of Origin | Chengda, Shaanxi, China |
MOQ: 1set
Price: The price will be negotiated based on the technical requirements and supply scope of Party A
| Supply Ability | Complete production supply chain, supply on time, and meet quality standards |
| Delivery Time | 2 months |
| Packaging Details | Discuss according to the specific requirements of Party A |
| Tilting Method | Hydraulic |
| Refining Time | 10-60 minutes |
| Power | 100-1000 kW |
| Application | Steelmaking process |
| Cooling Method | Water cooling |
| Temperature Control | Automatic |
| Heating Method | Electric arc heating |
| Capacity | 5-300 tons |
| Brand Name | Shaanxi Chengda |
| Model Number | Cooling Method in Steelmaking |
| Certification | ISO9001 |
| Place of Origin | China |
MOQ: 1 unit
Price: The price will be negotiated based on the technical requirements and supply scope of Party A
| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | Complete production supply chain, supply on time, and meet quality standards |
| Delivery Time | 3 months |
| Packaging Details | Discuss according to the specific requirements of Party A |
| Brand Name | Shaanxi Chengda |
| Model Number | Negotiate based on equipment processing capacity |
| Certification | ISO 9001 |
| Place of Origin | Shaanxi China |
MOQ: 1 unit
Price: The price will be negotiated based on the technical requirements and supply scope of Party A
| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | Complete production supply chain, supply on time, and meet quality standards |
| Delivery Time | 2~3 months |
| Packaging Details | Discuss according to the specific requirements of Party A |
| Brand Name | Shaanxi Chengda |
| Model Number | Negotiate based on equipment processing capacity |
| Certification | ISO 9001 |
| Place of Origin | Shaanxi China |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!