
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Type | Fast-Lay Composite PU+SBR Track |
| Name | School Track |
| Installation | 7-8 Day Full Installation |
| Features | Fast Installation, Quick Turnaround |
| Payment Terms | EXW |
| Service_Life | 8-10 Years |
| Impact_Absorption | 35-45% |
| Structure | Fast-Cure PU+SBR Base + EPDM Top |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Thickness | 13mm |
| Application | Renovations, School Holidays |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Place of Origin | Huizhou, Guangdong, China |
| Brand Name | lida&lvhuan |
| Model Number | Please refer to the model numbers in the product catalog |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
View Detail Information
Explore similar products
Recycled Composite Running Track Wear Resistant Jogging Track 10mm - 13mm
High Elasticity Athlete Running Track Professional Training Track Blue
Eco Friendly Composite Running Track Recycled Athletic Running Track For Green
Hybrid Plastic Running Track High Elasticity Running Synthetic Track 13mm
Product Specification
| Type | Fast-Lay Composite PU+SBR Track | Name | School Track |
| Installation | 7-8 Day Full Installation | Features | Fast Installation, Quick Turnaround |
| Payment Terms | EXW | Service_Life | 8-10 Years |
| Impact_Absorption | 35-45% | Structure | Fast-Cure PU+SBR Base + EPDM Top |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. | Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Thickness | 13mm | Application | Renovations, School Holidays |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag | Place of Origin | Huizhou, Guangdong, China |
| Brand Name | lida&lvhuan | Model Number | Please refer to the model numbers in the product catalog |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | ||
| High Light | Durable School Track ,School Track 13mm ,13mm Athletic Synthetic Track | ||
Key Advantages: Full install in 5–7 days | Works on existing asphalt or concrete | No specialised curing room needed | Playable in 48 hours after finish | Ideal for summer break projects
The Rapid Installation Composite Running Track is a fast‑curing version of the standard composite system. It uses a single‑component PU binder that sets quickly even at moderate temperatures (15–30°C). The three layers are applied wet‑on‑wet, eliminating drying time between coats. A 400m track can be completed by a 6‑person team in 6 days, compared to 12–15 days for traditional systems. This makes it perfect for projects with strict deadlines – such as school renovations that must finish before students return.
Suitable for schools, university fields, residential jogging paths, and sports club upgrades where downtime must be minimised.
| Parameter | Value |
|---|---|
| Minimum base cure | Old asphalt: immediate; new concrete: 14 days |
| Installation rate | 700–900 m²/day (6 workers) |
| Time to walk | 24 hours after last coat |
| Time to run | 48 hours |
| Total thickness | 13mm (8+3+2) – can be reduced to 10mm |
| Impact absorption | 36–43% (slightly firmer for fast cure) |
| All other parameters | Meet World Athletics training standards |
| Step | Traditional Composite | Rapid Composite |
|---|---|---|
| Base prep | 1–2 days | 0.5 day (wash only) |
| Base layer cure | 24h | 6h |
| Reinforcement cure | 12h | 4h |
| Top layer cure | 24h | 12h |
| Total | 12–15 days | 5–7 days |
School tracks during summer or winter break
University fields between semesters
Residential developments opening on schedule
Sports club upgrades before tournament
| Country | Project | Area | Install time | Year |
|---|---|---|---|---|
| Thailand | International school | 3,300 m² | 6 days | 2024 |
| UAE | Residential community track | 2,200 m² | 5 days | 2025 |
| Chile | University training field | 2,800 m² | 7 days | 2024 |
No MOQ. Fast‑cure binder must be used within 3 months of delivery. Lead time 15 days.
Q: Is the durability the same as standard composite?
→ Yes, 10+ years. Fast cure does not reduce chemical strength.
Q: Can we install it ourselves?
→ Yes. We provide video SOP and remote support. Paid technician available.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...
Get in touch with us
Leave a Message, we will call you back quickly!