Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Thickness | 13mm (10+3mm), 10-15mm Range |
| Top_Layer | Virgin EPDM, 18-22% Rubber |
| Payment Terms | EXW |
| Name | Synthetic Running Track |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Application | Renovations, Tight Deadlines |
| Installation | 700-900 m²/Day, 8-Day Full |
| Impact_Absorption | 42-47% |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Features | Fast Cure, Ready in 72 Hours |
| Service_Life | 10-12 Years |
| Structure | Fast-Cure Microfoam + EPDM Top |
| Model Number | Please refer to the model numbers in the product catalog |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
| Brand Name | lida&lvhuan |
| Place of Origin | Huizhou, Guangdong, China |
View Detail Information
Explore similar products
Custom Running Synthetic Track Lightweight Athlete Running Track 13mm
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track
Product Specification
| Thickness | 13mm (10+3mm), 10-15mm Range | Top_Layer | Virgin EPDM, 18-22% Rubber |
| Payment Terms | EXW | Name | Synthetic Running Track |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag | Application | Renovations, Tight Deadlines |
| Installation | 700-900 m²/Day, 8-Day Full | Impact_Absorption | 42-47% |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. | Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Features | Fast Cure, Ready in 72 Hours | Service_Life | 10-12 Years |
| Structure | Fast-Cure Microfoam + EPDM Top | Model Number | Please refer to the model numbers in the product catalog |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | Brand Name | lida&lvhuan |
| Place of Origin | Huizhou, Guangdong, China | ||
| High Light | Microfoam Synthetic Running Track ,Rapid Installation Sports Running Track ,Sports Running Track Blue | ||
Key Advantages: Fast‑cure microfoam PU binder | Installation rate 700–900 m²/day | Usable in 72 hours after finish | No extended curing between layers | Ideal for pre‑season facility upgrades
The Rapid Installation Foamed Full PU Track combines the comfort of microfoam technology with a fast‑cure binder system. The microfoam elastic layer cures in 12 hours (normally 24–36 hours), and the top coat cures in 12 hours (normally 48 hours). A full 13mm track can be installed by a 6‑person crew in 7–8 days, compared to 15–18 days for standard foamed systems. The track is ready for line marking and competition use within 72 hours of finishing the top coat.
Perfect for sports centres preparing for upcoming seasons, school stadiums during short holiday breaks, clubs needing rapid upgrades, and last‑minute event venue preparations.
| Parameter | Value |
|---|---|
| Minimum base cure | Old asphalt: immediate; new concrete: 10 days |
| Installation rate | 700–900 m2/day (6 workers) |
| Microfoam base layer cure | 12 hours |
| Top coat cure | 12 hours |
| Time to competition use | 72 hours after top coat |
| Total thickness | 13mm (10+3) – can be 10–15mm |
| Impact absorption | 42–47% (within standard) |
All other mechanical properties meet World Athletics standards.
| Step | Standard Foamed Full PU | Rapid Foamed Full PU |
|---|---|---|
| Base prep | 1–2 days | 0.5 day (wash only) |
| Microfoam pour & cure | 1.5 days (pour + 24h cure) | 1.5 days (pour + 12h cure) |
| Top coat & scatter | 1.5 days (pour + 48h cure) | 1.5 days (pour + 12h cure) |
| Total | 15–18 days | 7–8 days |
Sports centres upgrading before league season
School stadiums during summer/winter breaks
University track renovations between semesters
Clubs needing rapid facility upgrades for tournaments
| Country | Project | Area | Install time | Year |
|---|---|---|---|---|
| Malaysia | International school stadium | 3,200 m² | 8 days | 2024 |
| UAE | Sports club training track | 4,000 m² | 7.5 days | 2025 |
| Chile | University competition track | 2,900 m² | 7 days | 2024 |
No MOQ. Fast‑cure microfoam binder shelf life: 2 months – order when ready to install. Lead time 15 days.
Q: Does fast cure affect the microfoam structure?
→ No. The cell formation is controlled by a separate foaming catalyst – fast cure only reduces waiting time, not final properties.
Q: Can it be installed in cold weather?
→ Minimum application temperature is 10°C. For colder climates, we supply a cold‑cure additive.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...