
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Type | Fast-Cure Sports Flooring |
| Payment Terms | EXW |
| Packaging Details | 20kg/barrel,30kg/barrel, Weight can be tailored based on specific requirements. |
| Name | Rapid-Install Si-PU Court |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Installation | 3-5 Day Full Installation |
| Features | Fast Cure, Low Downtime, Quick Deploy |
| Application | Renovations, Quick Turnaround |
| Material | Silicone PU, Fast-Cure Formula |
| Thickness | 3-5mm |
| Service_Life | 6-8 Years |
| Model Number | Please refer to the model numbers in the product catalog |
| Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
| Place of Origin | Huizhou, Guangdong, China |
View Detail Information
Explore similar products
Versatile PU Sports Flooring UV Resistant Sports Court Flooring For Community
Purple Sport Court Flooring Fall Protection Playground Outdoor Flooring
Silicone PU Sports Flooring ITF Certified Polyurethane Sports Flooring 3mm - 8mm
Eco Friendly Badminton Hall Flooring Indoor / Outdoor Gym Hall Flooring With Air
Product Specification
| Type | Fast-Cure Sports Flooring | Payment Terms | EXW |
| Packaging Details | 20kg/barrel,30kg/barrel, Weight can be tailored based on specific requirements. | Name | Rapid-Install Si-PU Court |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation | Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Installation | 3-5 Day Full Installation | Features | Fast Cure, Low Downtime, Quick Deploy |
| Application | Renovations, Quick Turnaround | Material | Silicone PU, Fast-Cure Formula |
| Thickness | 3-5mm | Service_Life | 6-8 Years |
| Model Number | Please refer to the model numbers in the product catalog | Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | Place of Origin | Huizhou, Guangdong, China |
| High Light | Multi Use PU Sports Flooring ,PU Sports Flooring 3mm ,5mm Outdoor Sport Court Flooring | ||
Key Advantages:
Product Overview
The Rapid‑Install Si‑PU Court system is optimised for speed and convenience. All underlayers (primer, interface agent, elastic PU, reinforcement PU) are one‑component moisture‑curing formulations with accelerated cure rates – each coat dries in 4‑8 hours at 25°C (compared to 8‑12 hours for standard Si‑PU). The waterborne top coat dries in 2‑4 hours. A complete 3‑4 mm thickness system can be installed in 4‑5 days by a 3‑person crew, including surface preparation. The system bonds excellently to old asphalt, concrete, and even existing acrylic or polyurethane courts after proper cleaning and priming. This makes it perfect for school holiday renovations, tournament venue upgrades, and urgent repairs.
✅ Ideal for: school summer/winter break projects, club court refurbishment, conversion of hard courts to cushioned courts, urgent repair of damaged sports surfaces, and temporary event courts.
| Parameter | Value |
|---|---|
| Total thickness | 3–4 mm (2‑3 mm elastic + 1 mm reinforcement + top) |
| Drying time per coat (25°C) | Primer/interface: 4h; Elastic/reinforcement: 4‑8h; Top coat: 2‑4h |
| Full cure to play | 48‑72 hours |
| Total installation time (400 m²) | 4‑5 days (3 workers) |
| Shock absorption | 25‑35% |
| Service life | 8‑10 years |
| Step | Standard Si‑PU | Rapid‑Install Si‑PU |
|---|---|---|
| Base prep | 1 day | 0.5‑1 day |
| Primer + interface (2 coats) | 1.5 days (drying 12h each) | 1 day (drying 4h each) |
| Elastic layer (2‑3 coats) | 2‑3 days (12h dry) | 1.5 days (8h dry) |
| Reinforcement (1 coat) | 0.5 day + 12h | 0.5 day + 4h |
| Top coat (2 coats) | 1 day + 24h | 0.5 day + 12h |
| Total | 7‑10 days | 4‑5 days |
| Country | Project | Area | Thickness | Install time | Year |
|---|---|---|---|---|---|
| UAE | International school (holiday project) | 500 m² | 4 mm | 5 days | 2024 |
| Chile | Club basketball court refurbishment | 400 m² | 3.5 mm | 4 days | 2025 |
| Poland | Public park court (urgent repair) | 350 m² | 3 mm | 4 days | 2024 |
Same as standard. Rapid‑cure PU has 6‑month shelf life. Lead time 15 days. No MOQ.
Q: Does fast cure affect performance?
→ No. Final mechanical properties (shock absorption, rebound, tensile strength) are identical to standard Si‑PU. Only drying speed is increased.
Q: Can I apply this over old cracked asphalt?
→ Minor cracks (<3 mm) can be filled. Major cracks require base repair before applying Si‑PU.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...
Get in touch with us
Leave a Message, we will call you back quickly!